Maintenance Specifications - July thru December
July 2014 Workbook
for Lettings Effective July - December 2014
Special Provisions - Specific clauses adding to or revising the Standard Specifications, setting forth conditions varying from or additional to the Standard Specifications for a specific project.
Supplemental Specifications - Additions or revisions to the Standard Specifications.
History of Revisions - To review the History of revisions for this Workbook.
Mandatory Revisions - Critical modifications implemented for the Workbook.
STANDARD MAINTENANCE SPECIAL PROVISION | File Name | Usage Note |
---|---|---|
SPECIAL PROVISIONS | SP0000001 | All Jobs |
DEFINITIONS AND TERMS. (REV 7-30-13) (1-14) | SP0010300 | All Maintenance Contracts |
PROPOSAL REQUIREMENTS AND CONDITIONS - PREQUALIFICATION OF BIDDERS (REV 7-30-13) (1-14) | SP0020100 | All Maintenance Contracts |
PROPOSAL REQUIREMENTS AND CONDITIONS (BID FACTOR). (REV 3-4-14) (3-1-14) | SP0020302BFPB | Use on Maintenance Landscaping Bid Factor Push Button Projects with Two Year Establishment Period. Use with SS580000BFPB, SP0030100BFPB and SP0050100. Do not use with SS5800000 or SS5800000PB. |
AWARD AND EXECUTION OF CONTRACT (BID FACTOR). (REV 1-23-14) (3-14) | SP0030100BFPB | Use on Maintenance Landscaping Bid Factor Push Button Projects with Two Year Establishment Period. Use with SS580000BFPB, SP0020302BFPB and SP0050100. Do not use with SS5800000 or SS5800000PB. |
GENERAL REQUIREMENTS OF THE BOND. (REV 7-30-13) (1-14) | SP0030500 | Use on Multi-Year Maintenance Contracts. |
SCOPE OF THE WORK - INTENT OF CONTRACT. (REV 7-30-13) (7-14) | SP0040100 | All Maintenance Contracts. excluding Lump Sum. Do not use with SP0040100SLPQ. |
CONTROL OF THE WORK - WORK DOCUMENTS/LIQUIDATED DAMAGES. (REV 7-30-13) (1-14) | SP0050101 | Use on all Maintenance Contracts with Work Documents. |
PROSECUTION AND PROGRESS - SUBLETTING OR ASSIGNING OF CONTRACTS. (REV 3-10-14) (7-14) | SP0080100 | All Maintenance Contracts. |
PROSECUTION OF WORK - PARTNERING. (REV 7-30-13) (1-14) | SP0080300P | Use on Maintenance Contracts when Partnering is required. |
PROSECUTION OF WORK - MAINTENANCE DISPUTES REVIEW BOARD. (REV 8-3-13) (1-14) | SP0080307MDRB | Use on Maintenance Contracts when a Disputes Review Board is required. |
PROSECUTION AND PROGRESS - EQUIPMENT. (REV 3-10-14) (7-14) | SP0080410 | All Maintenance Contracts. |
PROSECUTION AND PROGRESS - RENEWAL OPTION. (REV 3-10-14) (7-14) | SP0081300R | Use on Maintenance Contracts with Renewal Option. |
MEASUREMENT AND PAYMENT SCOPE OF PAYMENTS. (REV 3-10-14) (7-14) | SP0090201M | All Maintenance Contracts. |
MOBILIZATION. (REV 7-30-13) (1-14) | SP1010201 | All Maintenance Contracts. |
MAINTENANCE OF TRAFFIC. (REV 7-19-13) (1-14) | SP1020301 | All Maintenance Contracts. |
ROADSIDE MOWING. (REV 3-11-14) (7-14) | SP1044007 | Maintenance Contracts with Roadside Mowing including Clipping Pick-up. |
CLEARING AND GRUBBING. (REV 8-1-13) (1-14) | SP1100200 | Maintenance Contracts with Clearing and Grubbing. |
INLETS, MANHOLES, AND JUNCTION BOXES. (REV 9-16-09) (1-14) | SP4250600 | Maintenance Contract with Drainage Structure Work. |
CONCRETE GUTTER, CURB ELEMENTS, AND TRAFFIC SEPARATOR. (REV 8-6-13) (1-14) | SP5200100 | Maintenance Contracts with Concrete Items. |
GUARDRAIL. (REV 8-19-13) (1-14) | SP5360100 | Maintenance Contracts with Guardrail Repair Work. |
FENCING. (REV 8-6-13) (1-14) | SP5500100 | Maintenance Contracts with Fencing Work. |
HIGHWAY SIGNING. (REV 8-20-13) (1-14) | SP7000106 | Maintenance Contract with Highway Signing Work. |
OBJECT MARKERS AND DELINEATORS. (REV 8-7-13) (1-14) | SP7050500 | Maintenance that include Object Markers and Delineators. |
RAISED RETRO-REFLECTIVE PAVEMENT MARKERS AND BITUMINOUS ADHESIVE. (REV 8-7-13) (1-14) | SP7060100 | Maintenance Contracts including Raised Retro-reflective Pavement Markers and Bituminous Adhesive. |
THERMOPLASTIC TRAFFIC STRIPES AND MARKINGS - HOT SPRAY. (REV 7-11-11) (1-13) | SP7110201 | Maintenance Contracts including Thermoplastic Traffic Stripes and Markings - Hot Spray. Use with SP9711100HS. |
TRAFFIC MARKING MATERIALS - THERMOPLASTIC MATERIAL - HOT SPRAY. (REV 4-13-10) (1-14) | SP9711100HS | Maintenance Contracts including Traffic Marking Materials - Thermoplastic Material - Hot Spray. Use with SP7110201. |
Supplemental Specifications | SS0000001 | All Jobs |
104-40 ROADSIDE MOWING. (REV 7-30-13) (1-14) | SS1044000 | Maintenance Contracts including Roadside Mowing. Do Not Use with SS1044000RC. |
106-22 EMERGENCY RESPONSE FOR DEBRIS REMOVAL. (REV 9-16-09) (1-14) | SS1062200 | Maintenance Contracts for the emergency removal and disposal of debris. |
110-30 ROADSIDE LITTER REMOVAL. (REV 8-1-13) (1-14) | SS1103000 | Maintenance Contracts including the removal and disposal of Roadside Litter. |
110-31 ROAD AND BRIDGE SWEEPING. (REV 8-1-13) (1-14) | SS1103100 | Maintenance Contracts including Road and Bridge Sweeping. |
110-32 EDGING AND SWEEPING. (REV 8-1-13) (1-14) | SS1103200 | Maintenance Contracts including Edging and Sweeping. |
110-70 REMOVAL OF FLEXIBLE PAVEMENT. (REV 8-1-13) (1-14) | SS1107000 | Maintenance Contracts including the Removal of Flexible Pavement. |
120-50 ROADSIDE DITCH OR CANAL CLEANING AND GRADING. (REV 8-2-13) (1-14) | SS1205000 | Maintenance Contracts including Roadside Ditch or Canal cleaning and Grading. |
430-94 DESILTING PIPES AND BOX CULVERTS. (REV 8-2-13) (1-14) | SS4309400 | Maintenance Contracts including Desilting Pipes and Box Culverts. |
522 CONCRETE SIDEWALK. (REV 8-6-13) (1-14) | SS5220000 | Maintenance Contracts including Concrete Sidewalk. |
544 CRASH CUSHIONS. (REV 8-6-13) (1-14) | SS5440000 | Maintenance Contracts including Crash Cushions. |
570-30 TURF MANAGEMENT (PERFORMANCE). (REV 8-6-13) (1-14) | SS5703000 | Maintenance Contracts including Turf Management (Performance). |
570-50 FERTILIZING. (REV 8-6-13) (1-14) | SS5705000 | Maintenance Contracts including Fertilizing. |
575 SODDING. (REV 12-28-09) (1-14) | SS5750000 | Maintenance Contracts including Sodding. |
580 LANDSCAPING (STAND ALONE). (REV 3-14-14) (4-14) | SS5800000 | Use on Maintenance Landscaping Stand Alone Projects with Two Year Establishment Period. Do not use with SS5800000BFPB or SS5800000PB. |
580BFPB LANDSCAPING (BID FACTOR). (REV 3-4-14) (3-14) | SS5800000BFPB | Use on Maintenance Landscaping Bid Factor Push Button Projects with Two Year Establishment Period. Use with SP0020302BFPB, SP0030100BFPB and SP0050100. Do not use with SS5800000 or SS5800000PB. |
580-33 CHEMICAL VEGETATION CONTROL. (REV 8-6-139) (1-14) | SS5803300 | Maintenance Contracts including Chemical Vegetation Control. |
580-40 TREE TRIMMING AND REMOVAL. (REV 8-6-13) (1-14) | SS5804000 | Maintenance Contracts including Tree Trimming and Removal. |
710-70 REMOVAL OF EXISTING PAINTED TRAFFIC STRIPES AND/OR MARKINGS. (REV 8-7-13) (1-14) | SS7107000 | Maintenance Contracts including the removal of Existing Painted Traffic Stripes and Markings. |
711-70 REMOVAL OF EXISTING THERMOPLASTIC TRAFFIC STRIPES AND/OR MARKINGS. (REV 8-7-13) (1-14) | SS7117000 | Maintenance Contracts including the removal of Existing Thermoplastic Traffic Stripes and Markings. |
715-50 HIGHWAY LIGHTING SYSTEM (PERFORMANCE). (REV 8-7-13) (1-14) | SS7155000 | Maintenance Contract including Highway Lighting Systems. |