DCE Memos - 2003


Construction Memos and Bulletins expire at the end of the calendar year in which they are issued, unless they are listed under the current memos.
DCE Memo's for 2003

Memo Number

Temporary Design Bulletin C03-13 Design Standard Index No. 521 & Structures Standard Index No. 870

36-03

Annotated Payrolls on Federal Payrolls (38kb)

35-03

Precast Concrete Pipe & Drainage Structures (63kb)

34-03

Granite Aggregate Supply Problems (118kb)

33-03

Construction Compliance with Specifications and Plans (81kb)

32-03

            Link to Email Document regarding the memo above: 
Quality Adjustments on Lump Sum (37kb)

31-03

K-Wall (80kb)

30-03

Correcting Asphalt Reports on Contractor Quality Control (CDC) Projects (73kb)

29-03

Contractor Quality Control
Implementation of The Unsoaked LBR Test
(72kb)

28-03

Use of Temporary and Permanent Retaining Wall Systems by Hilfiker Retaining Wall and T&B Structural Systems, Inc. (706kb)

27-03

Conflict of Interest (42kb)

26-03

Mandatory Post-Tensioning Enhancements (43 kb)

25-03

Guidance to Asphalt Verification Technicians (552kb)

24-03

Design-Build Contract Administration Issues (813 kb) Revised 8/13/03

23-03

           DCE Memo 23-03 Attachments (567 kb) 
Specifications 9-2.2.1 Terminology Clarification (289kb) Revised 9/4/03

22-03

Generic Permit for Storm water Discharge (275kb) 21-03 Attachment (1455kb)

21-03

Section 400 - Concrete Structures, Penetrant Sealers for Concrete Surfaces (35 kb)

20-03

New SA Codes for Claims Settlement Costs (70 kb)

19-03

Reflective Pavement Markers (90 kb)

18-03

2003 Outstanding Project Awards (66 kb)

17-03

Use of 4x8 in Compressive Strength Test Cylinders (39 kb)

16-03

Precast Concrete Pipe & Drainage Structures (120 kb)

15-03

Regional Dispute Review Board Payments (52kb)

14-03

Contract Changes on OJT Numbers (37.0 kb)

13-03

Procedure for Handling Asphalt Binders w/ Positive Spot Test (12kb)

12-03

As-Built Plans (860kb)

11-03

SDO Temporary Design Bulleting No. C0-03-01 (44kb)

10-03

Asphalt Binder for Design-Build Contracts (91kb)

09-03

Asphalt Binder Delivery Problems & Escalating Transportation Costs (29kb)

08-03

Multirotational Bearings (64 kb)

07-03

Acceptance of the Mixture at the Plant (39 kb)

06-03

Final Estimates Training Seminar for CEIs (34 kb)

05-03

Painting Pavement Markings (89.6 kb)

04-03

Section 200 Rock Base (39.5kb)

03-03

Color & Reflectivity of Work Zone Signs (46.2kb)

02-03

Compensation for Preformed Pile Holes (48.5kb)

01-03