DRB Recommendations - District 1


DateFIN#ContractSubjectA/R/P
8/21/2019602255201
19602255601
19602255602
E1R07SR 64 Roundabout at Rye RoadR
1/28/1819690425201T1576SR-70 Widening from E of NE 31st Ave to E of NE 80th AveR
1/22/1842271055201E1P91SR 45 (U.S. 41) FROM SALFORD BLVD. TO SUMTER BLVDR
11/14/17201221435201E1K75Design-Build I-4 at SR 559 INTERCHANGER
10/30/1720121435201E1K75Improvements to the I-4 at SR559 InterchangeP
     
6/24/1642913115201T1587SR45 (US41) from S. of Club Drive at Baywood Dr. and from Reynolds St. to Gulf Gate Dr.R
     
6/16/1619690425201T1576SR-70 Widening from E of NE 31st Ave to E of NE 80th Ave - Pile UnderrunA
     
1/19/1419576515201T1407SR 45/US 41 - Add Turn Lane Work Delay (Revisions #10/12)R
1/19/1419576515201T1407SR 45/US 41 - Add Turn Lane Work Delay (Plan Revision #11)R
1/19/1419576515201T1407SR 45/US 41 - Utility Delay (12" WM-DIP Removal)R
10/28/1319576515201T1407SR 45/US 41 - Submission of Falsework DrawingsR
     
3/26/1341381715201E1J12Highlands Bridge Painting - Added Compensation for Traffic Control Restrictions, Striping Coats & Site RestorationA
11/28/1242541415201T1472SR 789 (Longboat Pass Bridge Rehab) Bearing Repairs Issues & MOT ClaimA
10/26/1241970855201E1J62Scour Countermeasures (SR 789 & US 41) Rip Rap Rubble (Bank & Shore) IssueA
4/19/1219541015201E1H24SR 951(over Big Marco Pass) Soil Boring Issue at Pier 4A
1/2/1219770145201T1393SR 559 (over CSX RR) - Differing Subsurface Conditions for End Bent 4, Shaft No. 1A
9/18/1119770615201T1328SR 25/US 27 - Recovery of Idle Equipment & Mobilization CostsR
8/18/1141556915201T1173SR 72 - Additional Compensation for Temporary Concrete Barrier WallR
     
8/17/1141611915201E1G60Manatee County ATMS - Delay in Test Plan ReviewA
8/14/1141611915201E1G60Manatee County ATMS - Video Wall DamageA
8/12/1141611915201E1G60Manatee County ATMS - Hub #2 and Signal Equipment DamageA
     
2/3/1119573715201T1022SR 45 (US 41) - Additional Reimbursement for Extended Survey ControlR
10/26/1019573715201T1022SR 45 (US 41) - Entitlement Due to General Disruption CostsA
9/14/1019573715201T1022US 41 (SR 45) - Entitlement to Acceleration & Progress/bonus PaymentsP
2/22/0919573715201T1022US 41 (SR 45) - Entitlement to Extended Quality Control CostsA
1/6/0919573715201T1022SR 45 (US 41) - Additional Cost for Using Asphalt Base in Lieu of LimerockA
1/6/0919573715201T1022SR 45 (US 41) - Escalation of Asphalt Aggregate CostA
10/26/0819573715201T1022SR 45 (US 41) - Entitlement to Recovery of Liquidated DamagesR
10/12/0819573715201T1022SR 45 (US 41) - Extended Sidewalk to Pedestrian LightNA
10/12/0819573715201T1022SR 45 (US 41) - Additional Entitlement for Replacement of Light PoleR
10/12/0819573715201T1022SR 45 (US 41) - Additional Entitlement for Change to Fiber Optic CableR
10/12/0819573715201T1022SR 45 (US 41) - Changes to Luminaries (Clarification Request Included)A
8/21/0819573715201T1022SR 45 (US 41) - Truncated Domes Issue (Detectable Warnings on Walking Surfaces)R
8/21/0819573715201T1022SR 45 (US 41) - Bay Commons Drive IssueA
8/21/0819573715201T1022SR 45 (US 41) - Modification of Bridge Pedestrian LightsA
8/21/0819573715201T1022SR 45 (US 41) - Grouting at Spring Creek BridgeA
8/21/0819573715201T1022SR 45 (US 41) - Utility Conflict at S-533A
7/18/0819573715201T1022SR 45 (US 41) - WO 14, Modify S-128 ImpactsR
7/18/0819573715201T1022SR 45 (US 41) - Modification of Riser at S-291A
7/18/0819573715201T1022SR 45 (US 41) - Water Use Permit DelayR
7/18/0819573715201T1022SR 45 (US 41) - Adjustment of S-536A StructureR
7/18/0819573715201T1022SR 45 (US 41) - RCS/BSU Conflict at Station 125+62 Rt. RdwyA
7/18/0819573715201T1022SR 45 (US 41) - Sprint Conflict Station 128+00 Rt. RdwyA
7/18/0819573715201T1022SR 45 (US 41) - Force Main Conflict at Station 125+50 RtA
7/18/0819573715201T1022SR 45 (US 41) - Gas Main Conflict at Station 117+75 RTA
7/9/0819573715201T1022SR 45 (US 41) - Changed Site Conditions Related to Pipe Work Between Station 125 to 128P
6/30/0819573715201T1022US 41 (SR 45) - Differing Site Conditions for Existing Water & Sanitary Sewer Force MainsA
6/25/0819573715201T1022SR 45 (US 41) - Sprint Delay at S-542A
6/25/0819573715201T1022SR 45 (US 41) - Gas Main ConflictA
6/25/0819573715201T1022SR 45 (US 41) - Temporary Sheet PileA
6/25/0819573715201T1022SR 45 (US 41) - Removal/Replacement of Bridge Deck on Imperial River BridgeA
6/25/0819573715201T1022SR 45 (US 41) - Stop Work Order Due to Gas Main IssueA
6/25/0819573715201T1022SR 45 (US 41) - Coast Guard Permit IssueP
     
12/15/1041473315201E1E73I-75 RTMC & ITS Project - Delay Due to Additional Fire InspectionsA
12/2/1041473315201E1E73I-75 RTMC & ITS Project - Additional Time & Compensation to Replace Rejected Pull BoxesA
11/13/1041473315201E1E73I-75 RTMC & ITS Project - Change to Power Drop from Overhead to UndergroundP
11/6/1041473315201E1E73I-75 RTMC & ITS Project - Drainage Problems at RTMC Building SiteA
11/6/1041473315201E1E73I-75 RTMC & ITS Project - Damage to CCTV Cabinets (#31 & #34)A
10/19/1041473315201E1E73I-75 RTMC & ITS Integration Project - Time Extension & Compensation for Damage Caused by Failure to Retrofit Beacon #134A
10/16/1041473315201E1E73I-75 RTMC & ITS Integration Project - Time Extension & Compensation for Damage to Fiber Optic CablingA
11/24/0941473315201E1E73I-75 RTMC & ITS Integration Project - Additional Time for Extra Work Assigned Under Unilateral SA # 14A
11/24/0941473315201E1E73I-75 RTMC & ITS Integration Project - Additional Time & Compensation for Mitigation of Acoustical Problems in the Control RoomP
10/27/0941473315201E1E73I-75 RTMC & ITS Integration Project - Additional Time & Compensation for Damage to Fiber Optic LineA
10/26/0941473315201E1E73I-75 RTMC & ITS Integration Project - Furnish Test Equipment for Multi-Mode FiberA
9/28/0941473315201E1E73I-75 RTMC & ITS Integration Project - Entitlement Due to RTMC Building Size Larger than Required by RFPA
8/27/0941473315201E1E73I-75 RTMC & ITS Integration Project - Added Time & Compensation; Sign Support Manufacturer Going Out of BusinessA
3/10/0941473315201E1E73I-75 RTMC & ITS Integration Project, Supplemental Agreement CalculationR
2/16/0941473315201E1E73I-75 RTMC & ITS Integration Project, Fishel Sod IssueR
1/31/0941473315201E1E73I-75 RTMC & I-75 Corridor FMS & ITS Integration Project - Substantial CompletionR
8/6/0841473315201E1E73I-75 FMS & ITS Integration Project, Extended Cable TV ServiceR
1/1/0841473315201E1E73I-75 RTMC & ITS Project - Water Heaters (Department Credit for Cost Gas Lines)A
1/1/0841473315201E1E73I-75 Escalation CostsA
6/18/0741473315201E1E73I-75 Collier County ITS - Connection Fee CompensationA
     
11/14/1042240315201T1341SR70 - Time Extension Due to Shortage of Thermoplastic MaterialA
9/8/1019786225201T1317SR 758 (Bridge Over Grand Canal) - Repairs to Existing Timber Pedestrian WalkwayA
     
12/8/0919570515201T1078SR 78 - Additional Compensation & Time for Extra Work for Repairs to Storm Sewer PipeP
7/21/0719570515201T1078SR 78 - Laser Profiling & Damage to Drain PipesA
     
10/20/0942061315201E1G79I-75 at Fruitville Rd. - Design & Reconstruction of Roadway Lighting Power DistributionR
4/24/0940818525201T1242SR 64 (Anna Maria Bridge) - Additional Compensation for Hopkins Frames & Structural SteelA
1/13/0941284815201E1F04I-75 Jacaranda - Compensation for Drainage ImprovementsA
10/15/0841981115201E1F89SR 31 (Arcadia Rd.) & SR 78 (Bayshore Rd.) Special Design Mast Arm: Drilled Shaft IssuesA
6/25/0841764625201T1256CR 664A - Bridge Repair (Bridge # 060017, #060031)A
2/28/0819575625201T1082SR 78 - Additional Compensation & TimeR
2/28/0819808765201E1F66SR 700 (Bridge # 130057) - Replace Existing Fender SystemP
12/26/0719767915201T1064SR 25 (US 27) - Asphalt Price AdjustmentA
     
12/2/0719409315201T1009US 17 - Unforeseen Work at Bill's Muffler ShopA
11/20/0719409315201T1009US 17 - Unforeseen Work at Truncated DomesA
11/20/0719409315201T1009US 17 - Debris Removal at Pond 400BA
11/20/0719409315201T1009US 17 - Pavement Marking RemovalA
11/20/0719409315201T1009US 17 - Driveway at English ChevroletA
11/20/0719409315201T1009US 17 - Fence Repairs at Ponds 400B and 500A
10/14/0719409315201T1009US 17 - Additional Work for MES, Weir S-6 & Rubble Slope at TownsendR
10/14/0719409315201T1009US 17 - Additional Work at Stenstrom RoadR
10/14/0719409315201T1009US 17 - Additional Work for Removal of Grass & WeedsA
10/14/0719409315201T1009US 17 - Additional Unforeseen Work for Pond 800 DrivewayA
10/14/0719409315201T1009US 17 - Additional Unforeseen Work for MowingA
9/16/0719409315201T1009US 17 - Compensable Days for Pipe Repair & Use of Laser VideoP
7/26/0719409315201T1009US 17 - Unforeseen Work at KOAR
7/14/0719409315201T1009US 17 - Repair Driveways & Sidewalks, Additional CompensationR
7/14/0719409315201T1009US 17 - Compensable Days for Arch Culvert WorkR
     
8/24/0719612115201T1089SR 70 - Payment for Intersection WorkA
     
11/27/062012131520121403I-4/US98 Interchange - Temporary Pavement Failure (West Bound Detour)A
11/27/062012131520121403I-4/US98 Interchange - Limerock Base Failure (Ramp A)A
11/27/062012131520121403I-4/US98 Interchange - Concrete Pavement GrindingA
12/3/032012131520121403I-4/US 98 Interchange - Glare Screen PaymentA
1/31/032012131520121403I-4/US98 Interchange - High Mast Lighting FoundationsA
     
9/19/0640389015201T1027US 27 Delays and Extra WorkP
6/21/0540389015201T1027US 27 Extra Depth Asphalt A
     
2/12/0619540615201T1012US 41 (SR 45) Installation of Storm Drainage SystemA
     
1/15/061973951520121580SR 60 Multiple Utilities ImpactA
1/15/061973951520121580SR 60 Additional Sod PaymentA
7/26/041973951520121580SR 60 Fuel AdjustmentsA
     
12/20/0520096615201T1108I-75 & Alico Rd. Interchange-Water Use Permit ResponsibilityR
11/15/041970271520121690SR 60A (US 98) Emergency Repair to Existing Sanitary SewerA
7/26/041971681520121541SR60A - MSE Wall Sidewalk PaymentA
11/15/031940081520121318SR-78(Dike Rd to Okeechobee Co) Additional Time (Guardrail Installation Related)A
     
12/27/031980051520120934SR45 (US 41 Business) Discharge of SuperintendentR
1/11/021980051520120934SR 45 (US 41 Business) Temporary Signal Payment A
     
1/7/031937941520120757SR-776(CR-771 to Riverwood) Noxious Weed Removal CompensationR
8/13/021937941520120757SR-776 - Pay for Restrained PipeA
     
8/19/021975291520120496SR 555/ US 17 - Golden Eagle - Contract Time IssueA
     
8/15/001953201520120228SR 951 - Utility Conflict - Subaqueous Waterline Obstruction (Quantum Hearing)A
8/12/001953201520120228SR 951 - Indirect Costs - Concrete Sheet Piling InstallationA
1/24/001953201520120228SR 951 - Site Conditions - Failure to Remove Water Main (McIlvane Bay Bridge)A
12/20/991953201520120228SR 951 - Changed Site Conditions - Utilities - Subaqueous Waterline ObstructionA
     
   A = Accepted, P = Partial Acceptance, R = Rejected