2414 search results for fla

2025FDM943Lighting

of construction such that the stationing is increasing from left to right. Flag and station the begin

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/roadway/fdm/2025/review/2025fdm943lighting.pdf?sfvrsn=867a7faa_1

2025FDM912ProjCntrl

#625-000-002 FDOT Design Manual 912 - Project Control (2) Flag and label the beginning and ending

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/roadway/fdm/2025/2025fdm912projcntrl.pdf?sfvrsn=382b7681_1

2025FDM943Lighting

such that the stationing is increasing from left to right. Flag and station the begin and end

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/roadway/fdm/2025/2025fdm943lighting.pdf?sfvrsn=77c9e7fe_1

2025FDM940SandPM

or baseline of construction such that the stationing is increasing from left to right. Flag and station

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/roadway/fdm/2025/2025fdm940sandpm.pdf?sfvrsn=fbe7ed27_2

20240701_210265-9_SRA1A_78040

Geo, Inc. 07/01/24 Page Mainline Inside: N/A State Road No.: SR A1A Flagler C/L Shoulder: Project, and Condition Data Cored By: CSI Geo, Inc. 07/01/24 Page Inside: N/A State Road No.: SR A1A Flagler C, Data Cored By: CSI Geo, Inc. 07/01/24 Page N/A State Road No.: SR A1A From: Flagler C/L Shoulder

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/materials/pavement/coringdata/d2/78/20240701_210265-9_sra1a_78040.pdf?sfvrsn=3f392ba7_1

2024nov-thu02-10-YearsFRP-RCx

(D6) • South Maydell Dr over Palm River (D7) • SR-A1A Flagler Beach Seawall (Segment 3) (D5, ) • D4: SR 5/US 1 Over Earman River (442891-1) – In-house Design. • D5: SR-A1A Seawalls - Flagler, Construction: D5 Example Projects • SR-A1A Seawalls - Flagler Beach & Nth Vo l u s i a Co. (452443-1

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/design/training/transportationsymposium/2024-november/2024nov-thu02-10-yearsfrp-rcx.pdf?sfvrsn=4d6a067_1

2024nov-thu02-10-YearsFRP-RCx

(D6) • South Maydell Dr over Palm River (D7) • SR-A1A Flagler Beach Seawall (Segment 3) (D5, ) • D4: SR 5/US 1 Over Earman River (442891-1) – In-house Design. • D5: SR-A1A Seawalls - Flagler, Construction: D5 Example Projects • SR-A1A Seawalls - Flagler Beach & Nth Vo l u s i a Co. (452443-1

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/design/training/transportationsymposium/2024-june/2024nov-thu02-10-yearsfrp-rcx.pdf?sfvrsn=1a3d6b20_1

E59C0BidTabs

Order: Letting: District: 002 Contract Desc: BREVARD, DIST/ST- WIDE, FLAGLER, LAKE, MARION, Financial Project No.: 444100-1-72-16 Fiscal Year: 2025 Counties: Districtwide (Volusia, Flagler, Brevard, CALENDAR DAYS Project(s): BREVARD, DIST/ST- WIDE, FLAGLER, LAKE, MARION, ORANGE, OSCEOLA, SEMINOLE

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/contracts/d5/bid-tabs/2025/jan07/e59c0bidtabs.pdf?sfvrsn=d9bc9616_1

D1-11-07-2024BSN

ASSEM SRT-350/8 (REPL GUARDRAIL BEAM) EA 2.000 E536-322-501 END ANCHOR ASSEM FLARED (REPL FLARED END SECT) EA 2.000 E536-322-502 END ANCHOR ASSEM FLARED (REPL ROUND END SECT) EA 2.000 E536-322-503 END ANCHOR ASSEM FLARED (REPL BUFFER END SECT) EA 2.000 E536-322-506 END ANCHOR ASSEM FLARED (REPL

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/contracts/d1/lettings/2024/nov07/d1-11-07-2024bsn.pdf?sfvrsn=53a79e61_1

D1-01-16-25BSN

-FLARED APPROACH TERMINAL, REPLACE, NCHRP 350 EA 5.000 E536- 6-424 END ANCHORAGE ASSEM (REPLACE, ASSEM SRT-350/8 (REPL GUARDRAIL BEAM) EA 2.000 E536-322-501 END ANCHOR ASSEM FLARED (REPL FLARED END SECT) EA 2.000 E536-322-502 END ANCHOR ASSEM FLARED (REPL ROUND END SECT) EA 2.000 E536-322-503 END ANCHOR ASSEM FLARED (REPL BUFFER END SECT) EA 2.000 E544- 76- 2 CRASH CUSHION (CLEAN & INSPECT) EA

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/contracts/d1/lettings/2025/jan16/d1-01-16-25bsn.pdf?sfvrsn=c1ef144a_1

Chapter11s4Redline

flags a CPF less than 0.90 as a Materials Certification (MC) Review finding, and a Material, is flagged as a Pay Reduction per Specification finding in MAC. It and is not considered an Exception

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/construction/manuals/cpam/newhistory/chapter11s4redline.pdf?sfvrsn=b134dd7b_3

Chapter11s4

) System flags a CPF less than 0.90 as a Materials Certification (MC) Review finding, and a Material, to 0.80 is flagged as a Pay Reduction per Specification finding in MAC. It is not considered

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/construction/manuals/cpam/newcleanchapters/chapter11s4.pdf?sfvrsn=7c03da58_9
20 of 2414 results