2314 search results for apl

4570000.origind

involve APL changes? Yes No Product Evaluation staff contacted (name): W i l l t h e p r o posed, . ThechangesareproposedbyIvanLassaoftheStateMaterialsOfficetoincludecolumns intheapplicationofthisrepairmethod, update references to approved APL, with the compressible seal and an APL approvedlisted epoxy mastic suitable for underwater, ports flush with the surface of the jacket and seal opening with an APL approvedlisted epoxy

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/by-year/2016/july-2016/review/internal/4570000.origind.pdf?sfvrsn=f9b2d81b_0

4100200.FHWA

Approved Product List (APL). SUBARTICLE 410-4.1.1 is deleted and the following substituted, system (steel reinforcing only) listed on the Department’s Approved Product List (APL) for securing, -cast concrete. ** Use products listed on the Department’s Approved Product List (APL). SUBARTICLE, on the Department’s Approved Product List (APL) for securing reinforcing dowels for headwalls, toe walls

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/by-year/2016/july-2016/review/fhwa/4100200.fhwa.pdf?sfvrsn=15d740c3_0

5480100.impl

 548 RETAININGWALLSYSTEMS. (REV10-14-15)(FA1-11-16)(7-16) ARTICLE548-1isdeletedandthefollowingsubstituted: 548-1Description. Constructpermanent and temporary retaining wall systems in accordance with this Section and in conformance with the lines, grades, design, and dimensions shown in the Contract or established by the Engineer. Unless otherwise noted in the Plans, provide a wall system listed on the Department’s Approved Product List (APL) based on the Department’s Wall Type shown

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/by-year/2016/july-2016/review/implemented/5480100.impl.pdf?sfvrsn=2baf4d2f_0

1020302.impl

) or the Department’s Approved Products List (APL). Erect the required temporary traffic control devices, that are on the QPL or the APL. Immediately remove or cover any devices that do not apply to existing conditions, of Category IV devices for inclusion on the QPL or APL must comply with the requirements of Section 990, for proper application, field assembly and installation. The QPL or APL number is to be permanently

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/by-year/2015/january-2015/review/implemented/1020302.impl.pdf?sfvrsn=22bcc54c_0

Specrev2-July14

on the Department’s Qualified Products List (QPL) or the Department’s Approved Products List (APL). Erect, the work area. Use only those devices that are on the QPL or the APL. Immediately remove or cover any, on the QPL or APL must comply with the requirements of Section 990 and include detailed vendor, assembly and installation. The QPL or APL number is to be permanently marked on the device at a readily

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/by-year/2015/january-2015/review/comments-responses/specrev2-july14.pdf?sfvrsn=8f613a64_0

Program Management

List (APL), which is a published list of products that have been evaluated against implemented FDOT

https://www.fdot.gov/programmanagement/programmanagement
20 of 2314 results