3398 search results for REPORT NUMBER

20230315_CTD_Business_Meeting_Agenda

the meeting (Microsoft Teams) Conference Call-In Number: 850-739-5589 Conference Code: 613 925 919# Item, Information Items VII. Update of Annual Operating Report (AOR) Study Commissioner Renee Knight Casey Perkins, Director Report David Darm XI. Commissioner and Advisor Reports Commissioners and Advisors XII, will hold a public workshop at 1:30pm until completion with the same virtual link and phone number

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/ctd/docs/meetingpackages/2023meetings/20230315_ctd_business_meeting_agenda.pdf?sfvrsn=f866d6fa_1

ProductionPSEChecklist

rates, project lengths, and EOR name/firm/phone number are accurate. o Under “Special Notes, project number used (i.e. Phase 31 or 32) ❑ PS&E Submittal Documents – Plans, Specs Package, Estimates Quantities Report, CADD files, and Technical Special Provisions o For Consultant projects, Edit Report, and Approved, Signed and Sealed Modified Special Provisions Acceptance of the Production

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/designsupport/districts/d5/files/specs/specphase/productionpsechecklist.pdf?sfvrsn=8bc76452_1

Final Estimates Forms

the applicable project specific information (Contract Number, Project Number(s), Contractor, etc, Estimate Site Source Records 700-050-53 Final Measurements 700-050-54 Daily Report of Truck - Measured, 11.4. Users can enter information from Form 675-030-20A, Asphalt Roadway – Daily Report of Quality

https://www.fdot.gov/construction/finalestimates/fedocs.shtm

1080201.impl

of the structures: one report before beginning the construction operations that may affect, , dewatering and retaining wall construction, and a second report after completing, the Engineer’s approval for the number and location of monitoring points. Survey and monitor, of detecting velocities of 0.01 inches per second or less. Obtain the Engineer’s approval of the number

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/by-year/2016/july-2016/review/implemented/1080201.impl.pdf?sfvrsn=8293c494_0

PD&E Manual 2024_FINAL_073124

. 1.5 BACKGROUND On November 21, 1991, the Secretary of FDOT approved Procedure Number 650-000, Environmental Impact Report as the basis of their NEPA document) is required to support the permit, . Require the relocation of significant numbers of people; c. Have a significant impact on any natural, Programming Screen Summary Report documents the COA determination and type of environmental analyses needed, of significant numbers of people; 4. Do not have a significant impact on any natural, cultural, recreational

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/environment/pubs/pdeman/2024/pd-e-manual-2024_final_073124.pdf?sfvrsn=746c6ea6_1

Systemic Safety Analysis - Technical Memorandum

is the crash tree diagram that shows the number of crash incidents based on the user selection, the crash tree diagram for this analysis include:  Number of Legs: This analysis considers, number of through lanes (including shared lanes) on major road, taken as the higher of the number of lanes between two major road approaches.  Minor # of Lanes: The total number of through lanes (including shared lanes) on minor road, taken as the higher of the number of lanes between two minor

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/traffic/trafficservices/strides2zero/systemic-safety-analysis---technical-memorandum.pdf?sfvrsn=60fb6fa_1

275-010-001-8.14

title(s), address(es), and telephone number(s) of the complainant(s) as well as their assigned unit, ), and telephone number(s) of the person(s) alleged to have committed unlawful employment practice(s, avenues of recourse and the addresses and phone numbers of the EEOC and FCHR (see below); Equal, during the course of the investigation. 1.6.2 Investigative Report The Purpose of the Investigative Report is to present the specific, relevant allegations in the complaint, review facts including

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/equalopporunity/275-010-001-8-14.pdf?sfvrsn=f8e7aae2_1

SPI-102-655

and assistance the preparation of the Traffic Pacing Report. The program is located the Department’s, . Assume the following number of traffic control officers for each location and function in the table, . Specify the activities, locations, and times when pacing will be allowed. Show the minimum number, anticipated during the pacing operation. Show the number and location of portable changeable message, may use the avoid the operation. Payment Item number Item Description Unit Measure 102- 14

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/design/standardplans/2025/spi/spi-102-655.pdf?sfvrsn=8cfc4fa2_2

SPI-102-655

and assistance the preparation of the Traffic Pacing Report. The program is located the Department’s, . Assume the following number of traffic control officers for each location and function in the table, . Specify the activities, locations, and times when pacing will be allowed. Show the minimum number, anticipated during the pacing operation. Show the number and location of portable changeable message, may use the avoid the operation. Payment Item number Item Description Unit Measure 102- 14

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/design/standardplans/2026/spi/spi-102-655.pdf?sfvrsn=7b2d8078_1

E8V66Addenda003

- 3 for details* Digitally signed + sealed Estimate & Quantities Report for Utility Work (44276425602, 442764-2-52-01 N/A CATEGORY CATEGORY NUMBER PAY ITEM ADD MOD DEL OLD QUANTITY NEW QUANTITY PAY ITEMS + QUANTITIES (AASHTOWare PrP) FPID 442764-2-56-01 N/A CATEGORY CATEGORY NUMBER PAY ITEM, 442764-2-56-02 CATEGORY CATEGORY NUMBER PAY ITEM ADD MOD DEL OLD QUANTITY NEW QUANTITY Utilities, /A CATEGORY CATEGORY NUMBER PAY ITEM ADD MOD DEL OLD QUANTITY NEW QUANTITY SUPPLEMENTAL

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/contracts/tp/lettings/2025/apr25/e8v66addenda003.pdf?sfvrsn=985700c_1

2024FDM940SandPM

#625-000-002 FDOT Design Manual 940 - Signing and Pavement Marking Plans (10) Report of Core Borings, . Information on how quantities are determined are contained in the Estimated Quantities (EQ) Report, sign face the station (or mile post), pay item number, sign size, standard designation, or assigned number (if nonstandard). In addition, provide sign placement (offset) when installation may, (or mile post), disposition (remain, relocate, or remove), and pay item number. (4) Display and label

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/roadway/fdm/review/2024fdm940sandpm.pdf?sfvrsn=36f8d8f2_1

2024FDM940SandPM

, 2024 1 Topic #625-000-002 FDOT Design Manual 940 - Signing and Pavement Marking Plans (10) Report, Quantities (EQ) Report and should not be repeated in the plans as a Pay Item Note. Pay item notes, along the roadway. Indicate next to each sign face the station (or mile post), pay item number, sign size, standard designation, or assigned number (if nonstandard). In addition, provide sign placement, item number. (4) Display and label permanent pavement markings specifying width, color

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/roadway/fdm/2024/2024fdm940sandpm.pdf?sfvrsn=82a147f6_1

2025FDM940SandPM

and Pavement Marking Plans (10) Report of Core Borings S&PM Plans may require insertion of sheets that were, in the Estimated Quantities (EQ) Report and should not be repeated in the plans as a pay item note. Pay, number, sign size, standard designation, or assigned number (if nonstandard). In addition, provide, , or remove), and pay item number. (4) Display and label permanent pavement markings specifying width, the following with the label (or in a summary table): (a) Vvh number (b) Utility type and owner (c

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/roadway/fdm/2025/review/2025fdm940sandpm.pdf?sfvrsn=c69045d6_1

Pt2Ch2-073124_clean

..................................................................... 2-25 2.2.10 Project Traffic Analysis Report, ............................................... 2-26 2.2.10.2 Project Traffic Analysis Report Outline, OF FIGURES Figure 2-1 Sample Project Traffic Analysis Report Cover Page, year, divided by the number of days in the year. Average Daily Traffic (ADT) - The total traffic, by the number of days in that period. Axle Correction Factor - The factor developed to adjust axle

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/environment/pubs/pdeman/2024/pt2ch2-073124_clean.pdf?sfvrsn=3928b019_1

Webinar 3 Lane Repurposing 02.11.2025

Methodology, Type of Analysis, Concept Report COMMUNITY ENGAGEMENT Requirements and best practices, roadway spaces by reducing the number of through movement traffic lanes and allocating the space, Applicant Lane Repurposing Guidebook Introduction Lane Repurposing Concept Report Community Engagement, 29 Overview Concept Report Documentation • Existing Conditions • Proposed Conditions, Streets initiatives 51 Safety Analysis MOEs FATALITIES AND INJURIES • Number of fatalities

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/planning/systems/systems-management/training/access-management/sam-and-tsi-webinar-series/sam-and-tsi-2024-25/02-11-2025_webinar-3_lane-repurposing-guidebook_presentation_2025.pdf?sfvrsn=eafcc15e_5

Enterprise Business Glossary

, number and spacing of connections, median openings and traffic signals on the highway system, amounts on the basis of a year of twelve 30-day months. (Note: Words importing singular number shall include the plural number, and vice versa, and words importing persons shall include firms, divided by the total number of vehicles counted (AASHTO). Acquired The time at which the Department, home” is used. Right of Way Acquisition Period or Procurement Time A number of calendar days

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/data/enterprise-business-glossary.pdf?sfvrsn=3491cf48_3

Configuration Management Plan

............................Software Problem Report SRR . . . . . . . . . . . . . . . . . . . . . . . . . . . . S o f t w a r e R, number BDQ69, addresses the necessity of supporting, maintaining and performing enhancement, is associated, or a revision of the document where x refers to a LOA number and y.z.w refer, in Hotfix or Patch Releases. For each numbered release, a snapshot of the code is taken to ensure, the requirements in the SRS are implemented. 2. A Functional Configuration Audit report is developed which

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/traffic/cmtp/sunguide/projectmanagement/configuration-management-plan.pdf?sfvrsn=f3123033_1

2021 SB Methodology

– National Accessibility Evaluation Florida Report Safety-Related Mobility Measures Number, – Traffic Crash Facts Annual Report Number of Serious Injuries Number of disabling/incapacitating, Report Motorcycle Fatalities and Serious Injuries These safety measures capture the number, Methodologies for THE FDOT SOURCE BOOK A Technical Report - 2021 produced by Florida, THE FDOT SOURCE BOOK A Technical Report - 2021 Table of Contents 1.0 Executive Summary 1 2.0

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/planning/trends/2021sbmethod.docx?sfvrsn=59aadeb4_18

fdot-bdv25-977-76-rpt

crash numbers at commercial driveways at a 5% significance level (p=0.05): Number of Lanes,  CUTR-2022-12 Crashes Related to Type and Location of Driveway Access Final Report Prepared By USF Center for Urban Transportation Research December 2022 Project Number FDOT BDV25-977-76, -Jelinska Tia Boyd Disclaimer The contents of this report reflect the views of the authors, who, (F-32)/9 or (F-32)/1.8 Celsius o C iv Technical Report Documentation 1. Report No. 2

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/research/reports/fdot-bdv25-977-76-rpt.pdf?sfvrsn=101903a0_1

3460200.origind

into the project. Take these acceptance samples randomly as determined by a random number generator, identified as outlined in the Sample/Lot Numbering System instructions located on the State Materials, , obtain and test the cores and report the data to the Engineer within 14 calendar days of the 28 day

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/by-year/2016/january-2016/review/internal/3460200.origind.pdf?sfvrsn=105eae11_0
20 of 3398 results