834 search results for fencing

SS5500301

 550 FENCING (REV 5-14-10) (FA 7-20-10) (1-11) SUBARTICLE 550-3.1 (Page 690) is deleted and the following substituted: 550-3.1 Type A Fence (Farm Fence): Meet the requirements of Section 954 for timber posts and braces. For metal posts and braces, and for recycled plastic fence posts, meet the requirements of the Design Standards. For the fabric and all other accessories, meet the requirements of the Design Standards

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/by-year/2012/january-2012/workbook/ss5500301.pdf?sfvrsn=4382be4_0

E21N7BidTabs

(EMERGENCY FENCE REPAIR (LF SECTION: 0005 0550 10110 FENCING, TYPE A, 0.0-5.0', STANDARD 52,100.000 LF 8.25000 429,825.00 0010 0550 10118 FENCING, TYPE A, 0.0-5.0', TYPE A STANDARD, RESET EXISTING 3,000.000 LF 4.50000 13,500.00 0015 0550 10148 FENCING, TYPE A, 7.1-8.0', RESET EXISTING 3,000.000 LF 25.00000 75,000.00 0020 0550 10149 FENCING, TYPE A, 7.1-8.0', SPECIAL FEATURES 3,770.000 LF 60.00000 226,200.00 0025 0550 10220 FENCING, TYPE B, 5.1-6.0', STANDARD 250.000 LF

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/contracts/d2/bid-tabs/2024/may08/e21n7bidtabs.pdf?sfvrsn=2b22c9d2_1

SPM5500100-725-i19900

 FENCING. (REV 12-16-24) (FY 2025-26) ARTICLE 550-1 is deleted and the following substituted:: Maintain, construct, replace, repair, and remove fencing and gates at locations specified, and reset metal fence. Repair or replace damaged or deteriorated fencing, including posts, fencing fabric, to be performed may include the removal of public or private attachments to existing fencing, or repairing fencing, perform the work in a manner to maintain security of adjacent property. Install

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/by-year/fy-2025-26/maintenance/finalized/spm5500100-725-i19900.pdf?sfvrsn=4d37b435_1

SPM5500100cln

 FENCING. (REV 12-16-24) (FY 2025-26) ARTICLE 550-1 is deleted and the following substituted:: Maintain, construct, replace, repair, and remove fencing and gates at locations specified, and reset metal fence. Repair or replace damaged or deteriorated fencing, including posts, fencing fabric, to be performed may include the removal of public or private attachments to existing fencing, or repairing fencing, perform the work in a manner to maintain security of adjacent property. Install

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/by-year/fy-2025-26/maintenance/implemented/spm5500100cln.pdf?sfvrsn=2c772fe1_1

E1X33-R0

: Fencing Limits: Midpoint Project(s): 43272927217(*) Federal Aid No: N/A Total Roadway Length, under this Contract consists of Fencing. Call Order: 009 Proposal: E1X33-R0 ALT Item Description Unit Quantity Section 0001 FENCE REPAIR (LF) 0550- 10-221 FENCING, TYPE B, 5.1-6.0', W/ BARB WIRE ATTMT LF 350.000 0550- 10-222 FENCING, TYPE B, 5.1-6.0, W/ VINYL COATING LF 850.000 0550- 10-228 FENCING, TYPE B, 5.1-6.0, RESET EXISTING LF 500.000 0550- 15- 22 FENCE REPAIR, TYPE B, LINE POST

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/contracts/d1/lettings/2024/aug15/e1x33-r0.pdf?sfvrsn=28f1dde8_1

E6P70-R0

Description Unit Quantity Section 0001 FENCE REPAIR (LF) 0550- 10-110 FENCING, TYPE A, 0.0-5.0', STANDARD LF 50.000 0550- 10-118 FENCING, TYPE A, 0.0-5.0', TYPE A STANDARD, RESET EXISTING LF 20.000 0550- 10-120 FENCING, TYPE A, 5.1-6.0, STANDARD LF 50.000 0550- 10-220 FENCING, TYPE B, 5.1-6.0', STANDARD LF 2,500.000 0550- 10-221 FENCING, TYPE B, 5.1-6.0', W/ BARB WIRE ATTMT LF 500.000 0550- 10-222 FENCING, TYPE B, 5.1-6.0, W/ VINYL COATING LF 5.000 0550- 10-335 FENCING, TYPE R, 6.1-7.0

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/contracts/d6/lettings/2025/apr24/e6p70-r0.pdf?sfvrsn=247664e6_1

SPM5500100-724-i19211

 FENCING. (REV 3-9-18) (FY 2024-25) ARTICLE 550-1 is expanded by the following: Remove, to existing fencing, fence maintenance, furnishing of materials, replacement or mending of wire fabric, and the following substituted: 550-6 Basis of Payment. 550-6.1 Basic Items of Fencing: The Contract unit price per foot for the item of fencing, will be full compensation for all work and materials, lengths of posts ordered by the Engineer. 6. Any cost of erection and removal of any temporary fencing

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/by-year/fy-2024-25/maintenance/finalized/spm5500100-724-i19211.pdf?sfvrsn=cd2238f3_1

SPM5500100-723-i18589

 FENCING. (REV 3-9-18) (FY 2023-24) ARTICLE 550-1 is expanded by the following: Remove, to existing fencing, fence maintenance, furnishing of materials, replacement or mending of wire fabric, and the following substituted: 550-6 Basis of Payment. 550-6.1 Basic Items of Fencing: The Contract unit price per foot for the item of fencing, will be full compensation for all work and materials necessary, of posts ordered by the Engineer. 6. Any cost of erection and removal of any temporary fencing, which

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/by-year/fy-2023-24/maintenance/finalized/spm5500100-723-i18589.pdf?sfvrsn=817c8c6_2

SPM5500100-122

 FENCING. (REV 3-9-18) (1-22) ARTICLE 550-1 is expanded by the following: Remove and replace, fencing, fence maintenance, furnishing of materials, replacement or mending of wire fabric, barbed, substituted: 550-6 Basis of Payment. 550-6.1 Basic Items of Fencing: The Contract unit price per foot for the item of fencing, will be full compensation for all work and materials necessary, ordered by the Engineer. 6. Any cost of erection and removal of any temporary fencing, which may

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/by-year/2022/january-2022/maintenance/finalized/spm5500100-122.pdf?sfvrsn=9f37966c_2

SPM5500100-722-i17960

 FENCING. (REV 3-9-18) (7-22) ARTICLE 550-1 is expanded by the following: Remove and replace, fencing, fence maintenance, furnishing of materials, replacement or mending of wire fabric, barbed, substituted: 550-6 Basis of Payment. 550-6.1 Basic Items of Fencing: The Contract unit price per foot for the item of fencing, will be full compensation for all work and materials necessary, ordered by the Engineer. 6. Any cost of erection and removal of any temporary fencing, which may

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/by-year/2022/july-2022/maintenance/finalized/spm5500100-722-i17960.pdf?sfvrsn=6544cc82_2

SPM5500100-721

 FENCING. (REV 3-9-18) (7-21) ARTICLE 550-1 is expanded by the following: Remove and replace, fencing, fence maintenance, furnishing of materials, replacement or mending of wire fabric, barbed, substituted: 550-6 Basis of Payment. 550-6.1 Basic Items of Fencing: The Contract unit price per foot for the item of fencing, will be full compensation for all work and materials necessary, ordered by the Engineer. 6. Any cost of erection and removal of any temporary fencing, which may

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/by-year/2021/july-2021/maintenance/finalized/spm5500100-721.pdf?sfvrsn=f4c1ec3c_2

SP5500100-i16440

FENCING. (REV 3-9-18) (1-21) ARTICLE 550-1 is expanded by the following: Remove and replace, include the removal of existing fence, removal of any public or private attachments to existing fencing, and the following substituted: 550-6 Basis of Payment. 550-6.1 Basic Items of Fencing: The Contract unit price per foot for the item of fencing, will be full compensation for all work and materials necessary, fencing, which may be necessary for maintaining security of livestock, etc., on adjacent property during

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/by-year/2021/january-2021/maintenance/finalized/sp5500100-i16440.docx?sfvrsn=118b8773_2

SP5500100

FENCING. (REV 3-9-18) (7-20) ARTICLE 550-1 is expanded by the following: Remove and replace, include the removal of existing fence, removal of any public or private attachments to existing fencing, and the following substituted: 550-6 Basis of Payment. 550-6.1 Basic Items of Fencing: The Contract unit price per foot for the item of fencing, will be full compensation for all work and materials necessary, fencing, which may be necessary for maintaining security of livestock, etc., on adjacent property during

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/by-year/2020/july-2020/maintenance/finalized/sp5500100.docx?sfvrsn=b5240dea_2

SP5500100redline

 SP5500100 All Maintenance Contracts FENCING. (REV 9-24-1428-15) (1-1516) ARTICLE 550-1 is expanded by the following: Remove and replace damaged, destroyed, or deteriorated posts and fence, of any public or private attachments to existing fencing, fence maintenance, furnishing of materials, of Payment. 550-6.1 Basic Items of Fencing: The Contract unit price per foot for the item of fencing, by the Engineer. (f)6. Any cost of erection and removal of any temporary fencing, which may

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/by-year/2016/january-2016/maintenance/review-package/sp5500100redline.pdf?sfvrsn=1c111bd9_0

SP5500100

 FENCING. (REV 9-28-15) (1-16) ARTICLE 550-1 is expanded by the following: Remove and replace, fencing, fence maintenance, furnishing of materials, replacement or mending of wire fabric, barbed, and the following substituted: 550-6 Basis of Payment. 550-6.1 Basic Items of Fencing: The Contract unit price per foot for the item of fencing, will be full compensation for all work and materials necessary, of posts ordered by the Engineer. 6. Any cost of erection and removal of any temporary fencing

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/by-year/2016/january-2016/maintenance/implemented/sp5500100.pdf?sfvrsn=860fed7c_1

550-004

) the fence Note: When height of headwall is 4' or less 2 0 ' M i n . FENCING TERMINALS AT BRIDGE ENDS FENCING TERMINALS AT BRIDGE ENDS FENCING TERMINALS AT BOX CULVERTS FENCING DETAIL, NOTE: LA R/W along the crossroad will extend a minimum FENCING TERMINALS AT URBAN INTERCHANGES FENCING TERMINALS AT RETAINING WALLS INSET A FENCING TERMINALS AT RURAL INTERCHANGES PLAN ELEVATION

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/design/standardplans/2025/idx/550-004.pdf?sfvrsn=1c47532c_1

550-004

) the fence Note: When height of headwall is 4' or less 2 0 ' M i n . FENCING TERMINALS AT BRIDGE ENDS FENCING TERMINALS AT BRIDGE ENDS FENCING TERMINALS AT BOX CULVERTS FENCING DETAIL, NOTE: LA R/W along the crossroad will extend a minimum FENCING TERMINALS AT URBAN INTERCHANGES FENCING TERMINALS AT RETAINING WALLS INSET A FENCING TERMINALS AT RURAL INTERCHANGES PLAN ELEVATION

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/design/standardplans/2026/idx/550-004.pdf?sfvrsn=577f8647_1

SPM5500100ind

information - incomplete forms will be returned) FENCING. (REV 3-9-1812-16-24) (FY 20254-265) ARTICLE, , replace, repair, and remove fencing and gates at locations specified in the Contract Documents, andRepair or replace damaged, destroyed, or deteriorated fencing, including posts, fencing fabric, the removal of existing fence, removal of any public or private attachments to existing fencing, the fence is located along a limited access facilityWhen replacing or repairing fencing, perform

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/by-year/fy-2025-26/maintenance/review-package/spm5500100ind.pdf?sfvrsn=61b69b1b_1

E3X95

Unit Quantity Section 0001 TREE TRIMMING AND REMOVAL (MH) 0550- 10-110 FENCING, TYPE A, 0.0-5.0', STANDARD LF 1,000.000 0550- 10-118 FENCING, TYPE A, 0.0-5.0', TYPE A STANDARD, RESET EXISTING LF 500.000 0550- 10-150 FENCING, TYPE A, 8.1-10.0', STANDARD LF 5,000.000 0550- 10-158 FENCING, TYPE A, 8.1-10.0', RESET EXISTING LF 3,000.000 0550- 10-220 FENCING, TYPE B, 5.1-6.0', STANDARD LF 1,000.000 0550- 10-228 FENCING, TYPE B, 5.1-6.0, RESET EXISTING LF 1,000.000 0550- 15- 11 FENCE REPAIR

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/contracts/d3/lettings/2024/may09/e3x95.pdf?sfvrsn=17ece783_1
20 of 834 results