3390 search results for REPORT NUMBER

44728715201-ESTIMATES-QUANTITIES

Lauderdale, FL 33309 Stanley M. Kline, P.E. No. 44016 3. Match the pay item numbers and quantities in Designer Interface for AASHTOWare Project Preconstruction™. ESTIMATED QUANTITIES REPORT Seal Graphic Financial Project ID: 44728715201 Contract Number: CAP89 Project Description: SR 25/80 (US 27, of Lump Sum Items Quantity Total Quantity Pay Item Number Pay Item Description Units of Measure P F, Secondary Quantity Location Pay Item Number Pay Item Description Units of Measure Number Required

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/procuement_marketingd1/documents/fy-25-26/ad--26111/44728715201-estimates-quantities.pdf?sfvrsn=76c1b2f8_1

44629015201-ESTIMATES-QUANTITIES_PHIV

33830-3809 KELLIE F. SPURGEON, P.E. NO 66484 ESTIMATED QUANTITIES REPORT 3. Match the pay item numbers and quantities in Designer Interface for AASHTOWare Project Preconstruction™. Financial Project ID: 446290-1-52-01 Contract Number: E1W93 Project Description: SR 45 (US 41) from Lychee Road, Quantity Pay Item Number Pay Item Description Units of Measure P F P F Design Notes, Item Number Pay Item Description Units of Measure Number Required Duration (Days) P F P F

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/procuement_marketingd1/documents/fy24-25/ad--25127/44629015201-estimates-quantities_phiv.pdf?sfvrsn=23bfba4e_1

fdot-bed31-977-08-rpt

Report for FDOT Project BED31-977-08 FDOT Project BED31-977-08 Task 6 Final Report Submitted, The opinions, findings, and conclusions expressed in this report are those of the authors and not necessarily those of the State of Florida Department of Transportation. iii Technical Report Documentation Page 1. Report No. 2. Government Accession No. 3. Recipient’s Catalog No. 4. Title and Subtitle Research on Artificial Intelligence for Data Integration with State Highways 5. Report Date

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/research/reports/fdot-bed31-977-08-rpt.pdf?sfvrsn=8b34b0f6_1

D3-04-10-25BSN

of 1990 should send an e-mail to: contracts.admin@dot.state.fl.us or call telephone number (850)638,  A current State of Florida Vendor Number is required prior to first-time registration; please, allow 24 to 48 hours for receipt of a new vendor number. Prior to placing orders, an individual, the contract can be executed. BE SURE THAT THE CONTRACT NUMBER IS ON EACH INSURANCE CERTIFICATE, application for P rime Contractors, statewide, to report their Bidder Opportunity List, DBE Commitments

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/contracts/d3/lettings/2025/apr10/d3-04-10-25bsn.pdf?sfvrsn=b5091733_1

Staff-Directors-Final-Packet-01-27-22-final

Director’s Report A. The First 47 Days B. OIG Investigation Report/Budget Report C. Legislative Update, to mark.reichert@dot.state.fl.us. Item Number 1 Call to Order & Pledge of Allegiance DISCUSSION: The Chair, of Allegiance. REQUESTED ACTION: None requested. ATTACHMENT: None. Item Number 2 Approval of Minutes, REPORT • UPWP REPORT Item 4A, UPWP Report, was deferred to the MPOAC budget discussion under item, that this number is changing quickly. Previously, the number of bills typically exceeds 1000. The bills

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/mpoac_website/meetings/2022/staff-directors-final-packet-01-27-22-final.pdf?sfvrsn=5a393a38_1

Chapter_11

(A) In areas where 911 is not available, the telephone numbers of the physicians, hospitals, or ambulances, or fabricator name and address; (B) ROPS model number, if any; (C) Tractor make, model, or serial number, . No Smoking - Stop Motor." (2) IN CASE OF FIRE OR SPILL: (a) Use emergency stop button. (b) Report accident by calling [include local fire department number and phone location] (B) Operating instructions

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/safety/industrialsafety/chapter_11.pdf?sfvrsn=49b454eb_1

452784_Final_Technical_Scope

. of SR 683 (US 301) TECHNICAL SCOPE State Road Number: SR 45 Section Number: 17020000 County, FPID No.: 452784-1 Work Mix: 0012 (Resurfacing) 1. Existing R/W Map Project Numbers: 1702-202 (1949); 100 feet minimum 2. Old Construction Project Numbers: 421830-1_RRR_MP15.248_MP17.206_FY08, % = 3.4 12. Are there any old houses or buildings adjacent to the project? No 13. Number, this scope report.  The existing roadway components include vehicular, and pedestrian elements

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/procuement_marketingd1/documents/fy-25-26/ad--26105/452784_final_technical_scope.pdf?sfvrsn=656d1564_1

E4X61Appendix001

(TSM&O) Device Maintenance Contract, District Four Financial Project Number(s): 406795-7-72-01 and various Proposal/Contract Number: E4X61 Intelligent Transportation Systems (ITS) Maintenance, it is an Emergency repair. The Contractor shall prepare and submit a diagnostic report to the Department’s Project Manager. The report shall include a damage assessment, cost estimates, details about the incident (date, time, cause of damage).  Obtain the police report if applicable

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/contracts/d4/rfp/e4x61/e4x61appendix001.pdf?sfvrsn=b2e9e9f6_1

16140000 - MP 0.345 - Intersection Safety Study - FINAL_10-27-2020

and Derby Avenue within the five-year time period. Crash Report Number 85621543: A sideswipe collision, of Vehicle 1 was under DUI (drug under influence). Crash Report Number 85895260: A left-turn, for the intersection. 2.0 EXISTING CONDITIONS This section of the report describes the existing, in Table 1, and collision diagrams and collision summary sheets are included in Appendix C of this report, for this study intersection was calculated based on the number of crashes per million entering

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/procuement_marketingd1/documents/fy-25-26/ad--26106/16140000---mp-0-345---intersection-safety-study---final_10-27-2020.pdf?sfvrsn=9b4fb9bf_1

Florida TIM Responder - June 2022

Road Ranger operators killed in struck by vehicle incidents. Examining crash report statistics from, RESPONDER V3 / ISSUE 2 • 2022 TIM RESPONDER V3 / ISSUE 2 • 2022 Incidents by the Numbers Road, incident responders have received training in the state of Florida (as of April 11, 2022). That number, in EV implementation, first responders are also handling the challenges of the increased number of EV, characteristics such as the number of lanes and sightline issues » Improved interoperability

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/traffic/cvotim/tim/newletters/florida-tim-responder---june-2022.pdf?sfvrsn=9e2ec795_1

fm5-541

markings, etc.). 4. REPORT Use Form Number 700-050-70, Traffic Marking Certification, to record, . 3.2.6. Permanent Tape Measure the thickness of each batch number, prior to application, using, . Report the average of the six measurements. 6.1.4. For Profiled Thermoplastic, also take thickness, Avenue Gainesville, Florida 32609 August 7, 2023 FM 5-541 9 7. REPORT 7.1. For Pavement Marking, using APL field evaluation data: Report all field evaluation data (thickness, retroreflectivity

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/materials/administration/resources/library/publications/fstm/methods/fm5-541.pdf?sfvrsn=49b251be_8

Peer Exchange Final Report (8-3-21)

Peer Exchange Final Report (8-3-21),  1 Florida and Louisiana 2021 Peer Exchange Final Report FLORIDA - LOUISIANA PEER EXCHANGE, to learn more in this specialized topic. This report highlights the key observations, and to report on any lessons learned. Appendix B contains a copy of all presentations. Jill Stark – Turner, of ease of obtaining them. Dr. Das noted that they did ask for a number of no- cost extensions, to organizational systems. The increased number of employees transitioning to telework had

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/research/docs/peer-exchange-final-report-(8-3-21).pdf?sfvrsn=a3aafd4f_1

IA Project Review

the Financial Project Number (FPN) and select the entry from the returned list. You will be navigated, – select this type to put the finding under the ERS tab. b. Final Commercial Inspection Report – does not apply to ERS. c. Final Construction Compliance Report – does not apply to ERS. d. Final Quantity of Reinforcing Steel on the Contract – does not apply to ERS. e. Final Sign Inspection Report, ) (Finding number(s)) M. Promoting a Finding to MAR MAR stands for Materials Acceptance Resolution

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/materials/mac/training/ers/ia-project-review.pdf?sfvrsn=17798420_1

9650200-723FHWA

Requirements Documentation Requirements Certified Test Report Shows that product meets Moment, Display’s the manufacturer’s name or logo and the model number. Product Photo Displays the significant, of 10,000 foot-pounds, without breaking, cracking or rupturing in any manner. Certified Test Report, Requirements Documentation Requirements Certified Test Report Shows that product meets Moment Capacity, the manufacturer’s name or logo and the model number. Product Photo Displays the significant

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/by-year/fy-2023-24/review/fhwa/9650200-723fhwa.pdf?sfvrsn=22aaf68b_1

SP4550000DB-122

the Contractor to proceed with subsequent construction operations. Submit a written report, the distribution of the load. Ensure that the type, number, and location of the strain gauges are as shown, report signed and sealed by the Specialty Engineer to the Engineer for review and acceptance, production pile/shaft construction. Include in the report of the load test the following information, . In addition, submit a report showing an analysis of the results of axial load and lateral load

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/by-year/2022/january-2022/design-build/sp4550000db-122.pdf?sfvrsn=951c94e4_2

SP4550000DB-721

the Contractor to proceed with subsequent construction operations. Submit a written report, the distribution of the load. Ensure that the type, number, and location of the strain gauges are as shown, report signed and sealed by the Specialty Engineer to the Engineer for review and acceptance, production pile/shaft construction. Include in the report of the load test the following information, . In addition, submit a report showing an analysis of the results of axial load and lateral load

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/by-year/2021/july-2021/design-build/sp4550000db-721.pdf?sfvrsn=cb06bab9_2

SP4550000DB

construction operations. Submit a written report by the divers to the Engineer indicating the results, the distribution of the load. Ensure that the type, number, and location of the strain gauges are as shown, of the conduct and the results of the test. 455-2.8 Required Reports: Submit a static load test report, pile/shaft construction. Include in the report of the load test the following information: 1, . In addition, submit a report showing an analysis of the results of axial load and lateral load tests

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/by-year/2021/january-2021/design-build/sp4550000db3974934a4ac24aa1a96883779ad54def.docx?sfvrsn=f0b6d904_2

SP4550000DB-722AddChng impl

report by the divers to the Engineer indicating the results of their underwater inspection before, to measure the distribution of the load. Ensure that the type, number, and location of the strain, : Submit a static load test report signed and sealed by the Specialty Engineer to the Engineer for review, , prior to beginning production pile/shaft construction. Include in the report of the load test, calibration certifications. In addition, submit a report showing an analysis of the results of axial

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/by-year/2022/july-2022/review/implemented/sp4550000db-722addchng-impl.pdf?sfvrsn=e9fcba72_2

SP4550000DB-722-AddChng origind

a written report by the divers to the Engineer indicating the results of their underwater inspection, , number, and location of the strain gauges are as shown in the Plans or as directed, of the test. 455-2.8 Required Reports: Submit a static load test report signed and sealed, . Include in the report of the load test the following information: 1. A tabulation of the time, together with instrument calibration certifications. In addition, submit a report showing an analysis

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/by-year/2022/july-2022/review/internal/sp4550000db-722-addchng-origind.pdf?sfvrsn=8656b756_2

SP4550000DB-722origind

the Contractor to proceed with subsequent construction operations. Submit a written report by the divers, that the type, number, and location of the strain gauges are as shown in the Plans or as directed, and the results of the test. 455-2.8 Required Reports: Submit a static load test report signed and sealed, construction. Include in the report of the load test the following information: 1. A tabulation, together with instrument calibration certifications. In addition, submit a report showing an analysis

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/by-year/2022/july-2022/review/internal/sp4550000db-722origind.pdf?sfvrsn=368c4ff0_2
20 of 3390 results