3390 search results for REPORT NUMBER

CM-990-3.1-03 Portable Regulatory Sign

the requirements of NEMA TS 4-2016 Section 2 FORMDROPDOWN Provide a third party test report that demonstrates compliance with this requirement. The test report must meet the requirements of FDOT Product, are permanently marked with the APL number, manufacturer’s name or trademark, model/part number, and date of manufacture or serial number. FORMDROPDOWN FORMTEXT Applicant may provide comments

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/traffic/traf_sys/compliance-matrices-2022/cm-990-3-1-03-portable-regulatory-sign.docx?sfvrsn=c5b5afaf_1

CM-660-07 Automatic Vehicle Identification Detection System

995-1.1 All equipment is permanently marked with, manufacturer name or trademark, part number, and date of manufacture or serial number. FORMDROPDOWN FORMTEXT Applicant may provide comments, . FORMDROPDOWN Provide a third party test report that demonstrates the device performs all required, Sections 2.2.7, 2.2.8, and 2.2.9. The test report must be less than 5 years old and meet, identification number is displayed on an external label and all AVI devices operate within their FCC

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/traffic/traf_sys/compliance-matrices-2022/cm-660-07-automatic-vehicle-identification-detection-system.docx?sfvrsn=13af21e2_1

SPI-534-200

NCHRP Report 343 (pg. 198). • Foundations in this Index have been designed in accordance, lengths. Plan Content Requirements Include the "Report of Core Borings" (Soil Information Data, Item number Item Description Unit Measure 534-72-101 Concrete Noise Wall, Permanent SF 534-72-102, is to be a light brown, (color number 33446). Wall No. 2 aesthetics require a flush panel type wall, is to be light brown, color number 33446. Post caps are not required. Standard Plans Instructions Topic

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/design/standardplans/2025/spi/spi-534-200.pdf?sfvrsn=82ce9d1f_2

CM-688-01 Road Weather Information System (Dev)

number(s) in this field. Compliance Matrix Review 24 688-2.5 Software for system configuration, is permanently marked with manufacturer name or trademark, part number, and serial number, , 2.2.8., and 2.2.9. FORMDROPDOWN Provide a first or third party test report that demonstrates compliance with this requirement. The test report must meet the requirements of FDOT Product

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/traffic/traf_sys/compliance-matrices-2022/cm-688-01-road-weather-information-system-(dev).docx?sfvrsn=22146d99_1

Dev937PIAS (8-20-24)

Identification Number 6. Storage and Handling Requirements D o N o t U s e W i t h o u t C O, , or detrimental to persons or property. Independent Laboratory Test Report For product, and address 2. Product Name 3. Anchor material grade 4. LOT Identification Number Safety Data Sheet (SDS, . Manufacturer’s name and address 2. Product Name 3. Anchor material grade 4. LOT Identification Number, or property. Independent Laboratory Test Report For product or product system, containing

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/programmanagement/otherfdotlinks/developmental/files/dev937pias-(8-20-24).pdf?sfvrsn=cc8a965e_1

SPI-534-200

boring characteristics averaged over a depth of 8 shaft diameters may be assumed per NCHRP Report 343, Requirements Include the "Report of Core Borings" (Soil Information Data) on a separate sheet, No. 625-010-003 Index 534-200 Precast Noise Walls FY 2025-26 11 Payment Item number Item, , (color number 33446). Wall No. 2 aesthetics require a flush panel type wall. The front face of panels, number 33446. Post caps are not required. Standard Plans Instructions Topic No. 625-010-003 Index

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/design/standardplans/2026/spi/spi-534-200.pdf?sfvrsn=269b11e_1

D3-04-11-24BSN

20.055(5) Florida Statute. Page Number Proposal Id Proposal Notes Fin Proj Numbers County 3 E3W79, of 1990 should send an e-mail to: contracts.admin@dot.state.fl.us or call telephone number (850)638, An Order  A current State of Florida Vendor Number is required prior to first-time registration; please, . Please allow 24 to 48 hours for receipt of a new vendor number.  Prior to placing orders, the contract can be executed. BE SURE THAT THE CONTRACT NUMBER IS ON EACH INSURANCE CERTIFICATE

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/contracts/d3/lettings/2024/apr11/d3-04-11-24bsn.pdf?sfvrsn=ceb8d1b7_3

AASHTO Internal Control Questionnaire (ICQ) for Consulting Engineers

Identification Number): Headquarters Address: Company Website: Fiscal Year End: This ICQ was prepared, the following items as attachments to this ICQ:  FAR Part 31 Overhead Audit Report for most recent, .  Cognizant audit report or cognizant letter of concurrence from the cognizant Government agency. Check, and indirect cost rate schedule.  Independent Auditor’s Report on financial statements and accompanying, contact for accounting questions: Name: Title: Phone Number: E-mail Address: Mailing address

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/procurement/pdf/aashto-internal-control-questionnaire-(icq)-for-consulting-engineers.pdf?sfvrsn=d7eccc43_1

1-MPOAC-Staff-Directors-Power-Point-June-07-2018

Public Comments (non‐agenda items) Executive Directors Report UPWP Report Legislative Summary UPWP Report Accomplishments are in the meeting packet Legislative work Performance Measures Weekend Institute Expenses are running slightly under budget Legislative Report Overall Summary 3192, Facility specific Autocycles Mobile Carriers Ingress/Egress with Universities Legislative Report, Legislative Report HB 575 – The MPO Bill • Was unexpected • Moving target • July Policy

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/mpoac/uploads/filebase/november_6-7._2017_documents/1-mpoac-staff-directors-power-point-june-07-2018_f7acd016-429f-4648-aeff-58030967586d.pdf?sfvrsn=4cf48bde_2

1-MPOAC-Staff-Directors-Power-Point-June-07-2018_2

Public Comments (non‐agenda items) Executive Directors Report UPWP Report Legislative Summary UPWP Report Accomplishments are in the meeting packet Legislative work Performance Measures Weekend Institute Expenses are running slightly under budget Legislative Report Overall Summary 3192, Facility specific Autocycles Mobile Carriers Ingress/Egress with Universities Legislative Report, Legislative Report HB 575 – The MPO Bill • Was unexpected • Moving target • July Policy

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/mpoac_website/meetings/2018/1-mpoac-staff-directors-power-point-june-07-2018_2.pdf?sfvrsn=2f1d835a_1

4620100.FHWA

. 4620100 All Jobs 2.Submit records to the Engineer identifying assigned LOT numbers with heat or reel, e Submit grouting report signed by the grouting Contractor within five days of each grouting, or overages. 3.Information to be noted in this report must include at a minimum, n j e c t i o n O p e r a t i o n s R e p o r t : 1. P r o v i d e Submit wax injection report, . 3.Information to be noted in this report must include at a minimum, but not necessarily be limited to: a. I d

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/by-year/2016/july-2016/review/fhwa/4620100.fhwa.pdf?sfvrsn=9148d9b0_0

understandingridershiptrendsintransit2

 Understanding Ridership Trends in Transit Final Report Report prepared for: Florida, in Transit Task 8 Deliverable: Final Report BDV25 977-45 Report prepared for: Florida Department, .” Understanding Ridership Trends in Transit February 2019 Page iii Technical Report Documentation Page 1. Report No. 2. Government Accession No. 3. Recipient's Catalog No. 4. Title and Subtitle Understanding Ridership Trends in Transit Five. Report Date February 2019 6. Performing

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/transit/documents/understandingridershiptrendsintransit2_b0f3df24-2e66-47b4-a942-904b750bb325.pdf?sfvrsn=6bc67645_2

4620000-723origind

local zone reinforcement for the number of strands or wires a particular PT system can accommodate, number and tag items shipped to project in a manner that allows each LOT to be clearly identified, numbers with heat or reel of material represented if applicable. 4620000 - REVISED All Jobs 3, by the Engineer in writing. 462-7.2.1 Ducts: 1.Construct tendon ducts using the minimum number of splices, approval of the Engineer, the maximum number of calendars days allowed between the first

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/by-year/fy-2023-24/review/internal/4620000-723origind.pdf?sfvrsn=eb21c29e_1

schedule_dictionary - Copy

LOCATION HYDRAULICS REPORT-LHR 101 TASK WORK ORDER AUTHORIZATION 102 TRAFFIC STUDIES, alignment, and Set alignment monumentation 104 ENGINEERING REPORT 105 PHOTO TOPOGRAPHICS, An abbreviated version of the Bridge Development Report used to define the continuing structure, calculation, final PH II Geotechnical Report, Addendum to Hydraulic Report and Technical Special, SOILS SURVEY 132 ROADWAY SOILS REPORT 133 FOUNDATION INVESTIGATIONS

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/test2/d2test/schedule_dictionary---copy.htm?sfvrsn=2f6ef41e_1&download=true

Sched 2 Test

100 LOCATION HYDRAULICS REPORT-LHR 101 TASK WORK ORDER AUTHORIZATION, existing monumentation to establish alignment, and Set alignment monumentation 104 ENGINEERING REPORT, Plans An abbreviated version of the Bridge Development Report used to define the continuing, , design calculation, final PH II Geotechnical Report, Addendum to Hydraulic Report and Technical, 131 ROADWAY SOILS SURVEY 132 ROADWAY SOILS REPORT 133

https://www.fdot.gov/test/sched-2-test

FDOT AAMWG Final Report - August 10 2023

FDOT AAMWG Final Report - August 10 2023,  Report and Recommendations FDOT AD VANCED AIR MOBILITY WORKING GROUP August 2023 Photo, AAM Roadmap: Completed in 2022, this report broadly outlines AAM, eVTOL aircraft, major eVTOL, of the AAM industry, and to garner comments and ideas which are incorporated into this report, governments, the report examines the different roles and responsibilities for these governments and bases the recommendations on those roles. While the recommendations in this report are focused

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/aviation/pdfs/fdot-aamwg-final-report---august-10-2023.pdf?sfvrsn=56d82d5d_1

D5-06-03-24BSN

an e-mail to: contracts.admin@dot.state.fl.us or call telephone number (386) 943-5514. Special, . To Place An Order • A current State of Florida Vendor Number is required prior to first-time registration, information. Please allow 24 to 48 hours for receipt of a new vendor number. Prior to placing orders, and Procurement Office before the contract can be executed. BE SURE THAT THE CONTRACT NUMBER IS ON EACH, is a web based application for Prime Contractors, statewide, to report their Bidder Opportunity List

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/contracts/d5/asset-maintenance/e54c3/d5-06-03-24bsn.pdf?sfvrsn=5a0dedd9_1

CM-660-01 Video Vehicle Detection System

marked with manufacturer name or trademark, part number, and date of manufacture or serial number, report that demonstrates the device performs all required functions during and after being subjected, a completed Testing Laboratory and Report Checklist and NEMA TS2 2.2.7-2.2.9 Checklist. Document Review, certified. The FCC identification number is displayed on an external label and all VVDS devices, to the maximum number of lanes that the device can monitor as specified by the manufacturer

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/traffic/traf_sys/compliance-matrices-2022/cm-660-01-video-vehicle-detection-system.docx?sfvrsn=a266430d_1

9160000.origind

Qualified Products List Number Report Modifier Modifiedbinders only Report Solubility, AASHTO T, , Article, or Subarticle Number: 916 Why does the existing language need to be changed? Refinement, with Section 6 and include a report of test results from an independent laboratory confirming, report by the supplier containing specification compliance and QC test results for each PG asphalt, . The report shall consist of the specification compliance testing and QC testing of the following

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/by-year/2014/july-2014/review/internal/9160000.origind.pdf?sfvrsn=192f3820_0

Pt1Ch4_073124_clean

, and mitigation of potential project impacts. The Programming Screen Summary Report summarizes recommendations and results from the ETAT reviews. FDOT uses the report to advance or focus analyses, . The ETDM Programming Screen Summary Report also contains screening documentation of project, process are documented in the Alternative Corridor Evaluation Report (ACER) . The ACER should

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/environment/pubs/pdeman/2024/pt1ch4_073124_clean.pdf?sfvrsn=96967a6e_1
20 of 3390 results