3390 search results for REPORT NUMBER
1020100-723impl
equipment and number of traffic control officers required, the proposed traffic pacing lengths, , record the number of vehicles in the direction of the closure during a 15-minute period. Multiply the number of vehicles by four and divide by the number of lanes in the direction of the closure. 102-5, Plans, Index 102-600. Device location or the number of devices, may be adjusted as recommended, under all weather conditions. 102-5.4 Number of Traffic Lanes: Maintain one lane of traffic
https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/by-year/fy-2023-24/review/implemented/1020100-723impl.pdf?sfvrsn=ffb5df33_2650-000-002_ETDM-Manual-All-Effective-2024-1231
. On March 16, 2006, the FDOT Secretary approved Procedure Number 650-000-002, which established statewide, ), and the two-part Project Development and Environment (PD&E) Manual (Procedure Number 650-000-001, Department of Transportation. 2013. Standard Operating System (Procedure Number 025-020-002). Accessed, . Project Development and Environment Manual (Procedure Number 650-000-001). Accessed at http, , pedestrian, and other transportation facilities and services. A number of these activities support
https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/environment/pubs/etdm/2024-etdm-manual/650-000-002_etdm-manual-all-effective-2024-1231.pdf?sfvrsn=816f4b01_2E3W23Addendum004
Number(s): 442667-1-52-01, 442667-1-52-02, & 442667-1-56-01 Federal Aid Project Number(s): D323-054-B Contract Number: E3W23 Addendum No. 1 – July 24, 2023 Addendum No. 2 – August 1, 2023, Screening Evaluation Report (March 2020) Natural Resources Evaluation Report (June 2020) Location Hydraulics Technical Memorandum (July 2019) Project Analysis Traffic Report (January 2019) Pond Siting Report (February 2020) Preliminary Engineering Report Noise Study Report (Draft August 2020
https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/contracts/d3/design-build/e3w23/e3w23addendum004.pdf?sfvrsn=e3521d92_1E3W23Addendum005
Number(s): 442667-1-52-01, 442667-1-52-02, & 442667-1-56-01 Federal Aid Project Number(s): D323-054-B Contract Number: E3W23 Addendum No. 1 – July 24, 2023 Addendum No. 2 – August 1, 2023, Assessment (August 2021) Contamination Screening Evaluation Report (March 2020) Natural Resources Evaluation Report (June 2020) Location Hydraulics Technical Memorandum (July 2019) Project Analysis Traffic Report (January 2019) Pond Siting Report (February 2020) Preliminary Engineering Report
https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/contracts/d3/design-build/e3w23/e3w23addendum005.pdf?sfvrsn=e8e1704f_101_ALL COUNTIES_TWP2026-2030 WPPH_BY DESCRIPTION_11-13-2024_SUBJECT TO CHANGE
Draft Tentative Five-Year Work Program Public Hearing Summary Report - As of November 13, 2024, $85,000 Draft Tentative Five-Year Work Program Public Hearing Summary Report - As of November 13, 2024, Summary Report - As of November 13, 2024 July 1, 2025 through June 30, 2030 Florida Department, Summary Report - As of November 13, 2024 July 1, 2025 through June 30, 2030 Florida Department, Tentative Five-Year Work Program Public Hearing Summary Report - As of November 13, 2024 July 1
https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/d2_documents/documents-by-description/01_all-counties_twp2026-2030-wpph_by-description_11-13-2024_subject-to-change.pdf?sfvrsn=5a8d5f6c_101_ALL COUNTIES_TWP2026-2030 WPPH_BY ITEM_11-13-2024_SUBJECT TO CHANGE
Draft Tentative Five-Year Work Program Public Hearing Summary Report - As of November 13, 2024, 454147-1 $190,000 Draft Tentative Five-Year Work Program Public Hearing Summary Report, Report - As of November 13, 2024 July 1, 2025 through June 30, 2030 Florida Department, Public Hearing Summary Report - As of November 13, 2024 July 1, 2025 through June 30, 2030 Florida, Five-Year Work Program Public Hearing Summary Report - As of November 13, 2024 July 1, 2025
https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/d2_documents/documents-by-type/01_all-counties_twp2026-2030-wpph_by-item_11-13-2024_subject-to-change.pdf?sfvrsn=5451208e_1FDOT Source Book Methodology
FDOT SOURCE BOOK METHODOLOGIES A Technical Report - 2024 produced by Florida Department, A Technical Report produced by Florida Department of Transportation Systems Forecasting and Trends Office, ............................................................................................................................... 14-1 14.1 Number of Fatalities, 14.2 Number of Serious Injuries, (such as the number of lanes, posted speed limit, and functional classification), demand for the roadway
https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/planning/fto/sourcebook/sbmethodology.pdf?sfvrsn=b9e4ddc5_66Section83V2D01cln
best quality into service whenever possible, the number of Products with major defects must be kept, gathered during a monitoring period for each Product group includes the following: 1) Total number of Products cast. 2) Number of major defects, by defect type, in the Products cast. 3) Total number of major defects, which is the summation of all major defect types in (2). 4) The defect rate, which is computed by dividing the value in (3) above (total number of major defects) by the value
https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/by-year/2021/january-2021/materials-manual/section83v2d01cln.pdf?sfvrsn=46aaed38_2SS7810000
) Report 412, Fatigue-Resistant Design of Cantilevered Signal, Sign, and Light Supports. Design, and manufacturing utilizes the latest available techniques with a minimum number of different, . Limit the number of seams on the top of the housing to a maximum of three. Stitch weld the exterior, or a laptop computer. Ensure that the log file includes the pixel status, module number, column number, and pixel number. Ensure that the pixel status test determines the functional status
https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/by-year/2007/january-2007/workbook/ss7810000.pdf?sfvrsn=86cb4905_02024-25_Innovative_Svc_Dev_Program_Manual_Instructions
the Federal Employer Identification Number (FEIN) and the information that is registered with MyFloridaMarketPlace (www.dms.myflorida.com). FEDERAL EMPLOYER IDENTIFICATION NUMBER: The number used, associated with the applicant’s FEIN. CONTACT PERSON, PHONE NUMBER AND E-MAIL ADDRESS: Provide the name of the person who will be the point of contact for this grant, their phone number, and email, to specific page numbers. PROJECT DESCRIPTION (Required, 15 points) Provide a detailed description
https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/ctd/docs/grantdocs/2024-25_innovative_svc_dev_program_manual_instructions.pdf?sfvrsn=fd48b115_1Chapter5s15Redline
an Estimated Quantities Report (EQR), will reference supporting documentation and calculations, Item Description, Unit of Measure, Quantity, Location, and Stationing. (B) Area ID numbers, ) document number for the invoice in AASHTOware Project Construction (PrC). Topic No. 700-000-000, will be the project area multiplied by the number of completed mowing cycles. The individual areas of mowing, or adjust the project area. Multiply the project area by the number of completed litter removal cycles
https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/construction/manuals/cpam/newhistory/chapter5s15redline.pdf?sfvrsn=bc30ec1c_5Chapter5s15
or, for contracts using an Estimated Quantities Report (EQR), on the Pay Item Summary, Item Description, Unit of Measure, Quantity, Location, and Stationing. (B) Area ID numbers, System (EDMS) document number for the invoice in AASHTOware Project Construction (PrC). 5.15.6.2, will be the project area multiplied by the number of completed mowing cycles. The individual areas, not final measure or adjust the project area. Multiply the project area by the number of completed litter
https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/construction/manuals/cpam/newcleanchapters/chapter5s15.pdf?sfvrsn=56856a44_6fdot-bdv25-977-72-rpt
for the Florida Trade Imbalance and Empty Backhauls Final Report September 2022 PREPARED, Trade Imbalance and Empty Backhauls Deliverable 7: Final Report Submitted to: Mr. Rickey Fitzgerald, CONVERSION TABLE 5 III. TECHNICAL REPORT DOCUMENTATION PAGE 1. Report No. 2. Government Accession No. 3, for the Florida Trade Imbalance and Empty Backhauls 5. Report Date September 2022 6. Performing, 8. Performing Organization Report No. 9. Performing Organization Name and Address Supply Chain
https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/research/reports/fdot-bdv25-977-72-rpt.pdf?sfvrsn=1596b769_32024 Occupational Safety and Health Searchable Manual
an incident case number and include this number on the crash report. (D) The driver must provide, 5.3 VEHICLE CRASH 5.4 VEHICLE INCIDENT 5.5 VEHICLE CRASH/INCIDENT REPORT DISTRIBUTION 5.6 FORMS, shall immediately report to their immediate supervisors any unsafe work practices or unsafe, Employees shall immediately report any work-related incident resulting in personal injury, employees designated by the Unit Manager/Office Head. 1.6.4 Employees who report unsafe acts
https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/safety/industrialsafety/2024-occupational-safety-and-health-searchable-manual.pdf?sfvrsn=1ff5ccf0_1Quadguard Elite - NCHRP350 - Assembly Manual
by the Federal Highway Administration (FHWA) per NCHRP Report 350. These instructions should be read, Highway systems, has been crash tested pursuant to NCHRP Report 350 mandated criteria. Important, , in compliance with the National Cooperative Research Highway Program 350 (NCHRP Report 350) “Recommended, as meeting the requirements and guidelines of NCHRP Report 350. These tests typically evaluate product performance defined by Report 350 involving a range of vehicles on roadways, from lightweight cars
https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/maintenance/rdw/ispe/crash-cushion/quadguard-elite---nchrp350---assembly-manual.pdf?sfvrsn=744baad3_1CM-700-05 Dynamic Message Sign
name or trademark, part number, and date of manufacture or serial number. FORMDROPDOWN FORMTEXT, of NEMA TS4, section 3.1.1. FORMDROPDOWN Provide a first or third party test report that demonstrates compliance with this requirement. Also, provide a completed Testing Laboratory and Report Checklist, and Report Checklist if test report is used. Also, provide a statement of conformance, party display properties test report that demonstrates the apertures do not block the LED output
https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/traffic/traf_sys/compliance-matrices-2022/cm-700-05-dynamic-message-sign.docx?sfvrsn=a53358c8_13200300-723impl
information on the printed delivery ticket: 1. Sequential load number 2. Project number 3. Date 4. Name and location of plant 5. Mix design number 6. Place for hand-recording mix temperature 7. Truck number 8. Gross, tare, and net tonnage per truck (as applicable) 9. Daily total tonnage of mix, approved by the Engineer and record the truck number and gross weight from the Contractor’s delivery, a loaded truck of asphalt mix and record the truck number, and the net weight of the asphalt mix
https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/by-year/fy-2023-24/review/implemented/3200300-723impl.pdf?sfvrsn=7e000b47_20090103LS.FHWA
price in the Six Month Moving Statewide Averages report. The dates will be the six months prior, on the portion that exceeds 5%. The Contractor will certify the number of gallons of fuel, application that will calculate and print the number of gallons of bituminous material for the items, of bid and month of this progress estimate. For all asphalt concrete, the number of gallons, or completed. The Contractor’s monthly estimate must consist of the following: 1. Contract Number
https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/by-year/2017/july-2017/review/fhwa/0090103ls.fhwa.pdf?sfvrsn=b1541b50_00090103LS.FHWA
price in the Six Month Moving Statewide Averages report. The dates will be the six months prior, on the portion that exceeds 5%. The Contractor will certify the number of gallons of fuel (gasoline, a computer application that will calculate and print the number of gallons of bituminous material, of this progress estimate. For all asphalt concrete, the number of gallons will be determined assuming a mix, . The Contractor’s monthly estimate must consist of the following: (a) Contract Number, Financial Project
https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/by-year/2015/january-2015/review/fhwa/0090103ls.fhwa.pdf?sfvrsn=96e8acd0_03200300-723origind
on the printed delivery ticket: 1.Sequential load number 2.Project number 3.Date 4.Name and location of plant 5.Mix design number 6.Place for hand-recording mix temperature 7.Truck number 8.Gross, tare, , or another vehicle type approved by the Engineer and record the truck number and gross weight, Engineer will randomly select a loaded truck of asphalt mix and record the truck number, and the net, number 2.Project’s Financial Identification Number (FIN) 3.Date 4.Name and location of plant
https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/by-year/fy-2023-24/review/internal/3200300-723origind.pdf?sfvrsn=c4bebe91_1