PD&E Study for Willoughby Boulevard Extension from State Road (SR) 714/Monterey Road to US 1/SR 5/Federal Highway, Martin County, Florida


About the Study:

This project will evaluate the extension of Willoughby Boulevard from SR 714/Monterey Road to connect to SR 5/US1/Federal Highway. The existing Willoughby Boulevard, south of SR 714/Monterey Road, is a four-lane roadway with sidewalks on both sides. The extension is expected to be two lanes (one in each direction) with sidewalks and bicycle facility accommodations. The project is located within unincorporated Martin County and the City of Stuart in Martin County, Florida.

The project will analyze three alternatives:

  • Corridor 1: Extends Willoughby Boulevard north along SE Alhambra Avenue and across SE Central Parkway to connect with US 1 near SR 5A. 
  • Corridor 2: Realigns Willoughby Boulevard to the east near the Martin County Sheriff’s Office and continues north across SE Monterey Road along SE Rays Way. It then follows SE Central Parkway west to Poppleton Creek Park where it turns north to connect with US 1 near SR 5A. 
  • No Build: The No-Build Alternative will not provide any improvements; it will remain a viable alternative throughout the project.