I-95 at Woolbright Road PD&E Study


Welcome  

The Florida Department of Transportation (FDOT) conducted a Project Development and Environment (PD&E) Study for SR 9/I-95 from South of Woolbright Road to North of Woolbright Road in Palm Beach County, Florida. The purpose of this project was to address traffic spillback onto I-95, reduce congestion on I-95 and Woolbright Road, improve interchange operations, and improve safety at the I-95 and Woolbright Road interchange through the 2045 design year horizon. This project considered SIS connector improvements needed within the project area and was consistent with plans for the I-95 mainline, including the potential extension of I-95 Managed Lanes through Palm Beach County.

Project At A Glance

 
LocationMap_Website-smallDistrict
Four

PD&E Study Start Date
November 2018

PD&E Study Completion Date
April 2021

Construction Cost
TBD

Project Limits
Along I-95 from south of Woolbright Road to north of Woolbright Road, and along Woolbright Road from SW 18th Street to just east of I-95.

Project Manager
Humberto Arrieta, P.E.

 

District Office

Gerry O'Reilly, District Four Secretary

3400 W Commercial Blvd. Fort Lauderdale, Fl 33309

Tel: 954-777-4091
Fax: 954-777-4191
E-Mail Us

Additional Contacts
Staff Directory