FY 2024-25 Workbook


Implemented Modifications to the FY 2024-25 Standard Specifications

FY 2024-25 Workbook

for Lettings Effective July 1, 2024 - June 30, 2025


Special Provisions -Specific clauses adding to or revising the Standard Specifications, setting forth conditions varying from or additional to the Standard Specifications for a specific project.

Supplemental Specifications - Additions or revisions to the Standard Specifications.

Mandatory Revisions - Critical modifications implemented for the Workbook.



Note: These files are in Adobe Acrobat (PDF) format.

File size ranges from 9 kb to 200 kb.

SPECIAL PROVISIONSSP0000001Usage Note
PROPOSAL REQUIREMENTS AND CONDITIONS (BUSINESS DEVELOPMENT INITIATIVE).
(REV 4-21-16) (FA 4-21-16) (FY 2024-25)
SP0020100BDIUse with the approval of the District Program Management Office.
Use with SP0030201BDI, SP0071302BDI and SP0080100BDI.
PROPOSAL REQUIREMENTS AND CONDITIONS - EXAMINATION OF PLANS, SPECIFICATIONS, SPECIAL PROVISIONS, AND SITE OF WORK.
(REV 6-16-21) (FA 8-2-21) (FY 2024-25)

SP0020400All Jobs (Add a phone number or email address)
Do not use withSP0020400-60day.
PROPOSAL REQUIREMENTS AND CONDITIONS - EXAMINATION OF PLANS, SPECIFICATIONS, SPECIAL PROVISIONS, AND SITE OF WORK (60 DAY AD).
(REV 6-16-21) (FA 8-2-21) (FY 2024-25)

SP0020400-60day Jobs with 60-day Ads. (Add a phone number or email address)
Do not use withSP0020400.
PROPOSAL REQUIREMENTS AND CONDITIONS - PREPARATION OF PROPOSALS (A+B BIDDING).
(REV 6-22-04) (FA 7-13-04) (FY 2024-25)
SP0020501AB
A+B Bidding. Use with the approval of the District Construction Engineer.
Use with SP0030100AB, SP0030203AB, SP0080701AB and SP0081300AB.
PROPOSAL REQUIREMENTS AND CONDITIONS - PREPARATION OF PROPOSALS (LANE RENTAL).
(REV 2-21-05) (FA 3-31-05) (FY 2024-25)
SP0020501LRLane Rental. Use with the approval of the District Construction Engineer.
Use with SP0030100LR, SP0081300LRDR and SP0081300LR.
AWARD AND EXECUTION OF CONTRACT - CONSIDERATION OF BIDS - SCOPE ALTERNATES.
(REV 11-3-15) (FA 11-20-15) (FY 2024-25)
SP0030100
Use at the direction of the District Construction Engineer in accordance with the Work Program Instructions.
*Notify Contracts Office on Transmittal Memo.
AWARD AND EXECUTION OF CONTRACT - CONSIDERATION OF BIDS (A+B BIDDING).
(REV 11-5-97) (FA 1-20-98) (FY 2024-25)
SP0030100ABA+B Bidding. Use with the approval of the District Construction Engineer.
Use with SP0020501AB, SP0030203AB, SP0080701AB and SP0081300AB.
AWARD AND EXECUTION OF CONTRACT - CONSIDERATION OF BIDS (BUDGETARY CONSTRAINTS).
(REV 11-3-15) (FA 11-20-15) (FY 2024-25)
SP0030100BC Use at the direction of the District Construction Engineer in accordance with the Work Program Instructions.
*Notify the Contracts Administration Office on the Transmittal Memo.
AWARD AND EXECUTION OF CONTRACT - CONSIDERATION OF BIDS (LANE RENTAL).
(REV 11-3-15) (FA 11-20-15) (FY 2024-25)
SP0030100LRLane Rental. Use with the approval of the District Construction Engineer.
Use with SP0020501LR, SP0081300LR and SP0081300LRDR.
AWARD AND EXECUTION OF CONTRACT - CONSIDERATION OF BIDS (LUMP SUM).
(REV 8-1-00) (FY 2024-25)

SP0030100LSLump Sum Projects.
AWARD AND EXECUTION OF CONTRACT (TIMEFRAME MODIFICATION).
(REV 3-2-17) (FA 4-27-17) (FY 2024-25)

SP0030200Use when modifying the “Award and Execution” timeframes in the Standard Specifications.
*Contracts Office must approve.
AWARD AND EXECUTION OF CONTRACT (BUSINESS DEVELOPMENT INITIATIVE).
(REV 10-3-19) (FA 11-25-19) (FY 2024-25)
SP0030201BDIUse with the approval of the District Program Management Office.
Use with SP0020100BDI, SP0071302BDI, and SP0080100BDI.
AWARD AND EXECUTION OF CONTRACT - AWARD OF CONTRACTS (A+B BIDDING)
(REV 8-22-96) (FA 9-3-96) (FY 2024-25)
SP0030203ABA+B Bidding. Use with the approval of the District Construction Engineer.
Use with SP0020501AB, SP0030100AB, SP0080701AB, and SP0081300AB.
AWARD AND EXECUTION OF CONTRACT - PUBLIC RECORDS
(REV 10-17-16) (FA 10-24-16) (FY 2024-25)
SP0030900All Jobs.
SCOPE OF THE WORK - INTENT OF CONTRACT.
(REV 10-25-21) (FA 1-26-22) (FY 2024-25)

SP0040100All Jobs, excluding Lump Sum.
SCOPE OF THE WORK (LUMP SUM).
(REV 6-3-16) (FA 6-9-16) (FY 2024-25)

SP0040100LSAll Lump Sum Projects.
CONTROL OF THE WORK (LUMP SUM).
(REV 3-15-02) (FY 2024-25)

SP0050101LSLump Sum Projects.
CONTROL OF MATERIALS - ACCEPTANCE CRITERIA (LUMP SUM).
(REV 8-17-09) (FA 8-24-09) (FY 2024-25)

SP0060100LSLump Sum Projects.
CONTROL OF MATERIALS - SOURCE OF SUPPLY - DEPARTMENT’S APPROVED PRODUCT LIST (APL).
(REV 10-10-23) (FA 10-18-23) (FY 2024-25)

SP0060502Use on all jobs.
LEGAL REQUIREMENTS AND RESPONSIBILITY TO THE PUBLIC - LAWS TO BE OBSERVED (COMPLIANCE WITH FHWA 1273).
(REV 9-29-23) (FA10-3-23) (FY 2024-25)

SP0070101Use on all Federal Aid Jobs.
LEGAL REQUIREMENTS AND RESPONSIBILITY TO THE PUBLIC - LAWS TO BE OBSERVED - COMPLIANCE WITH FEDERAL ENDANGERED SPECIES ACT AND OTHER WILDLIFE REGULATIONS (BEAR).
(REV 6-6-17) (FA 6-13-17) (FY 2024-25)

SP0070104-1Use when there is the possibility of human-bear interactions at the project site.
LEGAL REQUIREMENTS AND RESPONSIBILITY TO THE PUBLIC - LAWS TO BE OBSERVED - COMPLIANCE WITH FEDERAL ENDANGERED SPECIES ACT AND OTHER WILDLIFE REGULATIONS (BALD EAGLE).
(REV 6-16-17) (FA 6-28-17) (FY 2024-25)

SP0070104-2Use when an active bald eagle nest has been identified within 660 feet of the project site. 
LEGAL REQUIREMENTS AND RESPONSIBILITY TO THE PUBLIC - LAWS TO BE OBSERVED - COMPLIANCE WITH FEDERAL ENDANGERED SPECIES ACT AND OTHER WILDLIFE REGULATIONS (GOPHER TORTOISE).
(REV 6-15-17) (FA 6-20-17) (FY 2024-25)

SP0070104-3Use when Gopher tortoise burrows will remain within the project area and require protection measures.
LEGAL REQUIREMENTS AND RESPONSIBILITY TO THE PUBLIC - LAWS TO BE OBSERVED - COMPLIANCE WITH FEDERAL ENDANGERED SPECIES ACT AND OTHER WILDLIFE REGULATIONS (MANATEE).
(REV 5-13-20) (FA 6-29-20) (FY 2024-25)

SP0070104-4Use when in-water work will be conducted within an area accessible to manatees.
LEGAL REQUIREMENTS AND RESPONSIBILITY TO THE PUBLIC - LAWS TO BE OBSERVED - COMPLIANCE WITH FEDERAL ENDANGERED SPECIES ACT AND OTHER WILDLIFE REGULATIONS (SMALLTOOTH SAWFISH).
(REV 10-21-21) (FA 1-6-22) (FY 2024-25)

SP0070104-5Use when in-water work will be conducted within an area known to be habitat for the smalltooth sawfish. 
LEGAL REQUIREMENTS AND RESPONSIBILITY TO THE PUBLIC - LAWS TO BE OBSERVED - COMPLIANCE WITH FEDERAL ENDANGERED SPECIES ACT AND OTHER WILDLIFE REGULATIONS (SEA TURTLE).
(REV 10-21-21) (FA 1-6-22) (FY 2024-25)

SP0070104-6Use when work will occur on the sandy beach waterward of the primary dune or in-water work will be conducted within known habitat occupied by sea turtles.
LEGAL REQUIREMENTS AND RESPONSIBILITY TO THE PUBLIC - LAWS TO BE OBSERVED - COMPLIANCE WITH FEDERAL ENDANGERED SPECIES ACT AND OTHER WILDLIFE REGULATIONS (INDIGO SNAKE).
(REV 5-25-17) (FA 6-13-17) (FY 2024-25)

SP0070104-7Use when work will be conducted within habitat suitable for supporting refugia for the Eastern Indigo Snake. 
LEGAL REQUIREMENTS AND RESPONSIBILITY TO THE PUBLIC - LAWS TO BE OBSERVED - COMPLIANCE WITH FEDERAL ENDANGERED SPECIES ACT AND OTHER WILDLIFE REGULATIONS (STURGEON).
(REV 6-24-20) (FA 8-24-20) (FY 2024-25)

SP0070104-8Use when in-water work will be conducted within areas known to support Atlantic, Gulf and/or shortnose sturgeon. 
LEGAL REQUIREMENTS AND RESPONSIBILITY TO THE PUBLIC - LAWS TO BE OBSERVED - COMPLIANCE WITH FEDERAL ENDANGERED SPECIES ACT AND OTHER WILDLIFE REGULATIONS (SEAGRASS BEDS)
(REV 10-3-18) (FA 12-11-18) (FY 2024-25)

SP0070104-9 Used when it has been determined that seagrass beds are located within or nearby the project area. 
LEGAL REQUIREMENTS AND RESPONSIBILITY TO THE PUBLIC - LAWS TO BE OBSERVED - COMPLIANCE WITH FEDERAL ENDANGERED SPECIES ACT AND OTHER WILDLIFE REGULATIONS (FDOT INSTALLED BAT EXCLUSIONS)
(REV 7-11-23) (FA 11-6-23) (FY 2024-25)

SP0070104-10Use when the Contractor will be responsible for maintaining bat exclusions in occupied structures installed by FDOT. 
LEGAL REQUIREMENTS AND RESPONSIBILITY TO THE PUBLIC - LAWS TO BE OBSERVED - COMPLIANCE WITH FEDERAL ENDANGERED SPECIES ACT AND OTHER WILDLIFE REGULATIONS (BATS IN BRIDGES) 
(REV 12-7-18) (12-11-18) (FY 2024-25)

SP0070104-11Use when called for by the District Environmental Permit Office (Bats in Bridges). 
LEGAL REQUIREMENTS AND RESPONSIBILITY TO THE PUBLIC – LAWS TO BE OBSERVED – COMPLIANCE WITH FEDERAL ENDANGERED SPECIES ACT AND OTHER WILDLIFE REGULATIONS (SCRUB-JAYS)
(REV 5-14-20) (FA 7-7-20) (FY 2024-25)

SP0070104-12

Use when the project will occur within known habitat for the Florida Scrub Jay.

LEGAL REQUIREMENTS AND RESPONSIBILITY TO THE PUBLIC – LAWS TO BE OBSERVED - COMPLIANCE WITH FEDERAL ENDANGERED SPECIES ACT AND OTHER WILDLIFE REGULATIONS (FLORIDA SANDHILL CRANE).
(REV 7-11-23) (FA 11-6-23) (FY 2024-25)
SP0070104-13Use when FDOT will provide the Sandhill Crane monitoring. 
LEGAL REQUIREMENTS AND RESPONSIBILITY TO THE PUBLIC - PERMITS AND LICENSES (PERMITS PROCURED BY THE DEPARTMENT).
(REV 11-10-16) (FA 1-26-17) (FY 2024-25)

SP0070201AJobs with permits procured by DOT.
LEGAL REQUIREMENTS AND RESPONSIBILITIES TO THE PUBLIC - PRESERVATION OF EXISTING PROPERTY (TOLL FACILITIES).
(REV 7-22-14) (FA 10-15-14) (FY 2024-25)

SP0071101-tollsUse with the approval of the District Traffic Operations Engineer.
LEGAL REQUIREMENTS AND RESPONSIBILITIES TO THE PUBLIC - PRESERVATION OF EXISTING PROPERTY - UTILITIES - FLORIDA GAS TRANSMISSION COMPANY, LLC (FGT) FACILITIES.
(REV 4-6-16) (FA 4-20-16) (FY 2024-25)

SP0071105FGTUse when Florida Gas Transmission Company, LLC (FGT) is within the project limits.
Use with SP0071201FGT.
LEGAL REQUIREMENTS AND RESPONSIBILITIES TO THE PUBLIC - PRESERVATION OF EXISTING PROPERTY - UTILITIES - UTILITY ADJUSTMENTS (NO UTILITY WORK SCHEDULE).
(REV 2-10-94) (FY 2024-25)

SP0071153AWhen there are no utility work schedules.
LEGAL REQUIREMENTS AND RESPONSIBILITIES TO THE PUBLIC - PRESERVATION OF EXISTING PROPERTY - UTILITIES - UTILITY ADJUSTMENTS (UTILITY WORK SCHEDULES).
(REV 1-26-22) (FA 2-3-22) (FY 2024-25)

SP0071153BWhen there are utility work schedules.
LEGAL REQUIREMENTS AND RESPONSIBILITIES TO THE PUBLIC (FLORIDA GAS TRANSMISSION (FGT) COMPANY, LLC ENCROACHMENT AGREEMENTS).
(REV 7-28-15) (FA 7-31-15) (FY 2024-25)

SP0071201FGTUse when Florida Gas Transmission Company, LLC (FGT) is within the project limits.
Use with SP0071105FGT.
LEGAL REQUIREMENTS AND RESPONSIBILITY TO THE PUBLIC - INSURANCE - COMMERCIAL GENERAL LIABILITY INSURANCE (BUSINESS DEVELOPMENT INITIATIVE).
(REV 4-10-15) (FA 7-31-15) (FY 2024-25)

SP0071302BDIUse with the approval of the District Program Management Office.
Use with SP0020100BDI, SP0030201BDI, and SP0080100BDI.
LEGAL REQUIREMENTS AND RESPONSIBILITY TO THE PUBLIC -CSXT RAILROAD INSURANCE REQUIREMENTS
(REV 5-4-20) (FA 8-24-20) (FY 2024-25)

SP0071303When requested by the District Rail Office.
LEGAL REQUIREMENTS AND RESPONSIBILITY TO THE PUBLIC - WAGE RATES FOR FEDERAL-AID PROJECTS.
(REV 9-26-22) (FA 10-31-17) (FY 2024-25)

SP0071600All Federal Aid Jobs.
LEGAL REQUIREMENTS AND RESPONSIBILITY TO THE PUBLIC - EQUAL EMPLOYMENT OPPORTUNITY REQUIREMENTS.
(REV 4-25-02) (FA 7-17-02) (FY 2024-25)

SP0072700Non-Federal Aid Projects.
LEGAL REQUIREMENTS AND RESPONSIBILITY TO THE PUBLIC - PREFERENCE TO STATE RESIDENTS.
(REV 1-13-12) (FY 2024-25)

SP0072800Non-Federal Aid Projects.
Construction Projects Only.
LEGAL REQUIREMENTS AND RESPONSIBILITY TO THE PUBLIC -        E-VERIFY.
(REV 6-13-11) (FA 6-16-11) (FY 2024-25)

SP0072900All Jobs.
LEGAL REQUIREMENTS AND RESPONSIBILITY TO THE PUBLIC - SCRUTINIZED COMPANIES.
(REV 3-22-18) (FY 2024-25)

SP0073000All Jobs.
           
LEGAL REQUIREMENTS AND RESPONSIBILITY TO THE PUBLIC - TITLE VI ASSURANCE - DOT 1050.2, APPENDIX A and APPENDIX E.
(REV 5-27-16) (FA 6-2-16) (FY 2024-25)

SP0073100All Federally Funded Jobs.
PROSECUTION AND PROGRESS - SUBLETTING OR ASSIGNING OF CONTRACTS (BUSINESS DEVELOPMENT INITIATIVE).
(REV 4-21-15) (FA 7-13-15) (FY 2024-25)

SP0080100BDIUse with the approval of the District Program Management Office.
Use with SP0020100BDI, SP0030201BDI, and SP0071302BDI.
PROSECUTION AND PROGRESS - PROSECUTION OF WORK (SUBMISSION OF WORKING SCHEDULE).
(REV 5-20-21) (FA 7-7-21) (FY 2024-25)

SP0080302AUse only when CPM is authorized by District Construction Engineer.
PROSECUTION AND PROGRESS - PROSECUTION OF WORK - BEGINNING WORK (FLEXIBLE START TIME).
(REV 3-2-17) (FA 4-27-17) (FY 2024-25)

SP0080303AWhen called for by the District Construction Engineer or the District Maintenance Engineer/Administrator. If more than 120 days, approval of the Director, Office of Construction. Do not use with SP0080303C.
PROSECUTION AND PROGRESS - PROSECUTION OF WORK - BEGINNING WORK (NOTICE TO PROCEED).
(REV 3-2-17) (FA 4-27-17) (FY 2024-25)

SP0080303BWhen called for by the District Construction Engineer.
Use with the approval of the Director, Office of Construction.
PROSECUTION AND PROGRESS - PROSECUTION OF WORK - BEGINNING WORK (MANDATORY START DATE).
(REV 3-2-17) (FA 4-27-17) (FY 2024-25)

SP0080303CWhen called for by the District Construction Engineer.
Use with the approval of the Director, Office of Construction.
(Insert Information Required) Do not use with SP0080303A.
PROSECUTION AND PROGRESS - PROSECUTION OF WORK - PARTNERING.
(REV 6-1-23) (FA 10-18-23) (FY 2024-25)

SP0080306 Jobs with 999-16 Pay Item.
PROSECUTION AND PROGRESS - PROSECUTION OF WORK - DISPUTES REVIEW BOARD.
(REV 3-1-24) (FA 3-13-24) (FY 2024-25)

SP0080307DRBJobs with 999-20 Pay Items.
PROSECUTION AND PROGRESS - PROSECUTION OF WORK - REGIONAL DISPUTES REVIEW BOARD.
(REV 3-1-24) (FA 3-13-24) (FY 2024-25)

SP0080307RDRBJobs without 999-20 Pay Items.
PROSECUTION AND PROGRESS - PROSECUTION OF WORK - STATEWIDE DISPUTES REVIEW BOARD.
(REV 3-1-24) (FA 3-13-24) (FY 2024-25)

SP0080308SDRBJobs with 334, 337, 350, 570 or 649 Pay Items.
PROSECUTION AND PROGRESS – COMPUTATION OF CONTRACT TIME – ADJUSTING CONTRACT TIME – INCREASED WORK (LUMP SUM).
(REV 8-1-00) (FY 2024-25)

SP0080401LSLump Sum Projects
 PROSECUTION AND PROGRESS – LIMITATIONS OF OPERATIONS – NIGHT WORK ALONG COASTAL ROADS.
(REV 4-8-19) (FA 7-22-19) (FY 2024-25)

 SP0080401Use when requested by the District Environmental Office
PROSECUTION AND PROGRESS - LIMITATIONS OF OPERATIONS - FENCING.
(REV 6-17-04) (FA 7-13-04) (FY 2024-25)

SP0080408Jobs on Limited Access Highways
PROSECUTION AND PROGRESS - LIMITATIONS OF OPERATIONS - CONTAMINATED MATERIAL (MERCURY-CONTAINING DEVICES AND LAMPS).
(REV 11-6-95) (FA 12-27-95) (FY 2024-25)

SP0080409Jobs with Lighting

PROSECUTION AND PROGRESS - SUSPENSION OF CONTRACTOR'S OPERATIONS - SPECIAL EVENTS.
(REV 5-21-21) (FA 1-3-22) (FY 2024-25)


SP0080604Use on jobs with Special Events.
PROSECUTION AND PROGRESS - COMPUTATION OF CONTRACT TIME - GENERAL (REDUCED PRODUCTIVITY).
(REV 12-22-98) (FA 1-19-99) (FY 2024-25)

SP0080701AUse with approval of the District Construction Engineer.
PROSECUTION AND PROGRESS - COMPUTATION OF CONTRACT TIME - GENERAL (A+B BIDDING).
(REV 7-24-96) (FA 9-3-96) (FY 2024-25)

SP0080701ABA+B Bidding. Use with the approval of the District Construction Engineer.
Use with SP0020501AB, SP0030100AB, SP0030203AB, and SP0081300AB.
PROSECUTION AND PROGRESS - COMPUTATION OF CONTRACT TIME - GENERAL (SHORTENED CONTRACT TIME).
(REV 2-14-94) (FY 2024-25)

SP0080701BUse with the approval of the Director, Office of Construction.
PROSECUTION AND PROGRESS - COMPUTATION OF CONTRACT TIME - GENERAL (HIGHER PRODUCTION RATES).
(REV 12-22-98) (FA 2-1-99) (FY 2024-25)

SP0080701CUse when requested by the District Construction Engineer.
PROSECUTION AND PROGRESS - LIQUIDATED DAMAGES FOR FAILURE TO COMPLETE THE WORK.
(REV 5-4-23) (FA 9-21-23) (FY 2024-25)

SP0081000Use on all revenue producing projects.
PROSECUTION AND PROGRESS - DAMAGE RECOVERY.
(REV 8-7-17) (FY 2024-25)

SP0081200Use when requested by the District Construction Engineer.
(Do not use with Lane Rental)
PROSECUTION AND PROGRESS - ALTERNATIVE BIDDING.
(REV 7-28-97) (FY 2024-25)

SP0081300AAll Jobs with Alternative Bidding. Use with the approval of the District Construction Engineer.
8-13. INCENTIVE - DISINCENTIVE FOR A+B.
(REV 7-27-04) (FA 7-28-04) (FY 2024-25)

SP0081300ABA+B Bidding. Use with the approval of the District Construction Engineer. Use with SP0020501AB, SP0030100AB, SP0030203AB, and SP0080701AB.
8-13.  "BONUS" PAYMENT AND WAIVER OF CONTRACTOR CLAIMS.

(REV 5-19-04) (FA 7-13-04) (FY 2024-25)

SP0081300ABBA+B Jobs with Bonus. Use with the approval of the District Construction Engineer.
8-13. " BONUS " PAYMENT AND WAIVER OF CONTRACTOR CLAIMS.
(REV 7-27-04) (FA 7-28-04) (FY 2024-25)

SP0081300BBonus (Date Specific) Use with the approval of the District Construction Engineer.
8-13. "BONUS" PAYMENT AND WAIVER OF CONTRACTOR CLAIMS.
(REV 7-27-04) (FA 7-28-04) (FY 2024-25)

SP0081300BCDBonus (Calendar Days) Use with the approval of the District Construction Engineer.
8-13. INCENTIVE - DISINCENTIVE.
(REV 7-27-04) (FA 7-28-04) (FY 2024-25)
SP0081300IDIncentive - Disincentive. Use with the approval of the District Construction Engineer. Do not use with SP0081300MID.
8-13. INCENTIVE - DISINCENTIVE FOR LANE RENTAL DAYS.
(REV 9-25-03) (FA 12-24-03) (FY 2024-25)
SP0081300IDLRIncentive-Disincentive for Lane Rental Days. Use with the approval of the District Construction Engineer. Do not use with SP0081300LR or SP0081300LRDR.
8-13. LIQUIDATED SAVINGS FOR EARLY COMPLETION.
(REV 5-18-99) (FA 6-10-99) (FY 2024-25)

SP0081300LQSLiquidated Savings. Use with the approval of the District Construction Engineer.
8-13. PAY ADJUSTMENT FOR FEWER-MORE LANE RENTAL DAYS.
(REV 4-29-97) (FA 5-7-97) (FY 2024-25)
SP0081300LRLane Rental. Use with the approval of the District Construction Engineer. Use with SP0020501LR, SP0030100LR, and SP0081300LRDR.
8-13. DAMAGE RECOVERY.
(REV 9-25-03) (FA 12-24-03) (FY 2024-25)
SP0081300LRDRLane Rental. Use with the approval of the District Construction Engineer. Use with SP0020501LR, SP0030100LR, and SP0081300LR.
8-13. “BONUS” PAYMENT AND WAIVER OF CONTRACTOR CLAIMS.
(REV 4-12-06) (FA 4-25-06) (FY 2024-25)
SP0081300MBMilestone Bonus. Use with the approval of the District Construction Engineer. Do not use with SP0081300B or SP0081300BCD.
8-13. INCENTIVE - DISINCENTIVE.
(REV 2-9-06) (FA 4-25-06) (FY 2024-25)

SP0081300MIDMilestone Incentive-Disincentive. Use with the approval of the District Construction Engineer. Do not use with SP0081300ID.
MEASUREMENT AND PAYMENT (LUMP SUM).
(REV 7-1-21) (FA 7-28-21) (FY 2024-25)

SP0090103LSLump Sum Projects.
MOBILIZATION (LUMP SUM). 
(REV 10-17-19) (FA 11-25-19) (FY 2024-25)

SP1010000LSLump Sum Projects.
CLEARING AND GRUBBING - REMOVAL OF EXISTING BRIDGES - GENERAL.
(REV 9-10-07) (FA 2-15-08) (FY 2024-25)
SP1100601Use with approval of the District Construction Engineer and signed Agreement from the Local Agency receiving the material. 
CLEARING AND GRUBBING - REMOVAL OF EXISTING BRIDGES - ASBESTOS CONTAINING MATERIALS (ACM) IDENTIFIED PRIOR TO THE WORK.
(REV 11-10-16) (FA 1-26-17) (FY 2024-25)

SP1100606Use when areas of Asbestos Abatement are identified in the Plans.
CLEARING AND GRUBBING (MATERIAL FOR REEF ESTABLISHMENT).
(REV 7-10-95) (FA 6-21-99) (FY 2024-25)

SP1101107Jobs with 110-84 Pay Item.
EXCAVATION AND EMBANKMENT - DESCRIPTION - IDENTIFIED AREAS OF CONTAMINATION.
(REV 11-10-16) (FA 1-26-17) (FY 2024-25)

SP1200100AUse when contaminated areas are delineated in the Plans.
MILLING OF EXISTING ASPHALT PAVEMENT - STOCKPILING.
(REV 8-17-22) (FA 2-14-00) (FY 2024-25)
SP3270100When the Plans provide a location for stockpiling milled material. Insert quantity to be retained. Use "all, tons, square yards", etc. (Insert Information Required)
MILLING OF EXISTING ASPHALT PAVEMENT - EQUIPMENT.
(REV 12-1-93) (FY 2024-25)

SP3270200Use when requested by the district Construction Engineer.
MILLING OF EXISTING ASPHALT PAVEMENT - STRUCTURAL PAVE BACK.
(REV 8-17-22) (FA 12-30-19) (FY 2024-25)

SP3270301Use with approval from the District Construction Engineer. Requires paving back a lift of structural asphalt before opening to traffic.
HOT MIX ASPHALT - GENERAL CONSTRUCTION REQUIREMENTS - SMOOTHNESS INCENTIVE/DISINCENTIVE.
(REV 8-17-22) (FA 2-22-18) (FY 2024-25)

SP3300802 Use on all interstate and limited access asphalt pavement roadway projects. IRI-based Incentive/Disincentive on smoothness.

SUPERPAVE ASPHALT CONCRETE 

(REV 5-4-21) (FA 7-14-21) (FY 2024-25)

SP3340203Use on projects with available coring data.
CEMENT CONCRETE PAVEMENT (COLORED CONCRETE).
(REV 5-11-16) (FA 5-12-16) (FY 2024-25)

SP3500200Use when the Plan
pay item 350-30 is included or colored structural concrete is included.
LANDSCAPING.
(REV 10-30-19) (FA 1-7-20) (FY 2024-25)

SP5800000Non-Federal Aid Jobs with Landscaping.
Use when requested by the DDE.
LANDSCAPING.
(REV 5-11-21) (FA 7-14-21) (FY 2024-25)

SP5800000FA All Federal Aid Jobs with Landscaping.
Use when requested by the DDE.
TREE AND PALM RELOCATION - CONSTRUCTION.
(REV 7-13-21) (FA 7-14-21) (FY 2024-25)
SP5810000Jobs with Tree and Palm Relocation.
ELECTRICAL POWER SERVICE ASSEMBLIES - DESCRIPTION (Contribution-in-Aid-of Construction).
(REV 6-12-18) (FA 7-2-18) (FY 2024-25)

SP6390100CIACUse with approval of the District Utility Administrator. (Insert Information Required)
HIGHWAY ADVISORY RADIO.
(REV 10-16-15) (FA 12-31-15) (FY 2024-25)

SP6870000Use with the approval of the Chief Engineer.
Supplemental SpecificationsSS0000001 Usage Note

LEGAL REQUIREMENTS AND RESPONSIBILITY TO THE PUBLIC.

(REV 8-24-23) (FA 5-7-24) (8-24)

SS0072500Implemented by Mandatory No. 1. Use on all jobs with lettings August 1, 2024 and later.
Appendices  XAPENDIC Usage Note
TECHNICAL SPECIAL PROVISIONS.

The following Technical Special Provisions are individually signed and sealed but are included as part of this Specifications Package.
  XTSPs Jobs with Technical Special Provisions.