Design Build Specifications - July - December 2019
Design-Build Boiler-Plate
July - December 2019
Design Build Boilerplate* is the Division I Master Document to be used in the Request for Proposal (RFP) for Design-Build projects.
Design Build Pick-List
NOTE: The files below contain optional text which may be incorporated into
the Design-Build Boilerplate to create specific Contract language.
File | Title | Usage Notes |
---|---|---|
To Change Award and Execution Time | ||
SP0030200 | Award and Execution of Contract | When necessary to change standard "Award and Execution" |
Design Build Finance | ||
SP0030600DBF | Execution of Contract and Bond | Use on Design Build Finance projects |
Award and Execution of Contract - Public Records | ||
SP0030900D1-719 | Public Records | All Projects in District 1 |
SP0030900D2-719 | Public Records | All Projects in District 2 |
SP0030900D3-719 | Public Records | All Projects in District 3 |
SP0030900D4-719 | Public Records | All Projects in District 4 |
SP0030900D5-719 | Public Records | All Projects in District 5 |
SP0030900D6-719 | Public Records | All Projects in District 6 |
SP0030900D7-719 | Public Records | All Projects in District 7 |
SP0070201TP-719 | Public Records | All Turnpike Enterprise Projects |
Structures Over 1500 Feet in Length (over water) | ||
SP0050901 | Inspection | Long bridge jobs (1500 feet or longer); modify to suit |
Legal Requirements and Responsibility to the Public-Laws to be observed-Compliance with Federal Endangered Species Act and other Wildlife Regulations | ||
SP0070104-1 | Bear | Use when called for by the District Environmental Permit Office |
SP0070104-2 | Eagle | Use when called for by the District Environmental Permit Office |
SP0070104-3 | Gopher | Use when called for by the District Environmental Permit Office |
SP0070104-4 | Manatees | Use when called for by the District Environmental Permit Office |
SP0070104-5 | Sawfish | Use when called for by the District Environmental Permit Office |
SP0070104-6 | Sea Turtle | Use when called for by the District Environmental Permit Office |
SP0070104-7 | Indigo Snake | Use when called for by the District Environmental Permit Office |
SP0070104-8 | Sturgeon | Use when called for by the District Environmental Permit Office |
SP0070104-9 | Seagrass Beds | Use when called for by the District Environmental Permit Office |
SP0070104-10 | Bats | Use when called for by the District Environmental Permit Office |
SP0070104-11 | Bats in Bridges | Use when called for by the District Environmental Permit Office |
Toll Facility | ||
SP0070201TP-719 | Permits and Licenses (No free passes will be issued to the Contractor for use on the Toll Facility) | All Jobs with Toll Facilities. |
Toll Facility | ||
SP0071101-tolls | Preservation of Property for Toll Facilities. | Use with approval of the District Traffic Operations Engineer. |
Operations Within Railroad Right-of-Way | ||
SP0071104RR | Operations within Railroad Right-of-Way | Use on Projects involving CSX Transportation, FEC, South Florida Rail Corridor and the Central Florida Rail Corridor. |
Utilities - Florida Gas Transmission Company | ||
SP0071105FGT | Projects Involving Florida Gas Transmission Company | Use on Projects involving Florida Gas Transmission Company (FGT). Use with SP0071201FGT. |
SP0071201FGT | Projects Involving Florida Gas Transmission Company with Encroachment Agreements | Use on Projects involving Florida Gas Transmission Company (FGT) with Encroachment Agreements. Use with SP0071105FGT. |
Legal Requirements and Responsibility to the Public | ||
SP0072700 | Equal Employment Opportunity Requirements | All Non-Federal Aid Projects |
SP0072800 | Preference to State Residents | All Non-Federal Aid Projects |
SP0072900 | Legal Requirements and Responsibility to the Public - E-Verify | All Projects |
SP0073000 | Legal Requirements and Responsibility to the Public - Scrutinized Companies | All Projects |
SP0073100 | Legal Requirements and Responsibility to the Public - Title VI Assurance - DOT 1050.2A, Appendix A and Appendix E | All Federal Aid Projects |
Partnering | ||
SP0080306 | Prosecution of Work - Partnering | 999-16 |
Disputes Review Board | ||
SP0080307RDRB | Regional Disputes Review Board | Jobs without Pay Item No. 999-20 |
Jobs with Lighting | ||
SP0080409 | Contaminated Material - Mercury-Containing Devices and Lamps | Jobs with lighting. |
Liquidated Damages for Tolls | ||
SP0081000 | Prosecution and Progress - Amount of Liquidated Damages | Use on revenue producing projects. |
Damage Recovery | ||
SP0081200 | Prosecution and Progress-Damage Recovery | Use when requested by the District Construction Engineer. |
Alternative Bidding | ||
SP0081300A | Prosecution and Progress | All Jobs with Alternative Bidding. Use with the approval of the District Construction Engineer. |
SP0081300B | "Bonus" Payment and Waiver of Contractor Claims - Date Specific | Bonus (Date Specific) Use with the approval of the District Construction Engineer. |
SP0081300BCD | "Bonus" Payment and Waiver of Contractor Claims - Calendar Day | Bonus (Calendar Days) Use with the approval of the District Construction Engineer. |
SP0081300ID | Incentive - Disincentive | Incentive - Disincentive. Use with the approval of the District Construction Engineer. |
SP0081300LQS | Liquidated Savings for Early Completion | Liquidated Savings. Use with the approval of the District Construction Engineer. |
SP0081300MB | "Bonus" Payment and Waiver of Contractor Claims - Milestone | Milestone Bonus. Use with the approval of the District Construction Engineer. Do not use with SP00813000B or SP0081300BCD. |
SP0081300MID | Incentive - Disincentive - Milestone | Milestone Incentive - Disincentive. Use with the approval of the District Construction Engineer.. Do not use with SP0081300ID) |
Design Build Attachments to the RFP
DIVISION II CHANGES | ||
SP1010000DB | Mobilization | Use on all Design Build Projects. |
SP1050813DB | Contractor Quality Control General Requirements | Use when Geotechnical Services are required for the project. |
SP4550000DB | Structures Foundations | Use when Geotechnical Services are required for the project. |
VALUE ADDED DEVELOPMENTAL SPECS | ||
Dev475-115 | Value Added Bridge Components | Use when requested and approved by the District Construction Engineer. |