Design Build Specifications - FY 2023-24
Design Build Boilerplates
*Effective July 1, 2023, through December 31, 2023
**Effective January 1, 2024, through June 30, 2024
*Design Build Boilerplate *is the Division I Master Document to be used in the Request for Proposal (RFP) for Design-Build projects and includes the Cost Savings Initiative. For more information, see DCE memo 23-03.
**Design Build Boilerplate (BABA) is the Division I Master Document to be used in the Request for Proposal (RFP) for Design-Build projects and includes updated BABA requirements to be used as of January 1, 2024. For more information, see PM memo 23-03.
Design Build Specifications
NOTE: Please refer to the FY 2023-24 Workbook for additional specifications to consider incorporating into your Design Build Projects.
File | Title | Usage Notes |
---|---|---|
Design Build Finance | ||
SP0030600DBF | Execution of Contract and Bond | Use on Design Build Finance projects. |
Design Build Attachments to the RFP
DIVISION II CHANGES | ||
SP1010000DB | Mobilization | Use on all Design Build Projects. |
SP1050813DB | Contractor Quality Control General Requirements | Use when Geotechnical Services are required for the project. |
SP4550000DB | Structures Foundations | Use when Geotechnical Services are required for the project. |
SP4750000DB | Value Added Bridge Components | Use when requested and approved by the District Construction Engineer. |