Estimates Bulletins and Memos

Date of MemoEstimates Bulletin Number: SubjectEffective DateReferenced Documents
December 31, 201515-08: Initial Contingency Pay ItemImmediately, for all projects in which an authorization estimate has not been completedCPAM and Basis of Estimates
December 31, 201515-07: Utility Pipe and Related Pay ItemsJuly 2017, or earlierBasis of Estimates
August 28, 201515-06: Concrete Piling- 100% Dynamic Testing
Note: This is a joint bulletin with Structures Design
July 2015- for specific projects onlyBasis of Estimates
July 9, 201515-05: Reflective Strips
Note: This is a joint bulletin with Traffic Ops
January 2016, or earlierBasis of Estimates, Traffic Engineering Manual (TEM)
July 8, 201515-04: Monitor Existing Structures
Note: This is a joint bulletin with Roadway Design, Structures Design, and Materials
January 2016, or earlierBasis of Estimates, Plans Preparation Manual
February 13, 201515-01: Implementation of Landscape ContractsImmediately 
February 6, 201515-03: Protection of Existing Structures
Rescinded; see Estimates Bulletin 15-04.
July 2015Basis of Estimates, Plans Preparation Manual
January 27, 2015WEBINAR: Pavement Markings
The webinar, with presentation and audio, is posted on the Design Office's Training- Engineering Academy page at: http://www.fdot.gov/design/Training/EngineeringAcademy/Library.shtm
The presentation ( Pavement Markings Jan 2015.pdf) and Question/Answer (Pavement Marking Q and A.pdf) files are available here.
January 22, 201515-02: Rumble Stripe
Note: This is a joint bulletin with Roadway Design Bulletin 15-03.
July 2015Basis of Estimates, Plans Preparation Manual
January 23, 201515-01: Pavement Marking Materials Selection
Note: Refer to Roadway Design Bulletin 15-02 for additional requirements.
July 2015Basis of Estimates, Plans Preparation Manual
Estimates Bulletins will remain effective until either, an official manual revision is published, or the Estimates Bulletin is made void.
For assistance, please contact Estimates Systems Support.