2019 District 2 Letting & Project Information
2019 Lettings
Expand all
Collapse all
Important Letting Documents
Proposal ID | County | Major Work Type | Addendum |
E2X28-R0 | Dixie, Gilchrist, Levy | Remove Trees, Stumps, and Debris BDI CONTRACT | |
E2X32 | Lafayette, Taylor | Outfall Ditches BDI CONTRACT | |
E2X38-R0 | Baker Columbia, Hamilton, Suwannee, Union | Power Shear Equipment to Trim Trees BDI CONTRACT | |
E2X84 | Columbia | Asphalt Concrete Repairs | |
E2X88-R0 | Alachua | Mill & Replace Failing Asphalt | |
E2Y73-R0 | Alachua | Edge & Sweep Right of Ways |
Important Letting Documents
Proposal ID | County | Major Work Type | Addendum |
E2X31 | Lafayette, Taylor | Sodding BDI CONTRACT | |
E2X33 | Taylor | Sidewalk Installation BDI CONTRACT | |
E2X89-R0 | St. Johns | Slope Machine Mowing | |
E2Y36 | Lafayette, Taylor | Asphalt Repairs | |
E2Z01-R0 | Alachua | Tree Trimming BDI CONTRACT | |
E2Z02-R0 | Alachua | Tree Trimming & Brush Removal BDI CONTRACT | |
E2Z09 | Duval | Subsurface Polyurethane Injection | 1 |
Important Letting Documents
Proposal ID | County | Major Work Type | Addendum |
E2X07 | Duval | Electrical Work, Traffic Signals BDI CONTRACT | |
E2X97 | Lafayette, Taylor | Tree Trimming and Brush Removal | |
E2Y17 | Duval | Highway Landscaping and Irrigation Systems | |
E2Y23 | Baker | Electrical Work BDI CONTRACT | |
E2Y25 | St. Johns | Hot Plant-Mixed Bituminous Courses | |
E2Y37 | Lafayette | Spot repairs to Non-Paved Shoulders | |
E2Y66-R0 | Alachua | Large Machine Mowing, Large Machine Herbicide Mowing | |
E2Y97 | Alachua, Columbia, Hamilton | Remove trees and Brush Debris BDI CONTRACT | |
E2Z08 | District-Wide | Final Pavement Markings | |
E2Z11-R0 | Alachua | Intermediate Mowing, Slope Mowing |
Important Letting Documents
Proposal ID | County | Major Work Type | Addendum |
E2X99-R0 | Gilchrist, Levy | Furnish & Apply Herbicides | 0 |
E2Y13 | Duval | Highway Landscaping & Irrigation Systems | 0 |
E2Y54 | Taylor | Remove & Dispose of Silt | 0 |
E2Y60-R0 | Gilchrist, Levy | Large Machine Mowing with Inside Mower Deck Application | 0 |
E2Y64-R0 | Alachua | Replace Concrete Mitered End Sections | 0 |
E2Y99 | Duval | Storm Drain Pipe Replacement | 0 |
E2Z05 | Duval | Mathews Bridge Deck Repair | 0 |
E2Z07 | Lafayette, Taylor | Replace Side Drain Pipes BDI CONTRACT | 0 |
E2Z10-R0 | Alachua | Large machine Mowing, Large Machine Herbicide Mowing | 0 |
E2Z20 | MOVED TO APRIL 25 LETTING | 1, 2 | |
E2Z21 | MOVED TO APRIL 25 LETTING | 1, 2 | |
E2Z26-R0 | Lafayette, Taylor | Herbicide Application | 0 |
Important Letting Documents
Proposal ID | County | Major Work Type | Addendum |
E2X73 | Duval | Highway Landscaping, Irrigation Systems on I-95 Overland Bridge | 1, 2 |
E2Y14 | Duval | Highway Landscaping, Irrigation Systems on SR 152 | 0 |
E2Y27 | Duval | Hot Plant-Mixed Bituminous Courses, Drainage, Maintenance of Traffic | 0 |
E2Y44-R0 | Baker, Columbia, Hamilton, Suwannee, Union | Apply Herbicides to Roadside Vegetation | 0 |
Z2199 | Clay, Duval, Nassau, Putnam, St. Johns | Eastern Regional Contract for Sign Repair and Replacement | 0 |
Z2200 | Clay, Duval, Nassau, Putnam, St. Johns | Eastern Regional Contract for Sign Repair and Replacement | 0 |
Z2201 | Alachua, Baker, Bradford, Columbia, Dixie, Gilchrist, Hamilton, Lafayette, Levy, Madison, Suwannee, Taylor, Union | Western Regional Contract for Sign Repair and Replacement | 0 |
Z2202 | Alachua, Baker, Bradford, Columbia, Dixie, Gilchrist, Hamilton, Lafayette, Levy, Madison, Suwannee, Taylor, Union | Western Regional Contract for Sign Repair and Replacement | 0 |
Z2203-R0 | Dist-Wide | Winter Weather Event (WWE) Support | 0 |
Important Letting Documents
- 60 Day Advertisement
- 30 Day Advertisement
Proposal ID | County | Major Work Type | Addendum |
E2Y75 | Duval | Highway Lighting Upgrade | |
E2Z30 | Columbia | Asphalt Concrete Repairs | |
E2Z31 | Duval, St. Johns | X-Lite Guardrail End Treatment Upgrades | |
E2Z40-R0 | Dist-Wide | Landscaping |
Important Letting Documents
Proposal ID | County | Major Work Type | Addendum |
E2Y80 | Clay | Grading, Hot Plant-Mixed Bituminous Courses, Intermediate Bridges | |
E2X66 | Duval | Grading, Intermediate Bridges, Drainage | |
E2Y81 | Duval | Bridge Painting | |
E2Y88-R0 | St. Johns | Storm Water System | |
E2Z22 | Hamilton | Pavement Marking, Roadway Signing | |
E2Z55 | Gilchrist | Drainage | |
E2Z58 | District-Wide | X-Lite Type Approach Terminals | 1 |
Important Letting Documents
Proposal ID | County | Major Work Type | Addendum |
E2Y45 | Baker, Columbia, Suwannee | Asphalt Repair | |
E2Y59 | Levy | Mill & Repave Asphalt | |
E2Y79 | Duval | Electrical Work, Traffic Signal | |
E2Y84 | Gilchrist | Flexible Paving, Hot Plant-Mixed Bituminous Courses | |
E2Y85 | District-Wide | Underground Utilities (Water & Sewer) | 1 |
E2Z44-R0 | St. Johns | Traffic Control Devices | |
E2Z57 | Duval | Apply High Density Mineral Bond | |
E2Z60-R0 | Taylor | Edging & Sweeping | |
E2Z61 | Columbia | Subsurface Pressure Grouting |
Important Letting Documents
Proposal ID | County | Major Work Type | Addendum |
E2Y65-R0 | Alachua | Remove Accumulated Silt | |
E2Y71 | Duval | Paint Removal via Hand and Power Tool Cleaning Surface Preparation | 1 |
E2Y72 | Columbia, Hamilton, Taylor | Clean and Desilt Box Culverts | 1 |
E2Z36 | Duval | Traffic Signals, Maintenance of Traffic | |
E2Z38 | Duval | Drainage | |
E20A3 | District-Wide | District-Wide Thermoplastic Contract | |
E20A5-R0 | Alachua | Tree, Stump, and Brush Removal (BDI) | |
E20A6 | Alachua | Tree Trimming (BDI) |
2019 Award & Posting / Bid Tabulations
Expand all
Collapse all
Posted on January 28, 2019
5:00 P.M.
PROPOSAL/CONTRACT | INTENT TO AWARD - CONTRACTOR'S NAME | DATE AWARDED |
E2X28-R0 | W. D. Gardner, LLC | 2/1/2019 |
E2X32 | Concept Construction and Demolition, LLC | 2/1/2019 |
E2X84 | Anderson Columbia Co., Inc. | 2/1/2019 |
E2X88-R0 | Hicks Seal Coating and Striping, LLC | 2/1/2019 |
E2Y73-R0 | Shosha Services, LLC | 2/1/2019 |
2nd Posting on February 4, 2019
5:00 P.M.
PROPOSAL/CONTRACT | INTENT TO AWARD - CONTRACTOR'S NAME | DATE AWARDED |
E2X38-R0 | Frank J. Capallia dba Complete Tree Service | 2/8/2019 |
Posted on March 4, 2019
5:00 P.M.
PROPOSAL/CONTRACT NO. - BID TABS | INTENT TO AWARD - CONTRACTOR'S NAME | DATE AWARDED |
E2X31 | Green Maintenance and Cleaning, Inc. | 3/8/2019 |
E2X33 | Concept Construction and Demolition, LLC | 3/8/2019 |
E2X89-R0 | W.D. Gardner, LLC | 3/8/2019 |
E2Y36 | Hicks Seal Coating and Striping, LLC | 3/8/2019 |
E2Z01-R0 | Frank J. Capallia dba Complete Tree Service | 3/8/2019 |
E2Z09 | J. D. Hinson Company | 3/8/2019 |
Posted on March 18, 2019
5:00 P.M.
PROPOSAL/CONTRACT NO. - BID TABS | INTENT TO AWARD - CONTRACTOR'S NAME | DATE AWARDED |
E2Z02-R0 | Serur Development, LLC | 3/21/2019 |
1st Posting April 1, 2019
5:00 P.M.
PROPOSAL/CONTRACT NO. - BID TABS | INTENT TO AWARD - CONTRACTOR'S NAME | DATE AWARDED |
E2X07 | PowerCore, Inc. | 4/5/2019 |
E2X97 | Serur Development, LLC | 4/5/2019 |
E2Y17 | Frankie Valdez Co., Inc. | 4/5/2019 |
E2Y23 | PowerCore, Inc. | 4/5/2019 |
E2Y25 | Preferred Materials, Inc. | 4/5/2019 |
E2Y37 | Moving Earth, Inc. | 4/5/2019 |
E2Y66-R0 | W.D. Gardner, LLC | 4/5/2019 |
E2Y97 | Live Oak Management Group, LLC | 4/5/2019 |
E2Z08 | Acme Barricades, LC | 4/5/2019 |
2nd Posting April 22, 2019
5:00 P.M.
PROPOSAL/CONTRACT NO. - BID TABS | INTENT TO AWARD - CONTRACTOR'S NAME | DATE AWARDED |
E2Z11-R0 | All Seasons Landscape Contractors, Inc. | 4/26/2019 |
Posted on April 29, 2019
5:00 P.M.
PROPOSAL/CONTRACT NO. - BID TABS | INTENT TO AWARD - CONTRACTOR'S NAME | DATE AWARDED |
E2X99-R0 | De Angelo Brothers, LLC | 5/3/2019 |
E2Y13 | Oasis Landscape Services, Inc. | 5/3/2019 |
E2Y54 | Pump Jet Vac Environmental Services, Inc. | 5/3/2019 |
E2Y60-R0 | Suwannee Forest Products, Inc. | 5/3/2019 |
E2Y64-R0 | Maer Homes, LLC dba Maer Construction | 5/3/2019 |
E2Y99 | Maer Homes, LLC dba Maer Construction | 5/3/2019 |
E2Z05 | Gibson & Associates, Inc. | 5/3/2019 |
E2Z07 | CDM Contracting, Inc. | 5/3/2019 |
E2Z10-R0 | Valle Management, LLC | 5/3/2019 |
E2Z26-R0 | Curb Appeal Services, Inc. | 5/3/2019 |
Posted on May 28, 2019
12:00 P.M.
Proposal/Contract No. – Bid Tabs | Intent to Award – Contractor’s Name | Date Awarded |
E2X73 | Midwestern Construction , Inc. | 6/3/2019 |
E2Y14 | Oasis Landscape Services, Inc. | 6/3/2019 |
E2Y27 | Maer Homes, LLC dba Maer Construction | 6/3/2019 |
E2Y44-R0 | Waters Brothers Environmental, Inc. | 6/3/2019 |
Z2199 | Acme Barricades, LC | 6/3/2019 |
Z2200 | Acme Barricades, LC | 6/3/2019 |
Z2201 | Acme Barricades, LC | 6/3/2019 |
Z2202 | Acme Barricades, LC | 6/3/2019 |
Z2203 | No Bids Received | N/A |
Posted on July 29, 2019
12:00 P.M.
Proposal/Contract No. – Bid Tabs | Intent to Award – Contractor’s Name | Date Awarded |
E2Y77 | Traffic Control Devices, Inc. | 8/2/2019 |
Posted on September 23, 2019
12:00 P.M.
Proposal/Contract No. – Bid Tabs | Intent to Award – Contractor’s Name | Date Awarded |
E2Y90 | Tuttle Dozer Works, Inc. | 9-27-19 |
Posted on September 30, 2019
12:00 P.M.
Proposal/Contract No. – Bid Tabs | Intent to Award – Contractor’s Name | Date Awarded |
E2Y58 | Burnett Civil Contracting of Florida, LLC | 10-4-2019 |
Posted on October 28, 2019
12:00 P.M.
Proposal/Contract No. – Bid Tabs | Intent to Award – Contractor’s Name | Date Awarded |
E2X66 | Continental Heavy Civil Corp. | 11/4/2019 |
E2Y80 | Sacyr Construccion S.A. | 11/4/2019 |
E2Y81 | Elite industrial Painting, Inc. | 11/4/2019 |
E2Y88-R0 | EnviroWaste Services Group, Inc. | 11/4/2019 |
E2Z22 | Emerald Coast Striping, LLC | 11/4/2019 |
E2Z55 | Maer Homes, LLC dba Maer Construction | 11/4/2019 |
E2Z58 | Southeast Highway Guardrail & Attenuators, LLC | 11/4/2019 |
Posted on November 25, 2019
12:00 P.M.
Proposal/Contract No. – Bid Tabs | Intent to Award – Contractor’s Name | Date Awarded |
E2Y45 | Anderson Columbia Co., Inc. | 12/3/2019 |
E2Y59 | V. E. Whitehurst & Sons, Inc. | 12/3/2019 |
E2Y79 | Traffic Control Devices, Inc. | 12/3/2019 |
E2Y84 | Anderson Columbia Co., Inc. | 12/3/2019 |
E2Y85 | Anderson Columbia Co., Inc. | 12/3/2019 |
E2Z44-R0 | Acme Barricades, LC | 12/3/2019 |
E2Z57 | Whitaker Contracting Corp. | 12/3/2019 |
E2Z60-R0 | T & M Lawn-Fence Service, Inc. | 12/3/2019 |
E2Z61 | Foundation Services of Central Florida, Inc. | 12/3/2019 |
Posted on December 9, 2019
12:00 P.M.
Proposal/Contract No. – Bid Tabs | Intent to Award – Contractor’s Name | Date Awarded |
E2Y94 | REJECT ALL BIDS |
Posted on March 23, 2020
10:30 AM
Proposal/Contract No. – Bid Tabs | Intent to Award – Contractor’s Name | Date Awarded |
E20A5-R0 | W. D. Gardner, LLC | 3/26/2020 |
Posted on January 13, 2020
10:30 AM
Proposal/Contract No. – Bid Tabs | Intent to Award – Contractor’s Name | Date Awarded |
E2Y65-R0 | Tuttle Dozer Works, Inc. | 1/17/2020 |
E2Y71 | Gemstone, LLC | 1/17/2020 |
E2Y72 | EnviroWaste Services Group, Inc. | 1/17/2020 |
E2Z36 | American Lighting and Signalization, LLC | 1/17/2020 |
E2Z38 | CDM Contracting, Inc. | 1/17/2020 |
E20A3 | TRP Construction Group, LLC | 1/17/2020 |
E20A6 | Suwannee Forest Products, Inc. | 1/17/2020 |