District Two Letting & Project Information
Current Letting & Project Information
2025 Lettings
Expand all
Collapse all
Important Letting Documents
|
|
Proposal ID | County | Major Work Type | Addendum |
E21J1-R0 | Lafayette, Taylor | Tree Trimming Pruning of Trees | |
Taylor | Shredding of Standing Trees | ||
E21P1 | Lafayette, Dixie | Hot Plant-Mixed Bituminous Courses | |
E21P5-R0 | Dixie, Gilchrist, and Levy | Edging and Sweeping of Sidewalks and Curbs | |
E21T5-R0 | Duval, Nassau, St. Johns | Maintenance of Traffic, Installation, Replacement of Highway Signing |
2024 Lettings
Expand all
Collapse all
Important Letting Documents
|
|
Proposal ID | County | Major Work Type | Addendum |
E21D3-R0 | District-wide | Perform Routine Bridge Maintenance Repairs | |
E21L0-R0 | St. Johns | BDI Trim Trees, Remove Trees, Clear Underbrush and Power-Shear | |
E21L1-R0 | Alachua and Bradford | Remove and Replace Concrete Mitered End Sections | |
E21L2-R0 | St. Johns | Furnish, Install, Maintain, and Remove Traffic Control Devices |
Important Letting Documents
|
|
Proposal ID | County | Major Work Type | Addendum |
E21C3-R0 | Alachua, Bradford | BDI Removal and Replacement of Concrete Mitered End Sections | |
E21D5 | Districtwide | MOVED TO FEBRUARY 21, 2024 LETTING | 1 |
E21F7-R0 | Districtwide | Electrical Work, Roadway Signing, Traffic Signal | |
E21H8 | Taylor | Supply all Equipment, Materials, Labor, and Incidentals to Mill and Resurface | |
E21H9 | Lafayette, Taylor | Provide Equipment, Labor, Materials, Maintenance of Traffic (MOT) | |
E21I1-R0 | Lafayette, Madison, Taylor | Provide Equipment and Operators Necessary for the Transportation of Bulk Materials | |
E21L4 | Columbia | Furnish, Install and Establish Highway Landscaping and Irrigation at I-75 at US 90 | |
E21L5 | Alachua | Furnish, Install and Establish Highway Landscaping and Irrigation at SR 20 (US 441) | |
E21L6-R0 | Alachua, Bradford | BDI Manual Herbicide Application to Roadside Ditches, Outfall Ditches | |
E21L7-R0 | Alachua | Routine Tree Pruning and Trimming Behind Sidewalks, Curb & Gutter |
Important Letting Documents
|
|
Proposal ID | County | Major Work Type | Addendum |
E21D5 | Districtwide | Pile preservation with pile jackets and elastomeric coating | 1 |
Important Letting Documents
|
|
Proposal ID | County | Major Work Type | Addendum |
E20X6 | Duval | Furnish, Install and Establish Highway Landscaping and Irrigation at I-10 at US 301 | |
E21B4 | Duval | R&R Major Bridge - Over Water | |
E21C6-R0 | Dixie, Gilchrist, Levy | BDI Trim Trees to the Very Top of the Canopy and Remove Brush | |
E21F8-R0 | Districtwide | BDI Provide and Install Bahia, Bermuda, St. Augustine, Centipede Sod | |
E21F9 | Columbia | BDI Reconstruct and Dispose of Concrete Ditch Pavement | |
E21G0-R0 | Districtwide | Remove, Repair and Replace Damaged Guardrail | |
E21G1 | Baker, Columbia, Hamilton, Suwannee | Mill, Place and Compact Asphalt Concrete, Replace Damaged Thermoplastic | |
E21I0 | Lafayette, Taylor | Provide all Equipment, Labor, Maintenance of Traffic (MOT) | |
E21L3-R0 | Districtwide | Furnish, Install, Maintain, and Remove Traffic Control Devices | |
E21M4-R0 | Dixie, Gilchrist, Levy | Furnish, Install, Maintain, and Remove Traffic Control Devices | |
E21M6-R0 | Baker, Columbia, Hamilton, Suwannee, Union | MOVED TO MARCH 27, 2024 LETTING | 1 |
E21M7-R0 | Baker, Columbia, Hamilton, Suwannee, Union | Furnish, Install, Maintain, and Remove Traffic Control Devices | |
E21N0-R0 | Baker, Columbia, Hamilton, Suwannee, Union | MOVED TO MARCH 27, 2024 LETTING | 1 |
Important Letting Documents
|
|
Proposal ID | County | Major Work Type | Addendum |
E21N0-R0 | Baker, Columbia, Hamilton, Suwannee, Union | Large Machine Mowing, Slope Mowing, Litter Removal | 1 |
E21M6-R0 | Baker, Columbia, Hamilton, Suwannee, Union | Intermediate Mowing with Collection and Disposal, Slope Mowing | 1 |
Important Letting Documents
|
|
Proposal ID | County | Major Work Type | Addendum |
E21C4 | Taylor | BDI Remove and Dispose of Silt, Debris, Vegetation, Soil, Rock | |
E21C5 | Taylor | BDI Furnish all Equipment, Materials, Labor, Maintenance of Traffic | |
E21J7-R0 | Dixie, Gilchrist, Levy | Furnish and Apply Herbicides to Vegetation | |
E21L9-R0 | St. Johns | Provide all Materials, Labor, and Incidentals to Replace Side and Cross Drains | |
E21N2-R0 | Lafayette, Madison, Taylor | Furnish, Install, Maintain, and Remove Traffic Control Devices | |
E21N3-R0 | Alachua, Bradford | Mechanical Tree Pruning and Trimming and Tree and Brush Removal | |
E21N4-R0 | Alachua, Bradford | Trimming over Travel Lanes and around Highway Lighting Fixtures | |
E21N5-R0 | Dixie, Gilchrist, Levy | Large Mowing, Slope Mowing, Litter Removal, Disposal, and Trim Around Appurtenances | |
E21N9 | Taylor | Mill and Resurface the Roadway, Replacement of all Thermoplastic Striping | |
E200W | Union | Hot Plant-Mixed Bituminous Courses, Traffic Signal, Mobilization, Maintenance of Traffic |
Important Letting Documents
|
|
Proposal ID | County | Major Work Type | Addendum |
E21N7 | Columbia, Hamilton, Madison, Suwannee, Taylor | Perform Fence Repair and Replacement pursuant to the terms of this Contract | |
E21N8 | Madison | Install Complete Drip Irrigation System |
Important Letting Documents
|
|
Proposal ID | County | Major Work Type | Addendum |
E21B3 | Duval | R&R Intermediate Bridges | |
E21H4 | Bradford | Furnish, Install and Establish Highway Landscaping and Floating Fountain |
Important Letting Documents
|
|
Proposal ID | County | Major Work Type | Addendum |
E21H3-R0 | St. Johns | BDI Edge and Sweep Primary Roadways | |
E21I5-R0 | Duval | Performance Based Landscape Contract | 1 |
E21J9-R0 | Dixie, Gilchrist, Levy | BDI Remove trees, Stumps, Debris, and Trim Trees | |
Z2256-R0 | Clay, Duval, Nassau, Putnam, St. Johns | Provide Lighting Repair and Replacement Operations | |
Z2257-R0 | Alachua, Baker, Bradford, Columbia, Dixie, Gilchrist, Hamilton, Lafayette, Levy, Madison, Suwannee, Taylor, Union | Provide Lighting Repair and Replacement Operations |
Important Letting Documents
|
|
Proposal ID | County | Major Work Type | Addendum |
E21G8 | Alachua | Stabilization using Potassium Chloride Solution on SR 24 | |
E21K0 | Duval | Furnish, Install and Establish Highway Landscaping and Irrigation at SR 9A |
Important Letting Documents
|
|
Proposal ID | County | Major Work Type | Addendum |
E21G9-R0 | Alachua, Bradford | BDI Remove sediment from ditch pavement | |
E21H7 | Putnam | Furnish, install, and establish highway landscaping and irrigation at SR 20 | |
E21I8 | Putnam | Furnish, install, and establish highway landscaping and irrigation at SR 20 (S 9th Street) | |
E21K8-R0 | Districtwide | Desilting of Pipes and Box Culverts | |
E21O7-R0 | Districtwide | Removal of trees, stumps, debris and tree trimming | |
E21P7-R0 | Duval, Nassau, St. Johns | Maintenance of traffic, Installation / replacement of highway signing | |
E21P8-R0 | St. Johns | Remove and dispose of silt, debris, vegetation, soil, rock, or any type of blockage | 1 |
Important Letting Documents
|
|
Proposal ID | County | Major Work Type | Addendum |
E21K1 | Duval | Furnish, install and establish highway landscaping and irrigation at I-295 (SR 9A) | |
E21S2 | Alachua | Expansive clay stabilization using Potassium Chloride Solution Injection |
Important Letting Documents
|
|
Proposal ID | County | Major Work Type | Addendum |
E21O8 | Suwannee | MOVED TO NOVEMBER 20, 2024 LETTING | 1 |
Important Letting Documents
|
|
Proposal ID | County | Major Work Type | Addendum |
E21O8 | Suwannee | BDI Construct concrete curb, concrete spill ways | 1 |
Important Letting Documents
|
|
Proposal ID | County | Major Work Type | Addendum |
E21G4-R0 | Bradford | Large machine mowing, slope mowing, intermediate mowing, and litter removal | |
E21G5-R0 | Bradford, Alachua | Mechanical tree pruning and trimming, selective tree pruning and trimming | |
E21G6-R0 | Alachua, Bradford | Large machine mowing, slope mowing, intermediate mowing | |
E21G7-R0 | Alachua, Bradford, Dixie, Levy, Gilchrist | Milling and replacing failing asphalt in travel lanes | |
E21H6 | Putnam | Furnish, install and establish highway landscaping and irrigation at SR 20 from CR 315 | |
E21I2-R0 | Lafayette, Taylor | Tree removal, stump grinding, and debris removal including providing all equipment | |
E21I3-R0 | Lafayette, Taylor | Large machine mowing with computer controlled inside mower deck application |
2024 Award & Posting / Bid Tabulations
Expand all
Collapse all
Posted on February 26, 2024
9:00 AM
PROPOSAL/CONTRACT NO. - BID TAB | INTENT TO AWARD - CONTRACTOR'S NAME | DATE AWARDED |
E21C3-R0 | Burnett Civil Contracting of Florida, LLC | 3/1/2024 |
E21F7-R0 | American Lighting and Signalization, LLC | 3/1/2024 |
E21H8 | REJECT ALL BIDS | N/A |
E21H9 | Midwestern Construction, Inc. | 3/1/2024 |
E21I1 | North Florida Trucking and Excavation, LLC | 3/1/2024 |
E21L4 | Oasis Landscape Services, Inc. | 3/1/2024 |
E21L5 | Oasis Landscape Services, Inc. | 3/1/2024 |
E21L6-R0 | Airboat Addicts, Inc. | 3/1/2024 |
E21L7-R0 | T & M Lawn-Fence Service, Inc. | 3/1/2024 |
Posted on April 1, 2024
8:00 AM
PROPOSAL/CONTRACT NO. - BID TAB | INTENT TO AWARD - CONTRACTOR'S NAME | DATE AWARDED |
E21D5 | REJECT ALL BIDS | N/A |
Posted on March 25, 2024
11:30 AM
PROPOSAL/CONTRACT NO. - BID TAB | INTENT TO AWARD - CONTRACTOR'S NAME | DATE AWARDED |
E20X6 | Oasis Landscape Services, Inc. | 3/29/2024 |
E21B4 | Cekra, Inc. | 3/29/2024 |
E21F8-R0 | Rogar Management & Consulting Florida, LLC | 3/29/2024 |
E21F9 | Burnett Civil Contracting of Florida, LLC | 3/29/2024 |
E21G0-R0 | Southeast Highway Guardrail & Attenuators, LLC | 3/29/2024 |
E21G1 | Turtle Infrastructure Partners, LLC | 3/29/2024 |
E21I0 | GRSC, Inc. | 3/29/2024 |
E21L3-R0 | Bob's Barricades, Inc. | 3/29/2024 |
E21M4-R0 | Cornerstone Barricades, Inc. | 3/29/2024 |
E21M7-R0 | Cornerstone Barricades, Inc. | 3/29/2024 |
Posted on April 8, 2024
8:00 AM
PROPOSAL/CONTRACT NO. - BID TAB | INTENT TO AWARD - CONTRACTOR'S NAME | DATE AWARDED |
E21C6-R0 | Comprehensive Land Solutions, LLC | 4/12/2024 |
Posted on April 29, 2024
2:30 PM
PROPOSAL/CONTRACT NO. - BID TAB | INTENT TO AWARD - CONTRACTOR'S NAME | DATE AWARDED |
E21C4 | Maer Homes, LLC dba Maer Construction | 5/3/2024 |
E21C5 | JT Ruby Contracting, Inc. | 5/3/2024 |
E21J7-R0 | Curb Appeal Services, Inc. | 5/3/2024 |
E200W | Preferred Materials, Inc. | 5/3/2024 |
Posted on May 6, 2024
8:00 AM
PROPOSAL/CONTRACT NO. - BID TAB | INTENT TO AWARD - CONTRACTOR'S NAME | DATE AWARDED |
E21L9-R0 | Maer Homes, LLC dba Maer Construction | 5/13/2024 |
E21N2-R0 | Bob’s Barricades, Inc. | 5/13/2024 |
E21N5-R0 | GRSC, Inc. | 5/13/2024 |
E21N9 | Turtle Infrastructure Partners, LLC | 5/13/2024 |
Posted on June 10, 2024
8:00 AM
PROPOSAL/CONTRACT NO. - BID TAB | INTENT TO AWARD - CONTRACTOR'S NAME | DATE AWARDED |
E21N3-R0 | Treeline Forestry, LLC | 6/14/2024 |
Posted on June 17, 2024
8:00 AM
PROPOSAL/CONTRACT NO. - BID TAB | INTENT TO AWARD - CONTRACTOR'S NAME | DATE AWARDED |
E21N4-R0 | GRSC, Inc. | 6/21/2024 |
Posted on September 23, 2024
10:00 AM
PROPOSAL/CONTRACT NO. - BID TAB | INTENT TO AWARD - CONTRACTOR'S NAME | DATE AWARDED |
E21G9-R0 | Nexus Contracting, Inc. | 9/30/2024 |
E21H7 | Arazoza Brothers Corporation | 9/30/2024 |
E21I8 | Oasis Landscape Services, Inc. | 9/30/2024 |
E21K8-R0 | Merrell's Grade-All, Inc. | 9/30/2024 |
E21O7-R0 | W. D. Gardner, LLC | 9/30/2024 |
E21P8-R0 | Nexus Contracting, Inc. | 9/30/2024 |
Posted on October 28, 2024
10:30 AM
PROPOSAL/CONTRACT NO. - BID TAB | INTENT TO AWARD - CONTRACTOR'S NAME | DATE AWARDED |
E21P7-R0 | REJECT ALL BIDS | N/A |
Posted on December 2, 2024
12:30 PM
PROPOSAL/CONTRACT NO. - BID TAB | INTENT TO AWARD - CONTRACTOR'S NAME | DATE AWARDED |
E21O8 | JT Ruby Contracting, Inc. | 12/6/2024 |
Previous Lettings
2023 Letting Information: Letting, Project, Addenda, Award & Posting Information, Bid Tabulations
2022 Letting Information: Letting, Project, Addenda, Award & Posting Information, Bid Tabulations
2021 Letting Information: Letting, Project, Addenda, Award & Posting Information, Bid Tabulations
2020 Letting Information: Letting, Project, Addenda, Award & Posting Information, Bid Tabulations
2019 Letting Information: Letting, Project, Addenda, Award & Posting Information, Bid Tabulations
2018 Letting Information: Letting, Project, Addenda, Award & Posting Information, Bid Tabulations
Addenda & Amendments
Contractors will be notified of all Amendments and are required to download the Amendments from the CPP Online Ordering System per these instructions: Amendment Instructions (PDF)
Amendment files can be downloaded by clicking on the links. Amendments must be downloaded to the location of your original EBS file prior to preparing the bid.
If you do not have Acrobat Reader you can download it free at Get Acrobat Reader.