Documents and Publications
Documents and Publications
You must have the Adobe® Acrobat® Reader properly installed on your computer in order to view and print the following documents. If you do not have Adobe® Acrobat® Reader, download a free copy here. Please follow the manufacturer's instructions for installing and using this software. Some of these files are large and may take several minutes to download.
Draft Reports - September 2020
- I-95 Air Quality Technical Memorandum
- I-95 Type 2 Categorical Exclusion
- I-95 Contamination Screening Evaluation Report
- I-95 Natural Resources Evaluation Report
- I-95 Noise Study Report
- I-95 Sociocultural Effects Evaluation Report
- I-95 Location Hydraulics Report
- I-95 Conceptual Drainage Report
- I-95 Preliminary Engineering Report
- I-95 Final Cultural Resource & Assessment Survey Report
- I-95 Preliminary Engineering Report - Appendix A Concept Plans
- Section 4 (F) Determination of Applicability
- Section 4 (F)No Use Determination
- Systems Interchange Modification Report
- Appendix A - Amended Methodology Letter of Understanding
- Appendix B - Raw Traffic Data & Signal Timing Data
- Appendix C - 2016 Existing Freeway HCS Operational Analysis
- Appendix D - 2016 Existing Synchro Intersection Analysis
- Appendix E - 2013-2015 Historical Crash Maps and Statistical Summaries
- Appendix F - Travel Demand Forecast
- Appendix G - 2020 & 2040 No-build Freeway HCS Analysis
- Appendix H - 2020 & 2040 No-build Synchro Intersection Analysis
- Appendix I - Interchange Supplemental Traffic Forecast Scenarios
- Appendix J - Conceptual and Signing Plans
- Appendix K - 2020 & 2040 Build 1 Freeway HCS Operational Analysis
- Appendix L - 2020 & 2040 Build 1 Synchro Intersection Analysis
- Appendix M - 2020 & 2040 Build 2 Freeway HCS Operational Analysis
- Appendix N - 2020 & 2040 Build 2 Synchro Intersection Analysis
- Appendix O - 2020 & 2040 Build 2A Freeway HCS Operational Analysis
- Appendix P - 2020 & 2040 Build 2A Synchro Intersection Analysis
- Appendix Q - 2040 No-build and Build Safety Analysis
Newport Center Webinar Meeting – September 16, 2020
- Newport Center Webinar Announcement Flyer
- Newport Center Webinar Presentation
- Newport Center Webinar Meeting Video
Project Updates
DRAFT Reports – October 7, 2019
(Note: Reports are being updated and will be reposted prior to the Fall 2020 Public Hearing)
- Type 2 Categorical Exclusion
- Preliminary Engineering Report
- Conceptual Drainage Report
- Location Hydraulics Report
- Noise Study Report
- Air Quality Technical Memorandum
- Natural Resources Evaluation Report
- Sociocultural Effects Evaluation Report
- Contamination Screening Evaluation Report
- Final Cultural Resource Assessment Survey
- Systems Interchange Modification Report with Appendices
Project Alternatives Public Workshop #2 – November 2018
- Handouts
- Presentation
Project Alternatives Public Workshop #1 – April 2018
- Fact Sheet - English
- Fact Sheet - Spanish
- 95 Express Board
- Evaluation Matrix
- Long Plot
- Military Trail Renderings
- Newport Center Renderings
- Project Location Board (Center Alignment)
- Project Location Board (North Alignment)
- Traffic Simulation Board
Project Kick-Off Public Meetings – March/April 2017