| DCE Memo's 2015 |
01-15 | Separation Technologies - Big Bend, Apollo Beach FLY ASH (FA30) |
02-15 | Revisions To Specification Section 346 - Portland Cement Concrete |
03-15 | Emulsions Now Listed on Approved Products List (*.pdf, 315kb) |
05-15 | Revisions To Specification Section 346 - Portland Cement Concrete |
06-15 | Revisions To Materials Manual Volume II Section 9.2 - Substitutions of Materials - Fly Ash |
07-15 | PG 76-22 (ARB) Supply Issues and Changing to PG 76-22 (PMA) (*.pdf, 80kb) |
08-15 | St Johns River Power Park Fly Ash-Jacksonville (FA17) Revised 4/27/15 |
09-15 | Mass Concrete |
10-15 | Amendment To The Construction Engineering And Inspection Scope Of Services For Hybrid Contracts |
11-15 | Pile Installation Plan - Test Program and Production Pile Schedule |
12-15 | Windrow Paving - Specification Changes To Section 330 - Hot Mix Asphalt - General Construction Requirements |
13-15 | Materials Acceptance and Certification System Implementation, Company Profile Training (*.pdf, 938kb) |
14-15 | MAC Implementation & Contractor QC Plans (*.pdf, 397kb) |
15-15 | Acceptance Test For Dynamic Message Signs |
16-15 | Removal of the Requirement for Endorsements |
17-15 | Unreinforced Concrete Barrier Walls - Disposition of Cracks (pdf, 72kb) |
18-15 | Manufacturers' Warranties |
19-15 | Eliminating Arithmetic Mean |
20-15 | Revisions To Specification Section 353 - Concrete Pavement Slab Replacement |
21-15 | W-Beam Guardrail Panels |
22-15 | Implementation of Vacuum Drying for Density of Cores (*.pdf, 370kb) |
23-15 | MAC Company Profile (*.pdf, 825kb) |
24-15 | Design Standard Index 17727 |