Documents and Resources
- Administrative Action Type 2 Categorical Exclusion
- Air Quality Technical Memorandum
- Conceptual Drainage Pond Siting Report
- Contamination Screening Evaluation
- Contamination Screening Evaluation Appendix
- Contamination Sites Table
- Crystal Heights Park Signed DOA
- Cultural Resources Assessment Survey with SHPO Concurrence
- Geotechnical Report
- Geotechnical Report Borehole Permeability Tests
- Geotechnical Report Groundwater Monitoring Data
- Location Hydraulics Memo
- Natural Resource Evaluation
- No Section 4(f) Use - Quiet Waters Park
- Noise Study Report
- Preliminary Engineering Report
- Project Traffic Analysis Report
- Quiet Waters Park Signed DOA
- Railroad Clear Letter
- SHPO Concurrence Letter
- Sociocultural Effects Report
- Sole Source Aquifer Concurrence Letter
- Sole Source Aquifer EPA Letter
- Traffic Analysis Tech Memo
- Traffic Analysis Tech Report
- USFWS Concurrence Letter
- Utility Assessment Report
- VE Study Response Memo
- Water Quality Impact Evaluation
- 43696412201-CE2-D4-Approved Type 2 CE Determination Report SR-9 I-95
- 436964-1 Systems Interchange Modification Report Sample Road to Hillsboro Boulevard
- 436964-1 Preliminary Engineering Report
- 43696412201-CE2-D4-436964 SW10 PDE SW 12 Avenue TS DEERFIELD
- 43696412201-CE2-D4-436964 Typical Section Package
- 43696412201-CE2-D4-436964-1 Access Management Plan
- 43696412201-CE2-D4-436964-1 Attachment F Sole Source Aquifer Letter Concurrence
- 43696412201-CE2-D4-43696412201-CE2-D4-436964-1 Attachment E FWS Concurrence
- 43696412201-CE2-D4-Noise Study Report
- 3696412201-CE2-D4-Public Involvement Summary Report Volume 1
- 43696412201-CE2-D4-Public Involvement Summary Report Volume 2
- 43696412201-CE2-D4-Revised Conceptual Stage Relocation Plan
- Air Quality Technical Memorandum
- Appendix A Amended MLOU
- Appendix B Raw Traffic Data & Signal Timing Data
- Appendix C 2016 Existing Freeway HCS Operational Analysis
- Appendix D 2016 Existing Synchro Intersection Analysis
- Appendix E 2013-2015 Historical Crash Maps and Statistical Summaries
- Appendix F Travel Demand Forecast - SW 10th Street PD&E PTFM, January 2019
- Appendix F1 SW 10th Street PD&E PTFM Report January 2019
- Appendix F2 SW 10th Street PD&E PTFM Report Appendix Jan 2019
- Appendix G 2020 & 2040 No-Build Freeway HCS Operational Analysis
- Appendix G1 2020 No-Build Freeway HCS Operational Analysis
- Appendix G2 2040 No-Build Freeway HCS Operational Analysis
- Appendix H 2020 & 2040 No-Build Synchro Intersection Analysis
- Appendix H1 2020 No-Build
- Appendix H2 2040 No-Build
- Appendix I June 17, 2021 Supplemental Traffic & June 29, 2018 Alternatives Analysis Memo
- Appendix J Conceptual & Signing Plans
- Appendix K 2020 & 2040 Build 1 Freeway HCS Operational Analysis
- Appendix K1 2020 Build 1 Freeway HCS Operational Analysis
- Appendix K2 2040 Build 1 Freeway HCS Operational Analysis
- Appendix L 2020 & 2040 Build 1 Synchro Intersection Analysis
- Appendix L1 2020 Build 1 Synchro Intersection Analysis
- Appendix L2 2040 Build 1 Synchro Intersection Analysis
- Appendix M 2020 & 2040 Build 2 Freeway HCS Operational Analysis
- Appendix M1 2020 Build 2 Freeway HCS Operational Analysis
- Appendix M2 2040 Build 2 Freeway HCS Operational Analysis
- Appendix N 2020 & 2040 Build 2 Synchro Intersection Analysis
- Appendix N1 2020 Build 2 Synchro Intersection Analysis
- Appendix N2 2040 Build 2 Synchro Intersection Analysis
- Appendix O 2020 & 2040 Build 2 Sub Scenario Freeway HCS Operational Analysis
- Appendix O1 2020 Build 2 Sub Scenario Freeway HCS Operational Analysis
- Appendix O2 2040 Build 2 Sub Scenario Freeway HCS Operational Analysis
- Appendix P 2020 & 2040 Build 2 Scenario Synchro Intersection Analysis
- Appendix P1 2020 Build 2 Sub Scenario Synchro Intersection Analysis
- Appendix P2 2040 Build 2 Sub Scenario Synchro Intersection Analysis
- Appendix Q 2040 No-Build and Build Safety Analysis
- Appendix Q1 Arterial Safety Analysis
- Appendix Q2 Freeway Safety Analysis
- Appendix Q3
- Appendix Q4 Crash Reduction Analysis Data
- Appendix R Access Management Plan & Typical Section Package
- Conceptual Drainage Report
- Contamination Screening Evaluation Report
- CRAS Addendum SHPO Concurrence Letter Signed
- Cultural Resources Assessment Survey Addendum
- Cultural Resources Assessment Survey Report
- Determination of Applicability Mayo Howard Park
- Determination of Applicability Oveta McKeithen Recreation Complex
- Determination of Applicability Sand Pine Preserve
- Determination of Applicability Teen Center
- Determination of Applicability Willie James Ford Linear Park
- Final SW 10th Street SIMR
- Location Hydraulics Report
- Natural Resources Evaluation Report
- Sociocultural Effects Evaluation Report
- Water Quality Impact Evaluation
Public Hearing Exhibits
- SW 10th Street Connector Project Industry Forum Attendees- August 8, 2022
- SW 10th Street Connector Project Industry Forum Presentation - August 8, 2022
- Welcome
- Project Location Map
- PD&E Process
- Purpose and Need
- Project Schedule
- COAT Recommendations Overview
- COAT Recommendations
- SW10thStreet One Corridor Dual Facilities
- Previous Alternatives Workshop No.1
- Previous Alternatives Workshop No.2
- Alternatives Development Through Public Engagement
- I95 Preferred Alt Connections
- I95 Preferred Alt Access Points
- Connector Lane Access
- Local Road Access Modifications
- Potential Aesthetic Enhancements
- Noise Evaluation Process
- Noise Wall Locations
- Noise Wall Renderings
- SW 10th Street Evaluation Matrix
- Summary of Differences
- Rendering Comparison
- Typical Section Comparison
- Peak Hour Traffic Comparison
- Traffic Comparison Summary
- Travel Time Comparison
- NEPA
- Title VI
- Turnpike Access Points
- SW 10th Street Ponds
- Noise Wall Configuration
- Turnpike PD&E Schedule
- Next Steps
- Rendering Boards
- Rendering Booklet
- Rendering Booklet with Noise walls
- SW 10th Street Build Alternatives Exhibit
- I-95 Preferred Alternative Exhibit
- I95 Local Lanes Under Bridge
- Public Hearing Presentation
- Public Hearing Session 1A – Formal Comment Period
- Public Hearing Session 1B – Formal Comment Period
- Public Hearing Session 1C – Formal Comment Period
- Public Hearing Session 2A – Formal Comment Period
- Public Hearing Session 2B – Formal Comment Period
- Public Hearing Session 2C – Formal Comment Period
- Public Hearing Session 3A – Formal Comment Period
- Public Hearing Session 3B – Formal Comment Period
- Public Hearing Session 3C – Formal Comment Period
Webinar Exhibits (June/July 2020)
- Welcome
- Webinar Information
- Location Map
- PD&E Process
- Purpose and Need
- Schedule
- COAT Recommendations
- SW 10th Street Typical Section
- Public Engagement History
- Recent Project Enhancements
- SW 10th Street Roll Plot
- I-95 Roll Plot
- Newport Center Area (Under Bridge) Roll Plot
- Access
- Aesthetics
- Noise
- Alternatives Comparison
- NEPA Requirements
- Webinar Presentation
- Webinar No. 1 Q&A Slides
- Webinar No. 2 Q&A Slides
- Webinar No. 3 Q&A Slides
- Webinar Recordings No. 1
- Webinar Recordings No. 2
- Webinar Recordings No. 3
- Webinar Q&A Matrix
- SW 10th Street Renderings
- SW 10th Street Renderings (with noise walls)
- Turnpike Access Points
Community Meetings – 2020
- 2020-07-27 – Century Village Presentation Slides
- 2020-07-27 - Century Village Meeting Recording
- 2020-08-05 - Waterford Homes Presentation Slides
- 2020-08-05 – Waterford Homes Meeting Recording
- 2020-08-20 – The Villas at Meadow Lakes Presentation Slides
- 2020-08-20 – Villas at Meadow Lakes Meeting Recording
- 2020-08-27 – Waterways Presentation Slides
- 2020-08-27 – Waterways Meeting Recording
- 2020-09-30 – Independence Bay Presentation Slides
- 2020-09-30 - Independence Bay Meeting Recording
- 2020-10-01 – Waterford Courtyards Presentation Slides
- 2020-10-01 - Waterford Courtyards Meeting Recording
Videos
Alternatives Public Workshop #2 - Documents
- Handout
- Presentation
- Exhibits – SW 10 Street
- Full Depressed Alternative
- Partial Depressed Alternative
- Alternative Description - Partial Depressed
- Roll Plot - Partial Depressed (1 of 3)
- Roll Plot - Partial Depressed (2 of 3)
- Roll Plot - Partial Depressed (3 of 3)
- Partial Depressed (Powerline to Canal)
- Renderings - Partial Depressed Alternatives
- Fly-Through - Partial Depressed – Video
- Evaluation Matrix (Partial Depressed)
- Non-Depressed / No Managed Lane Access Alternative
- Evaluation Matrix
- Traffic
- Noise Walls
- Aesthetics
- Depressed Section – Constructability & Permanent Pump Stations
- I-95 Managed Lanes
Alternatives Public Workshop #1 - Documents
- Meeting Invitation and location map - English
- Meeting Invitation and location map - Spanish
- Handout
- Presentation
- Exhibits - SW 10 STREET
- Welcome
- Presentation Schedule
- Location Map
- Project Development Process Flowchart
- COAT Recommendations
- Traffic Operations (AM Peak Hour Comparison)
- Traffic Operations (PM Peak Hour Comparison)
- Typical Sections
- Alignment Alternatives, SW 10th Street, Turnpike to SW 30th Ave.
- Alignment Alternatives, SW 10th Street, SW 30th Ave. to I-95
- Rendering (View 1)
- Rendering (View 2)
- Rendering (View 3)
- Rendering (View 4)
- Constructability (10 phase) with pictures
- Constructability - Powerline Road
- Traffic Management During Construction
- Evaluation Matrix (No Build vs Depressed Managed Lanes)
- Evaluation Matrix (Center vs North Alignments)
- Title VI
- Project Schedule
- Exhibits - SR 9/I-95
Public Kick-Off - Documents
Newport Center Webinar Meeting – September 16, 2020
- Newport Center Webinar Announcement Flyer
- Newport Center Webinar Presentation
- Newport Center Webinar Meeting Video
Project Updates
Project Alternatives Public Workshop #2 – November 2018
- Handouts
- Presentation
Project Alternatives Public Workshop #1 – April 2018
- Fact Sheet - English
- Fact Sheet - Spanish
- 95 Express Board
- Evaluation Matrix
- Long Plot
- Military Trail Renderings
- Newport Center Renderings
- Project Location Board (Center Alignment)
- Project Location Board (North Alignment)
- Traffic Simulation Board