Roadway Design
2020 FDOT Design Manual
| |
2020 FDOT Design Manual | |
To view the Implementation Bulletin for the current FDM, please see RDB19-07
|
Development and Processes - Complete FDM Part 1 | ||||
Chapter | Webinar | Bulletin | Errata | Description |
Introduction | ||||
Introduction | ||||
Context Classification | ||||
Glossary of Terms | ||||
Standard Forms | ||||
Public Involvement | ||||
Aesthetic Design | ||||
Exempt Public Documents | ||||
Plans Development Processes | ||||
Webinar | Initial Engineering Design Process | |||
Webinar | RDB20-03 | Errata | Final Engineering Design Process | |
Update Engineering Design Process | ||||
Right of Way Requirements | ||||
Resurfacing, Restoration, and Rehabilitation (RRR) | ||||
Standard Plans and Standard Specifications | ||||
Roundabout Evaluation (Evaluation Forms) | ||||
Plans Submittal, Review, and Processing | ||||
Webinar | Errata | Design Submittals | ||
Webinar | Bridge Project Development | |||
Webinar | Design Exceptions and Design Variations | |||
Engineering Design Estimate Process | ||||
RDB20-05 | Project Quality Control Plan | |||
125 | RDB20-05 | Quality Assurance Reviews | ||
Lane Elimination Projects | ||||
Community Aesthetic Features | ||||
Federal Aid Project Certification | ||||
Final Plans Processing | ||||
Signing and Sealing Documents | ||||
Plans Processing | ||||
Plan Revisions | ||||
Retention of Electronic Documents | ||||
Lump Sum Projects | ||||
Lump Sum Projects | ||||
Design Criteria - Complete FDM Part 2 | ||||
Chapter | Webinar | Bulletin | Errata | Description |
Context Based Design | ||||
Context Based Design | ||||
Webinar | Design Controls | |||
Webinar | Speed Management | |||
Roadway Geometrics | ||||
Webinar | Arterials and Collectors | |||
Limited Access Facilities | ||||
Intersections | ||||
Modern Roundabouts (Roundabout Design Aids) | ||||
Driveways | ||||
Webinar | RDB20-07 | Errata | Roadside Safety | |
Earthwork | ||||
D217 | Developmental Design Criteria: Diverging Diamond Interchanges | |||
Other Facilities | ||||
RDB20-02 | Railroads | |||
Utilities | ||||
Webinar | Pedestrian Facilities | |||
Webinar | Errata | Bicycle Facilities | ||
Webinar | Shared Use Paths | |||
Public Transit Facilities | ||||
Patterned Pavement and Architectural Pavers | ||||
227 | Freight - Under Development | |||
Webinar | Landscape Design | |||
Selective Clearing and Grubbing Design | ||||
Traffic Design | ||||
RDB20-02 | Signing and Pavement Marking | |||
Webinar | Lighting | |||
Signalization | ||||
Intelligent Transportation Systems (ITS) | ||||
Temporary Traffic Control | ||||
Webinar | Transportation Management Plan (TTC Forms) | |||
Lane Closure Analysis | ||||
Webinar | Traffic Pacing Design | |||
Portable Changeable Message Signs | ||||
Drainage and Permits | ||||
Hydraulic Data and Agency Permits | ||||
RDB24-01 | Stormwater Pollution Prevention Plan (SWPPP) Development | |||
Structures | ||||
Bridge Structures | ||||
Structural Supports for Signs, Luminaires, and Traffic Signals | ||||
Retaining Walls | ||||
Geosynthetic Design | ||||
Noise Walls and Perimeter Walls | ||||
Reinforced Concrete Box and Three-Sided Culverts | ||||
Webinar | Bicycle and Pedestrian Bridges | |||
Webinar | Working Drawing Submittals | |||
Plans Production - Complete FDM Part 3 | ||||
Chapter | Webinar | Bulletin | Errata | Description |
Production of Plans | ||||
Sequence of Plans Preparation | ||||
Key Sheet | ||||
Signature Sheet | ||||
Summary of Pay Items | ||||
Drainage Map and Bridge Hydraulic Recommendation Sheet | ||||
Typical Sections | ||||
Summary of Quantities | ||||
Summary of Drainage Structures and Optional Materials Tabulation | ||||
Project Layout | ||||
Project Control | ||||
General Notes | ||||
Roadway Plan-Profile | ||||
Special Profiles and Back-of-Sidewalk Profiles | ||||
Intersection and Interchange Details and Layouts | ||||
Drainage Structures | ||||
Stormwater Facilities | ||||
Special Details | ||||
Soil Survey | ||||
Cross Sections | ||||
Stormwater Pollution Prevention Plan (SWPPP) | ||||
Webinar | Temporary Traffic Control Plan | |||
Utility Adjustments | ||||
Selective Clearing and Grubbing | ||||
Miscellaneous Structures | ||||
Signing and Pavement Marking Plans | ||||
Lighting Plans | ||||
Signalization Plans | ||||
Intelligent Transportation Systems (ITS) Plans | ||||
Webinar | Landscape Plans | |||
Utility Work by Highway Contractor Agreement (UWHC) Plans | ||||
NexGen Plans Production | ||||
Chapter | Webinar | Bulletin | Errata | Description |
Crosswalk from Traditional Plans Production to Model-centric Plans Production | ||||
Plans Production | ||||
PSM20-02 | Production of NexGen Plans | |||
901 | Sequence of Plans Preparation - Under Development | |||
902 | Estimated Quantities Report - Under Development | |||
904 | KMZ Project File - Under Development | |||
PSM20-02 | Cross Sections | |||
Roadway Plans Set | ||||
910 | Key Sheet and Signature Sheet - Under Development | |||
PSM20-02 | Model Management | |||
912 | Project Control - Under Development | |||
913 | Typical Sections - Under Development | |||
914 | General Notes - Under Development | |||
PSM20-02 | Roadway Plan-Profile | |||
916 | Drainage Structures - Under Development | |||
917 | Stormwater Facilities - Under Development | |||
918 | Drainage Map - Under Development | |||
919 | Soil Survey - Under Development | |||
920 | Temporary Traffic Control Plan - Under Development | |||
921 | Utility Adjustments - Under Development | |||
922 | Selective Clearing and Grubbing - Under Development | |||
923 | Miscellaneous Structures - Under Development | |||
924 | Stormwater Pollution Prevention Plan (SWPPP) - Under Development | |||
Component Plans Set | ||||
940 | Signing and Pavement Marking Plans - Under Development | |||
941 | Signalization Plans - Under Development | |||
942 | Intelligent Transportation Systems (ITS) Plans - Under Development | |||
943 | Lighting Plans - Under Development | |||
944 | Landscape Plans - Under Development | |||
945 | Architectural Plans - Under Development | |||
946 | Structure Plans - Under Development | |||
947 | Toll Facilities Plans - Under Development | |||
948 | Utility Work by Highway Contractor Agreement (UWHC) Plans - Under Development |