SR A1A Over Sebastian Inlet Bridge Replacement and Resurfacing, Restoration and Rehabilitation of SR A1A from Sand Dollar Lane to south of Sebastian Inlet
Documents and Publications
Hybrid Public Meeting: July 17, 2024
- Comment Form
- 3R Typical Section
- Renderings
- Project Map
- Roll Plot | SR-A1A Sebastian Inlet Bridge Replacement
- Hybrid Public Meeting Presentation
- Hybrid Public Meeting Recording Video
- 445618-1-52-01 and 445618-2-52-01 Final Public Meeting Summary
- Project’s Acquisition and Restoration Council (ARC) Process Update
Public Hearing: December 13 & 15, 2022
- Meeting Flyer
- Public Hearing Open House Presentation
- Public Hearing Formal Presentation
- Comment Form
- Virtual Public Hearing Presentation Video
Display Boards
- Welcome
- Title VI
- Contact Information
- Project Area
- About the Study
- Project Delivery Process
- Section 4(f)
- Section 106
- Bridge Typical Section
- Alternatives Evaluation Process
- Evaluation Matrix
- Preferred Alternative: East Alignment
- Preferred Alternative Bridge Rendering
- Preferred Alternative South Park Entrance Rendering
- Preferred Alternative North Park Entrance Rendering
- Vertical Profile Rendering
Alternatives Public Workshop: January 11 & 13, 2022
- Meeting Flyer
- Alternatives Public Workshop Presentation
- Alternatives Public Workshop - Recording
- Comment Form
- Welcome
- Title VI
- Project Location
- FDOT Transportation Project Delivery Process
- PD&E Study Process
- Project Background and Purpose and Need
- PD&E Study Schedule
- Alternatives Evaluation Process
- Alternative 1: Existing Alignment
- Alternative 2: East Alignment
- Alternative 3: West Alignment
- Bridge Typical Section
- Vertical Profile Comparison
- Proposed Vertical Profile: 51-feet
- Proposed Bridge
- Evaluation Matrix
- Contact Information
- Thank You
Virtual Public Kickoff Meeting: May 11, 2021
- Meeting Flyer
- Virtual Public Kickoff Meeting Presentation
- Comment Form
- Virtual Public Kickoff Meeting Presentation - Recording
Feasibility Study Documents
- Feasibility Study Report
- Appendix A - Preliminary Plans
- Appendix B - Bridge Sequence of Construction
- Appendix C - Traffic Data and LCA
- Appendix D - Detour Route
- Appendix E - Straight Line Diagram
- Appendix F - Existing As-Builts
- Appendix G - Existing Right of Way
- Appendix H - Preliminary Geotechnical Evaluation
Sebastian Bridge Replacement PD&E Study Documents
- Memorandum: Origin-Destination Data Collection
- Traffic Counts and Traffic Projections
- Benthic Survey Memo
- Navigation Needs Analysis Memo
- Noise Analysis Methodology
- Seasonal High Groundwater Table (SHGWT) Memo
- Soils Memo
- Traffic Methodology
- USCG Navigation Needs Analysis Memo
- USCG Vertical Clearance Evaluation Memo
- Final Cultural Resource Assessment Survey
- Project Traffic Analysis Report
- Utility Assessment Package
- Natural Resources Evaluation
- Contamination Screening Evaluation Report
- Final Type 2 Categorical Exclusion
- Noise Study Report
- Final Preliminary Engineering Report
- Safety Analysis Report
- Final Section 4(f) Resources