County Road 510 Design Projects


Frequently Asked Questions

Frequently Asked Questions for the other project segments will be posted at a later date. 




Segment 405606-7-52-01

  • What is the purpose of the project?

    The purpose of the proposed project is to create additional capacity on of CR 510 to achieve an acceptable Level of Service (LOS) on the facility in the future. While the roadway currently operates at an acceptable LOS, conditions will deteriorate below acceptable standards if no improvement occurs by 2035, as the roadway will have insufficient capacity to accommodate the future travel demand. 

  • What are the planned improvements?

    Project improvements for CR 510 from CR 512 to 87th Street (405606-7-52-01) include widening the corridor by adding two additional travel lanes and 7-ft buffered bicycle lanes. Pedestrian improvements include 6-ft wide sidewalks on both sides of the roadway, ADA ramps, and pedestrian crosswalk signals (countdown). Traffic signals will be upgraded to mast arms and will be interconnected with adjacent traffic signals. There will be lighting at the signalized intersections. There will be closed stormwater facilities with ponds for water quality treatment. There will be a new bus hub developed around the new proposed pond near the high school providing additional bus bays meeting level boarding and alighting area requirements. The CR 510 culvert near 89th Street will be replaced in-kind with a new box culvert. Water, wastewater, and reuse lines will be replaced or installed.

  • How can I get involved?

    You have the opportunity to receive project-related information through this website and public information meetings. You are encouraged to register to get more information on the Email Updates page of this website. For questions or comments, contact the FDOT Project Manager, Maria Formoso, P.E., P.M.P. Click here to be added to the email or mailing list and receive project updates.

  • How can I obtain the latest design materials?

    The latest materials for CR 510 from CR 512 to 87th Street (405606-7-52-01) will be available on the Documents and Publications page of this website. Please check back regularly for updates as the design is constantly evolving.

  • When will the project be built?

    The projected letting date for CR 510 from CR 512 to 87th Street (405606-7-52-01) is Aug. 28, 2024.

  • When is the next public meeting?

    Information regarding the next public meeting will be posted here and on the homepage. 


For more questions regarding the projects, please contact the project manager:

Ms. Maria Formoso, P.E., P.M.P.
Tel: 954-777-4677
Toll-Free: 1-866-336-8435 ext. 4677
Fax: 954-777-4197
maria.formoso@dot.state.fl.us