Pensacola Bay Bridge Updates and FAQ


🔽 Jump to News Releases 🔽

Pensacola Bay Bridge Repair Update 

 

VIDEO UPDATES

Pensacola Bay Bridge Repair Update Animation
May 26, 2021

In preparation for the future opening of the Pensacola Bay Bridge to traffic, has created an animation to assist motorists in preparing for the traffic alignment on the bridge and how to navigate the 17th Ave Flyover.

PBB Span Demolition
January 2021

FDOT shows its innovative approach to demolish and repair damaged sections of the Pensacola Bay Bridge.

 

PBB Span Demolition
December 2, 2020

FDOT shows its innovative approach to demolish and repair damaged sections of the Pensacola Bay Bridge.

 

Pensacola Bay Bridge Repair Update
November 20, 2020

Increased Resources to Repair the Pensacola Bay Bridge. Florida Department of Transportation contractors and specialists have bolstered their repair efforts to restore traffic on the damaged Pensacola Bay Bridge.

 

Pensacola Bay Bridge Repair Update
October 27, 2020

The Pensacola Bay Bridge repair team talks about the repair process and their approach to the challenges ahead.

 

Pensacola Bay Bridge Repair Update
October 15, 2020

Progress at the bridge continues and one damaged span of the bridge has been removed while crews continue to carefully remove damaged portions from additional spans in order to minimize impacts to the existing structure.

Pensacola Bay Bridge Repair Update
Sep 28, 2020

The Florida Department of Transportation (FDOT) is assessing and inspecting damage to the Pensacola Bay Bridge due to Hurricane Sally. This overview of the bridge highlights the individual components FDOT inspectors are investigating.

NEWSLETTER

Pensacola Bay Bridge Repair Update - November 20, 2020
ReConnect - Pensacola Bay Bridge Repairs Continue (PDF 12.7MB)

Pensacola Bay Bridge Repair Update - October 26, 2020
ReConnect - Pensacola Bay Bridge Repairs Underway (PDF 2.54MB)

FAQ

Is the Pensacola Bay Bridge open?

No, the bridge is closed to all traffic. The structure suffered severe damage on Sept. 16, 2020, after multiple barges used in the construction of the bridge escaped their moorings in the high winds and seas and struck the bridge.

Was anyone injured during the incident?

No. Once damage was identified, FDOT immediately closed the bridge to all traffic. No drivers or vehicles were affected.

How is traffic being detoured while the bridge is being repaired?

Traffic is being detoured to the Garcon Point Bridge (State Road 281) or to State Road 87 in Santa Rosa County. Maps of the detour routes can be found here.

 


 

Garcon Point Bridge Detour 

PBB - Detour Graphic 2

How do I travel from Pensacola to Gulf Breeze or Pensacola Beach? 

  • Travel north on I-110 to I-10 eastbound.
  • Take I-10 eastbound to Exit 22 (Avalon Boulevard/State Road 281).
  • Travel south on S.R. 281, cross the Garcon Point Bridge, and continue to U.S. 98.
  • Travel west on U.S. 98 to Gulf Breeze and Pensacola Beach.

 

PBB - Detour Graphic 3

How do I travel from Gulf Breeze or Pensacola Beach to Pensacola? 

  • Take U.S. 98 eastbound to State Road 281.
  • Travel north on State Road 281.
  • Continue north on S.R. 281, crossing the bay via the Garcon Point Bridge.
  • At I-10, turn west to Pensacola.

 


 

State Road 87 Detour

PBB - Turn by turn directions for SR 87 No. 1 092120 Revision 0

How do I travel from U.S.98 to I-10 using State Road 87?

  • Travel U.S. 98 to State Road 87 in Navarre
  • Go north on State Road 87 to I-10
  • Go west on I-10 to Pensacola

PBB - Turn by turn directions for SR 87 No. 2 092120 Revision 0

From I-10 to U.S. 98, using State Road 87

  • Take I-10, Exit 31 (State Road 87) south.
  • Continue south on State Road 87 to U.S. 98 in Navarre
  • Travel west on U.S. 98 to Gulf Breeze to Pensacola Beach

 


 

Is there a toll on the Garcon Point Bridge?

Currently, the toll suspension on the bridge remains until 6 a.m. Friday, March 12, 2021.

Who is working on inspecting, evaluating, and repairing the bridge?

FDOT has compiled a statewide team of bridge engineering experts to inspect, evaluate, and repair the bridge.

Are there any restrictions on marine traffic?

Yes. The area around bridge repair/construction activities will continue to be an active construction zone. The U.S. Coast Guard has established a 500-yard buffer zone around ALL bridge construction activities. Only low or idle speeds may be used within the buffer zone. Crossing beneath the bridge is restricted to the center navigational channel that is delineated by the bridge arch.

Is the multiuse path open for bicyclists and pedestrians?

No. Bridge damage and subsequent repair activities require closure of the multiuse path. As is the case with vehicular traffic, there are currently no provisions for pedestrians or bicyclists.

How is the Pensacola Bay Bridge constructed?

Constructing the new Pensacola Bay Bridge involves an iterative process that begins with crews driving concrete piles into the bay floor. The piles provide the foundation for the structure. Atop the piles, crews install what is known as trophy pieces, which are concrete structures consisting of a footer, a column, and a cap in a single unit. They’re called trophy pieces because when they are placed in an upright position they resemble an athletic trophy. Once the trophy piece is in place atop the piles they constitute a bridge pier.

 Each of the pier locations are connected horizontally using concrete girders, which are also sometimes referred to as beams. The concrete bridge decks are then cast in place atop the girders. These decks become the riding surface which vehicles use to cross the bridge.

PBB-01

Will the multiuse path have to be repaired before the bridge reopens to vehicles?

No. In addition to the vehicular travel lanes, the Pensacola Bay Bridge includes a 10-foot multiuse path intended for pedestrians and bicyclists. The concrete path rests on the same piers as the vehicle travel lanes, but it is not structurally connected to the bridge deck. For this reason, crews will be able to repair and reopen the bridge to vehicular traffic before finalizing repairs to the multiuse path. 

PBB-02

Where can I find the latest information on Pensacola Bay Bridge repair efforts?

You can subscribe to e-mail updates below, or you may use the social media platforms or digital resources shown here.

FDOT has compiled a statewide team of bridge engineering experts to inspect, evaluate, and repair the bridge.

Twitter:

@MyFDOT_NWFL

Facebook:

Facebook.com/MyFDOTNWFL
Facebook.com/MyPensacolaBayBridge

Instagram:

@myfdot_nwfl
@MyPensacolaBayBridge

Website:

www.FDOT.gov/PensacolaBay
www.PensacolaBayBridge.com

E-Mail:

Info@PensacolaBayBridge.com

 

Where can I find definitions of common bridge-related terminology and information on the bridge inspection process?

You may find this information here.

News Releases

FDOT Re-Opens Pensacola Bay Bridge to Four Lanes

June 17, 2021


Nighttime lane restrictions planned for the Pensacola Bay Bridge

June 10, 2021


Garcon Point Bridge Toll Suspension Further Extended

June 5, 2021


FDOT Re-Opens the Pensacola Bay Bridge 

May 28, 2021


Garcon Point Bridge Toll Suspension Further Extended

May 7, 2021


FDOT's April 29 Updates on the Pensacola Bay Bridge Recovery Efforts 

April 29, 2021

Click on an image to view it in full size.

PBB Flyover Asphalt-thumb
Pensacola Bay Bridge 042921 (1)-thumb
Pensacola Bay Bridge 042921 (3)-thumbPensacola Bay Bridge 042921 (2)-thumb

FDOT’s April 15 Updates on the Pensacola Bay Bridge Recovery Efforts

April 15, 2021

Click on an image to view it in full size.

041221 (1)thumb
041221 (2)thumb
041221 (3)thumb
041221 (4)thumb
PBB April15thumbPBB April15thumb2  

Garcon Point Bridge Toll Suspension Further Extended

April 9, 2021


FDOT’s April 1 Updates on the Pensacola Bay Bridge Recovery Efforts 

April 1, 2021

Click on an image to view it in full size.

PBB040121 (1).jpg - thumb
PBB040121 (2).jpg - thumb
PBB040121 (3).jpg - thumb
PBB040121 (4).jpg - thumb

Garcon Point Bridge Toll Suspension Further Extended

March 12, 2021


FDOT Announces Phased Re-Opening of the Pensacola Bay Bridge 

February 18, 2021

Click on an image to view it in full size.

021821-two-lane transitions-thumb


Garcon Point Bridge Toll Suspension Further Extended

February 11, 2021


FDOT’s January 21 Updates on the Pensacola Bay Bridge Recovery Efforts

January 21, 2021

Click on an image to view it in full size.

01212021-PBB Repair Schedule_Jan21 - thumb
01212021-PBB 11921 (1) - thumb
01212021-PBB 11921 (3)- thumb
01212021-PBB 11921 (4) - thumb

 


First replacement deck concrete pour completed for Pensacola Bay Bridge

January 15, 2021

Click on an image to view it in full size.

011421-PBB-deck-poured-thumb


Garcon Point Bridge Toll Suspension Further Extended

January 12, 2021


FDOT’s January 7 Updates on the Pensacola Bay Bridge Recovery Efforts

January 7, 2021

Click on an image to view it in full size.

01072021-PBB Repair Schedule_JAN7-thumb
01072021-PBB1621 (1)-thumb
01072021-PBB1621 (2)-thumb
01072021-PBB1621 (3)-thumb

 


FDOT’s December 23 Updates on the Pensacola Bay Bridge Recovery Efforts

December 23, 2020

Click on an image to view it in full size.

122320-PBB Repair Schedule_Dec23-thumb
122320-PBB (2)-thumb
122320-PBB-thumb
122320-15 Removing debris from bay bottom-thumb

December 21, 2020

Click on an image to view it in full size.

12212020-PBB Repair Schedule_Dec16-thumb
12212020-PBB Span Dashboard_Dec16_rev1-thumb
12212020-PBB121720 (1)-thumb

 


Garcon Point Bridge Toll Suspension Further Extended

December 11, 2020


FDOT’s December 10 Updates on the Pensacola Bay Bridge Recovery Efforts

December 10, 2020

Click on an image to view it in full size.

12102020 PBB Repair Schedule Dec 9 - thumb
12102020 PBB Span Progress Dashboard Dec 9 - thumb
12102020 PBB Repair- thumb12102020 Pile Driving Pier 16 Interior (2) - thumb



FDOT’s December 3 Updates on the Pensacola Bay Bridge Recovery Efforts

December 3, 2020

Click on an image to view it in full size.

12032020-PBB Repair Schedule_Dec2-thumb
12032020-PBB-thumb
12032020-PBB span removal-thumb

 


FDOT’s November 19 Updates on the Pensacola Bay Bridge Recovery Efforts

November 19, 2020

Click on an image to view it in full size.

PBB-Repair-Schedule-Nov19-Thumb
111620 Tying Trophy Reinforcement Thumb
11-10-2020 Night SHift 3 thumbs



Garcon Point Bridge Toll Suspension Further Extended

November 13, 2020


FDOT’s November 12 Updates on the Pensacola Bay Bridge Recovery Efforts

November 12, 2020

Click on an image to view in full size.

111220-Nov12_Schedule_PBB_Repair-thumb111220-111020 Demo of Span 16-thumb

 


FDOT’s November 5 Updates on the Pensacola Bay Bridge Recovery Efforts

November 5, 2020

Click on an image to view in full size.

110520-PBB_Repair_Schedule-thumb
110520-PBB-Bridge--thumb
110520-Removing-PI-Girder-Span-16-thumb



FDOT’s October 29 Updates on the Pensacola Bay Bridge Recovery Efforts

October 29, 2020

Click on an image to view in full size.

102920-PBB Repair Schedule Oct28 thumb
102920-6 PBB - Aerial - Straight Down 102620 thumb
102920-102520 Boh Demoing Span 69 thumb

 


FDOT’s October 22 Updates on the Pensacola Bay Bridge Recovery Efforts

October 23, 2020

Click on an image to view in full size.

10222020 BOH. Crushing Girder debris at Span 37E thumb
10222020 SBC CK2750 moved to pier 16EB thumb10222020 SBC Driving Pipe Pile for Access at Pier 6 thumb

 


FDOT’s October 15 Updates on the Pensacola Bay Bridge Recovery Efforts

October 15, 2020

Click on an image to view in full size.

10152020-Span 23-24 Curtain Wall Removal 100720-thumb10152020-PBB Barge 4-thumb10152020-PBB Demo 3-thumb

 


FDOT’s October 6 Updates on the Pensacola Bay Bridge Recovery Efforts

October 6, 2020

Click on an image to view in full size.

10062020-Picture1-thumb10062020-Robotic-Hammer-thumb

FDOT’s October 1 Updates on the Pensacola Bay Bridge Recovery Efforts

October 1, 2020


FDOT’s September 28 Updates on the Pensacola Bay Bridge Recovery Efforts

September 28, 2020

Click on an image to view in full size.

09282020-PBB (2)- thumb09282020-PBB (1) - thumb

 


FDOT’s September 24 Updates on the Pensacola Bay Bridge Recovery Efforts

September 24, 2020

Click on an image to view in full size.

Image depticting the missing full span of the Pensacola Bay Bridge, slated for replacementImage depticting the missing half span of the Pensacola Bay Bridge, slated for replacementImage depticting beam replacement and concrete repair of the Pensacola Bay Bridge, slated for replacement

 


Garcon Point Bridge Toll Suspension Further Extended

September 22, 2020

 


FDOT’s September 22 Updates on the Pensacola Bay Bridge Recovery Efforts

September 22, 2020

Image depicting how is the Pensacola Bay Bridge constructed. Constructing the new Pensacola Bay Bridge involves an iterative process that begins with crews driving concrete piles into the bay floor. The piles provide the foundation for the structure. Atop the piles, crews install what is known as trophy pieces, which are concrete structures consisting of a footer, a column, and a cap in a single unit. They’re called trophy pieces because when they are placed in an upright position they resemble an athletic trophy. Once the trophy piece is in place atop the piles they constitute a bridge pier. Each of the pier locations are connected horizontally using concrete girders, which are also sometimes referred to as beams. The concrete bridge decks are then cast in place atop the girders. These decks become the riding surface which vehicles use to cross the bridge.

 


FDOT’s September 21 Updates on Hurricane Sally and Pensacola Bay Bridge Recovery Efforts

September 21, 2020